Corrigendum - Tender For Shifting Of Line Pole And Including Supply Of Some Material-2 Acsr Weasel Conductor. 3 Lt Abc Cable ( 3X120+1X95+1X16 ) Mm2 4 Stone Pad 5 Stay Clamp For St Pole 11Mtr. With Nut And Bolt By 50X6 Mm Ms Flat Iron Make. 6 Stay Clamp For Pcc Pole 8.50 Mtr. With Nut And Bolt By 50X6 Mm Ms Flat Iron Make. 7 Stay Insulator 8 Loop Guard Complete 3 Phase 9 Top Channel For Section Pole With Clamp And Nut Bolt 10 P.G. Clamp For Dog Conductor 11 F Bracket For 33 Kv 12 E Bracket For 33 Kv 13 Danger Board With Clamp And Nut Bolt 14 Barbed Wire 15 Bolts, Nuts, & Washers As Per Required 16 Clamp For M.S. Channel ( T- Off ) 17 F / E-Bracket With Nut Bolt For Pcc Pole 8.5 Mtr With Nut Bolt By 50X6 Mm Ms Flat Iron Make 18 Gaurding Cross Arm ( M.S Angle 65 ) 19 F Bracket For Feeting Top Insulator 20 Cross Arm Holding Clamp With Nut Bolt For Pcc 21 Cross Arm Holding Clamp With Nut Bolt For Stp 22 Lt Clamp With Nut Bolt 23 Lt Schacle Insulator With Nut Bolt 24 Earth Wire Clamp With Nut Bolt For Pcc Pole 25 Alluminium Binding Wire 6Swg 26 Allumunium Paint 27 Red Oxide Paint 28 Holding Clamp For Top Channel With Nut Bolt 29 Eye Bolt For Guard Wire 30 Clamp For T / F 31 Part-B- Work L.T. And Domestic Consumer Connection Cable. 32 Commercial And Power Consumer Connection Cable. 33 Construction Of 400 Kva Transformer Plinth Suitable Size For Shifting Of Existing Plinnth Mounted Distribution Transformer As Per Required Size. 34 Construction Of 250 Kva Transformer Plinth Suitable Size For Shifting Of Existing Plinnth Mounted Distribution Transformer As Per Required Size. 35 Fabrication And Erection Of Fencing Of T / F 36 Installation Of 400 Kva T / F On New Plinth With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fencing Of Transformer, Lt Cubicle With Piller Fuse Unit. Fuse Set, Stay Complete, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 37 Installation Of 250 Kva T / F On New Plinth With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fencing Of Transformer, Lt Cubicle With Piller Fuse Unit. Fuse Set, Stay Complete, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 38 Installation Of 100 Kva T / F On Double Pole With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fencing Of Transformer, Lt Cubicle With Piller Fuse Unit. Fuse Set, Stay Complete, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 39 Installation Of 63 Kva T / F On New Double Pole With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fuse Set, Stay Complete, Pipe Earthing Complete, Painting Of Pole, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 40 Installation Of 25 Kva T / F On New Double Pole With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fuse Set, Stay Complete, Pipe Earthing Complete, Painting Of Pole, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 41 Installation Of 16 Kva T / F On New Double Pole With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fuse Set, Stay Complete, Pipe Earthing Complete, Painting Of Pole, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 42 Installation Of 10 Kva T / F On New Single Pole With Fittings As Per Required Specification With Erection Of Double Pole With All Fittings By Lifting By Crane And Completed All Related Works ( Fuse Set, Stay Complete, Pipe Earthing Complete, Painting Of Pole, Pipe Earthing Complete For Body And Neutral, Painting Of Pole, 11 Kv Tpmo Switch Of Installation Of T / F As Per Schedule. 