| 1 | 1 | Sub Heading 1 | | | |
|---|
| 2 | 1.01 | Labour charges Dismantling the out of plumb, Mantapa with the help of High Skilled labour, mechanical equipment, hydraulic machinery after proper documentation like numbering etc., complete. | item1 | 70.5 | Cum |
|---|
| 3 | 1.02 | Labour charges Careful removal of Earth mixed with boulders back filling of the Mantapa for working space and for restoration etc., complete | item2 | 674.98 | Cum |
|---|
| 4 | 1.03 | Labour charges Earth work excavation for foundation and removing the excavated stuff to a distance not exceeding 50 mtrs and with lift up to 1.50 mtrs in hard soil etc., complete. | item3 | 839.38 | Cum |
|---|
| 5 | 1.04 | Labour charges for solling in lime mortar to a dept of 20 cms by using available stone boulders in ratio 1:1:1 etc., complete.(Material supplied departmentally) | item4 | 60.23 | Cum |
|---|
| 6 | 1.05 | Labour charges for providing foundation in UCRS in Lime Mortar 1:1:1 with available stones for foundation and well compacted including curing etc., complete.(materials will be supplied departmentally) | item5 | 391.5 | Cum |
|---|
| 7 | 1.06 | Labour charges for back filling for the Mantapa with boulders and gravel including consolidation, watering etc., complete.,(materials will be supplied departmentally) | item6 | 361.38 | Cum |
|---|
| 8 | 1.07 | Labour charges for restoration of Mantapa/shrine to its original place with the help of High Skilled labour, mechanical equipment, hydraulic machinery and etc., as per photographs, drawing etc., complete. | item7 | 216.81 | Cum |
|---|
| 9 | 1.08 | Providing bed concrete in Lime mortar for uniform flooring of ratio 1:3:6 for fixing of the stone flooring etc., complete. | item8 | 141.91 | Cum |
|---|
| 10 | 1.09 | Labour charges for fixing of new granite flooring stone slabs for missing portion of Mantapa of thickness 0.8 to 0.10mtrs. and 0.40 to 0.60 cms width to a length of 2.50 mtrs. to 3.00 Including cost of dressing, providing proper gravel bedding of 10cms thick including curing and fixing the same with the help of Heavy stone Lifters and etc., complete | item9 | 70.96 | Cum |
|---|
| 11 | 1.1 | Providing and laying weather proof course with lime surkhi (Lime & Brick Jelly) 20mm size in ratio of 1:2 including mixing with binding materials kadakai, jaggery etc, pointing the joints in lime mortar 1:3 filling the concrete, tamping with wooden ballet, plastering top surface in lime mortar 1:3 mixing the binding materials, curing, covering with gunny bags, watering etc., complete. | item10 | 58.98 | Cum |
|---|