| 1 | 1 | Sch 'A' Sec -I (Building work)\nNote:- This schedule is not pre-priced by MES and the pre-priced rate as \"Rs. 0.00\" indicated under Col.6. signifies this fact only.\nConstruction of guard Post above guard rest room providing foundation as per plinth Plan -1, for SBC 7.50 ton /sqm, with permanent specification including RCC framed structure etc, complete all as specified and shown in drawing.\n | 1.01 | 3 | EACH |
|---|
| 2 | 2 | Sch 'A' Sec -I (Building work)\nNote:- This schedule is not pre-priced by MES and the pre-priced rate as \"Rs. 0.00\" indicated under Col.6. signifies this fact only\nConstruction of guard Post above guard rest room providing foundation as per plinth Plan -2, for SBC 12.50 ton /sqm, with permanent specification including RCC framed structure etc, complete all as specified and shown in drawing.\n | 1.02 | 3 | EACH |
|---|
| 3 | 3 | Total amount of Sch 'A' Part-II (Internal Electrification) Prepriced amount B/F from Srl page No. 23 | 1.03 | 1 | Lump sum |
|---|
| 4 | 4 | Total amount of Sch 'A' Part-III (Internal water supply) Prepriced amount B/F from Srl page No. 24 | 1.04 | 1 | Lump sum |
|---|
| 5 | 5 | Total amount of Sch 'A' Part-IV (Sewage disposal) Prepriced amount B/F from Srl page No. 26 | 1.05 | 1 | Lump sum |
|---|
| 6 | 6 | Sch 'A' Part-V (Misc Items)\nNote:- This schedule is not pre-priced by MES and the pre-priced rate indicated as \"Rs 0.00\" under Col.6 signifies this fact only.\n | 1.06 | | |
|---|
| 7 | 7 | M&L Construction of RCC Septic tank designed to carry sewage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, RCC M-25 Design Mix in Walls , Base Slab , Baffle walls and Roof Slab including beams etc with Vent shaft , manhole openings with cover connection etc., complete with effective depth of 1.5 meter and overall depth of 3 meter for 10 users complete as shown in drg and as directed. \nNote : Rate incl for dewatering during construction | 1.07 | 6 | EACH |
|---|
| 8 | 8 | M&L Construction of Soakage wells excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonry in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 1.8 x 3 m depth complete as shown in Drg and as directed.\nNote : Rate incl for dewatering during construction | 1.08 | 6 | EACH |
|---|
| 9 | 9 | Supply and fixing MCB, single pole, 240 volts, 6 Amps to 32 Amp, AC, 50 Hz with rupturing capacity 10 KA, C series complete all as specified | 1.09 | 36 | EACH |
|---|
| 10 | 10 | Supply and fixing MCB, single pole and neutral 240 volts, 6 Amps to 32 Amp, AC, 50 Hz with rupturing capacity 10 KA, C series complete all as specified | 1.1 | 6 | EACH |
|---|
| 11 | 11 | Supply and fixing LED tube light fitting including LED Tube 20 watt , wall mounted LED batten, extruded aluminium heat sink provided for efficient heat dissipation & integrated electronic driver, 230 volts, fixing on wall including connecting up with twin core twisted flexible copper conductor cable with suitable size, compete all as specified and as directed by Engr-in-Charge. (Make : Crompton Greaves LDDR20-CDL-Dazzle Ray/Philips Astraline 20 watt LED Batten/Wipro Garnet 4 ft 20W LED Batten or its equivalent model in Bajaj)\n | 1.11 | 30 | EACH |
|---|
| 12 | 12 | Supply and fixing new generation energy saving & environmental friendly long life versatile pressure die-cast aluminium IP66 roadway luminaries with high power LED as light source with acrylic cover Street Light Luminaries 25 watt including 40 mm dia medium grade GI pipe 1.5 mtr bend to shape, clamp nut, bolts, washers and other accessories fix to bldg wall with elect connection complete all as specified and as directed. (Make : Crompton Greaves model No LSTO - 25-CDL/Bajaj EDGE Plus model BRLEP 25W LED/WH or equivalent model of Philips/Wipro LRO2-291-XXX-57-XX | 1.12 | 24 | EACH |
|---|
| 13 | 13 | Supply and fixing ceiling fan of 1200 mm sweep 240 V 50 Hz high speed with BEE rated 5 star model and connecting up incl provn of cable from ceiling rose to fan with flexible copper cable of suitable size complete all as specified (Havells Model ES-50) | 1.13 | 12 | EACH |
|---|
| 14 | 14 | Material and labour for Exhaust fan heavy duty 300 mm sweep 1400 RPM turbo force with motor, blade and louvers , 230 V AC 50 Hz incl . Grouting of fully threaded bolts 04 Nos complete with making necessary connection complete all as specified and directed. (Havells model Turbo force) | 1.14 | 6 | EACH |
|---|
| 15 | 15 | Supply and fixing LED Lamp 7watt complete as specified and as directed by Engr-in- Charge. (Make : Havells/Crompton Greaves/Philips/Wipro). | 1.15 | 24 | EACH |
|---|
| 16 | 16 | Material and labour for earthing complete with galvanised steel earth plate electrode of size 60 cm x60cm x 6.0mm thick burried directly in ground (earth pit not less than 2.25 m below ground level) with top edge not less than 1.5 m below ground level, connected to galvanised wire 4.0mm dia as earth lead by means of bolts, nuts, check nuts, washers of galvanised iron or steel all as shown in electrical plate No 3 of SSR part I, connected to earth test point all as specified or indicated complete with excavation, earth work, PCC 1:3:6 pit with RCC cover 50 mm thick with suitable handle made of 10mm dia MS bar, 20mm bore GI tubing medium grade for watering pipe, 15mm bore medium grade GI pipe for protection of 4.0mm dia GI earth lead, test point, GI funnel with wire mesh complete all as directed and specified and testing on completion. | 1.16 | 6 | EACH |
|---|