43 Erection Of Single Pole Structure For 11 Kv Overhead Line On 8.5Mtr.Pcc Pole Including All Works Of Evocation Of Pit, Pole Erection, Grouting In The Ratio 1:4:8 ( Cement, Sand, 40 Mm Brick Ballast ) , Back Filling Of Earth , Proper Ramming & Fitting Of All Accessories For Single Circuit ( M.S. Angle Iron Bracing With Clamps, Top Channel With Clamps, Disc Isulator B & S Type, Disc Fitting B & S Type, Composite Polymar Pin, Insulator, P.G. Clamp, E Bracket, Danger Board With Clamp, Barbed Wire Earthing, Etc. Complete ) . The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 44 Erection Of Single Pole Structure For 11 Kv Overhead Line On 11.0 Mtr. ( Sp-55 ) Pole Including All Works Of Excavation Of Pit, Pole Erection, Grouting In The Ratio 1 : 4 : 8 ( Cement, Sand, 40Mm Brick Ballast ) Back Filling Of Earth, Proper Ramming & Fitting Of All Accessories ( V Type Cross Arm Clamps With Bolt And Nut, F Bracket, Composite Polymar Pin, Insulator, Danger Board With Clamp, Barbed Wire Earthing, Etc. Complete ) The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 45 Erection Of Single Pole Structure For 33 Kv Overhead On 9.0 Mtr. ( Sp-55 ) Pole Including All Works Of Exvcation Of Pit, Pole Erection, Grouting In The Ratio 1:4:8 ( Cement, Sand, 40Mm Brick Ballast ) , Back Filling Of Earth, Proper Ramming & Fitting Of All Accessories ( V Type Cross Arm, M.S. Channel Clamps With Bolt And Nut, F Bracket, Composite Polymar Pin, Insulator, Danger Board With Clamp, Alluminium Paint, Red Oxide Paint, Barbed Wire Earthing, Etc. Complete ) The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 46 Erection Of Single Pole Structure For 33 Kv Overhead On 11.0 Mtr. ( Sp-55 ) Pole Including All Works Of Exvcation Of Pit, Pole Erection, Grouting In The Ratio 1:4:8 ( Cement, Sand, 40Mm Brick Ballast ) , Back Filling Of Earth , Proper Ramming & Fitting Of All Accessories ( V Type Cross Arm , M.S. Channel Clamps With Bolt And Nut, F Bracket, Composite Polymar Pin, Insulator, Danger Board With Clamp, Alluminium Paint, Red Oxide Paint, Barbed Wire Earthing, Etc. Complete ) The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 47 Erection Of Single Pole Structure For 33 Kv Overhead On 13.0 Mtr. ( Sp-55 ) Pole Including All Works Of Exvcation Of Pit, Pole Erection, Grouting In The Ratio 1:4:8 ( Cement, Sand, 40Mm Brick Ballast ) , Back Filling Of Earth , Proper Ramming & Fitting Of All Accessories ( V Type Cross Arm , M.S. Channel Clamps With Bolt And Nut, F Bracket, Composite Polymar Pin, Insulator, Danger Board With Clamp, Alluminium Paint, Red Oxide Paint, Barbed Wire Earthing, Etc. Complete ) The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 48 Erection Of Single Pole Structure For Lt Overhead Line On 8.50 Mtr.Pcc Pole For Composite Line With All Fittings As Per Schedule Including All Works Of Excavation Of Pit, Pole Erection, Grouting In The Ratio 1:4:8 ( Cement, Sand, 40 Mm Brick Ballast ) , Back Filling Of Earth , Proper Ramming & Fitting Of All Accessories ( Lt Clamps With Bolt And Nut, Schakle Insulator, Danger Board Withclamp, Barbed Wire Earthing, Disconnection-Re-Connection Of Sevice Cable In D / B Box, Painting Of Pole, 1X35 Mm2 Xlpe Insulated All, Cable In Db Box Etc. Complete ) The Work Includes Carriage & Handling Of All Materials From Site Store To Pit Site. 49 Making Of Sectional T-Off Pole With All Fitting Complete Work. 50 Laying, Speading, Lifting And Final Sagging Of Ht / Lt Line On Acsr Weasal Conductor In Accordance With Profile And Sag Chart Including Binding, Jumprering And Fixing Of All Clamp As Per Requirement . 