| 1 | 1 | Ist Class Brick work in first floor in 1: 6 cement sand mortar including cost of all materials Labour & T & P etc. required for proper completion of work | | 89.71 | CuM |
|---|
| 2 | 2 | R.C.C. 1:1½:3 ( M 20)with stone grit 10-20 mm and coarse sand including cost of all materials, Labour, T&P etc. required for proper completion of work. | | 37.85 | CuM |
|---|
| 3 | 3 | Cutting, bending, binding and placing in position of reinforcement including cost of all materials, labour and T&P required for proper completion of work. | | 2.97 | MT |
|---|
| 4 | 4 | Centering and Shuttering for CC & RCC work including cost of all materials, Labour, T&P etc required for proper completion of work. | | 323.12 | Sq M |
|---|
| 5 | 5 | S/Fixing MS angle iron 40X40X5 mm Door Frame & Window including cost of all materials, Labour, T&P etc. required for proper completion of work. | | 1.71 | Qtl |
|---|
| 6 | 6 | S/F Railing for stairs and Grill works in window,ventilator and balcony ( 50mm X 5mm ) including cost of all materials, Labour, T&P etc required for proper completion of work. | | 463.79 | Kg |
|---|
| 7 | 7 | Fabrication & Fixing in position Aluminium Frame with Glass in Window and Ventilator | | 14.08 | SqM |
|---|
| 8 | 8 | 12 mm thick cement plaster on new surface in 1:4 cement mortar with coarse sand including cost of all materials, Labour, T&P etc required for proper completion of work. | | 850.28 | SqM |
|---|
| 9 | 9 | S/F Fixing of Veitrified Tiles including all materials Labour & T&P etc required for proper completion of work. | | 184.79 | SqM |
|---|
| 10 | 10 | S/F glazed Tiles for toilet including cost of all materials, labour and T&P required for proper completion of work. | | 41.58 | SqM |
|---|
| 11 | 11 | S/F/xing 32 mm thick Flush Door Shutters including cost of all materials, labour and T&P required for proper completion of work. | | 17.74 | SqM |
|---|
| 12 | 12 | Laying two coats of Birla white Putty on new surface including cost of all materials, labour and T&P required for proper completion of work. | | 850.28 | SqM |
|---|
| 13 | 13 | Wall painting with two coats weather paint on new surface including cost of all materials, labour and T&P required for proper completion of work. | | 300.51 | SqM |
|---|
| 14 | 14 | P/L of oil Bound Distemper two coat with one coat primer including cost of all materials, labour and T&P required for proper completion of work. | | 549.77 | SqM |
|---|
| 15 | 15 | Two coat of enamel painting with one coat of primer on old surface after scraping of old painted surface including cost of all materials, labour and T&P required for proper completion of work. | | 42.57 | SqM |
|---|
| 16 | 16 | S/Fixing 20 mm thick Kota stone for steps in stairs including cost of all materials, labour and T&P required for proper completion of work. | | 16.8 | SqM |
|---|
| 17 | 17 | S/F PVC Rain water pipe 110 mm dia 6 kg presser I.S.I. mark including cost of all materials, labour and T&P required for proper completion of work | | 31.2 | RM |
|---|
| 18 | 18 | S/F PVC Rain water pipe 160 mm dia 6 kg presser I.S.I. mark including cost of all materials, labour and T&P required for proper completion of work | | 20 | RM |
|---|
| 19 | 19 | Quantity of Pea-gravel for Water Harvesting Tank | | 0.54 | CUM |
|---|
| 20 | 20 | Quantity of Coarse Sand for Water Harvesting Tank | | 0.81 | CUM |
|---|
| 21 | 21 | Quantity of Shingle(4.75-10)mm for Water Harvesting Tank | | 0.81 | CUM |
|---|
| 22 | 22 | S/C of Stone Boulder (50-150) mm size upto 20 kgs weight from Dala District to work site/Cum | | 0.8 | CUM |
|---|
| 23 | 23 | Sand Filling / Filter in water Harvesting Tank including cost of all materials, labour and T&P required for proper completion of work | | 2.96 | CUM |
|---|
| 24 | 24 | Laying of A C Sheet Corrugated 6 mm thick/Sqm | | 25.4 | Sqm |
|---|
| 25 | 25 | Supplying and Fixing mosquito proof jali having 5 mesh each Cm. made of 24 B WG wire heavy quality and including cost of 25X5 mm Flat iron around the jali, welding etc. complete | | 14.08 | Sqm |
|---|
| 26 | 26 | S/F of MS Door Panel with one coat of primer and two coats of Synthetic enamal painting including all the materials , labour and T&P etc. | | 1 | No |
|---|
| 27 | 27 | Water supply and sanitary work | | 1 | Job |
|---|
| 28 | 28 | Electrification Work | | 1 | Job |
|---|