51 Laying, Speading, Lifting And Final Sagging Of Ht / Lt Line On Acsr Dog Conductor In Accordance With Profile And Sag Chart Including Binding, Jumprering And Fixing Of All Clamp As Per Requirement . 52 Making H.T. Connections Of The Proposed Line, On To The Existing 33 Kv / 11 Kv / Lt Line From Where Line Is Eminating And Another At The End Of Line To The Existing 33 Kv / 11 Kv / Lt Line. 53 Chopping Of Branches Of Trees Of Eucalyptus, Neem, Keekar And Other Kind Of Trees Along The Route Of The Line And Disposal Of The Same At Suitable Place ( 1 Job = 110 Branches / Bomboos ) 54 Grouting Of Stay Rods ( 16 X 1800 ) Mm Including All Work Of Excavation, Cement Concrete In Size ( 0.60 X 0.60 X 0.30 ) M In Ratio 1:4:8 Cement, Sand, 40Mm Brick Ballast ) As Per Drg Including Back Filling, Proper Ramming Etc. Fixing Tightening & Nozzling Of Stay Wire With Stay Rod With The Poles Of Required Tension As Per Drawing, The Work Includes Supply, Carriage & Handling Of Stay From Site Store To Pit Site. 55 Guarding Between Two Poles Like Single Poles, Double Poles, Four Poles, Etc. To Guard Lt, 11 Kv Line Telephone And River Crossing, Road Crossing Etc. With G.I. Wire No. 6 Swg And G.I. Wire No. 8 Swg, Including Supply, Cutting, Fabrication And Fixing Of Guarding Channel 75X40x3010 Mm With Clamps Nut & Bolts Etx, As Per Drawing. 56 Guarding Between Two Poles Like Single Poles, Double Poles, Four Poles, Etc. To Guard 33 Kv Line Telephone And River Crossing, Road Crossing Etc. With G.I. Wire No. 6 Swg And G.I. Wire No. 8 Swg, Including Supply, Cutting, Fabrication And Fixing Of Guarding Channel 75X40x3010 Mm With Clamps Nut & Bolts Etx, As Per Drawing. 57 Overhead Abc Cable 3X120+1X95+1X16 Mm2 With All Required Complete Work With Complete Fitting. 58 Dismentling Of Existing 400 Kva T / F With Safely. 59 Dismentling Of Existing 250 Kva T / F With Safely. 60 Dismentling Of Existing 100 Kva T / F With Safely. 61 Dismentling Of Existing 63 Kva T / F With Safely. 62 Dismentling Of Existing 25 Kva T / F With Safely. 63 Dismentling Of Existing 16 Kva T / F With Safely. 64 Dismentling Of Existing 10 Kva T / F With Safely. 65 Dismenting Charges Of Existing Lt Abc Cable. 66 Dismenting Charges Of Existing Pcc Pole Of Ht / Lt Line. 67 Dismentling Charges Of Existing Double Pole And S / S. 68 Dismentaling Of Old Acsr Weasel Conductor And Rolling In Pieces. 69 Dismentaling Of Old Acsr Rabbit Conductor And Rolling In Pieces. 70 Shifting, Loading Carriage & Unloading Of Old And Damaged 11 Kv Line Materials From Je Dump Store To Store Centre Deoria Distt. Deoria. 71 Best Possible Dismenling Of Old Pcc Pole And Loading Unloading Carriage At Pit Side To Store Center Deoria Safly. 72 Shifting, Loading Carriage & Unloading Of Old And Damaged Line Materials From Je Dump Store To Store Centre Deoria 73 Installtion Of Danger Board With All Respect And Barbed Wire.