Tender For Handling Dummies , Slip Plates , Valves , Flanged Hoses Etc . Of Various Vessels / Equipments / Pipelines In Pa And Pc Plants , Fact Cd ., AMBALAMEDU-Kerala

Fertilisers And Chemicals Travancore Limited has published Tender For Handling Dummies , Slip Plates , Valves , Flanged Hoses Etc . Of Various Vessels / Equipments / Pipelines In Pa And Pc Plants , Fact Cd .. Submission Date for this Tender is 16-12-2019. Miscellaneous Fasteners Tenders in AMBALAMEDU Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

22724782
Tender For Handling Dummies , Slip Plates , Valves , Flanged Hoses Etc . Of Various Vessels / Equipments / Pipelines In Pa And Pc Plants , Fact Cd .
Open Tender
Indian
Kerala
AMBALAMEDU
16-12-2019

Tender Details

Tender For Handling Dummies , Slip Plates , Valves , Flanged Hoses Etc . Of Various Vessels / Equipments / Pipelines In Pa And Pc Plants , Fact Cd . , Tender For Handling Dummies , Slip Plates , Valves , Flanged Hoses Etc . Of Various Vessels / Equipments / Pipelines In Pa And Pc Plants , Fact Cd . , Handling Dummies From Size 50 Nb To 300 Nb: Arranging Tools For The Work . Dismantling , Removing Of Drain Dummies , End Dummies Inspection Covers , Manhole Covers , Drain Valves , Flange Joints , Slip Plates Etc . Of Various Equipments / Pipelines In Pa And Pc Plants For Cleaning / Repair / Inspection , Fixing Back The Same With New Gasket And Servicing Without Leak For Size Varying From 50 Nb To 300 Nb . , Handling Dummies From Size 350 Nb To 1000 Nb: Arranging Tools For The Work . Dismantling , Removing Of Drain Dummies , End Dummies , Inspection Covers , Manhole Covers , Drain Valves , Flange Joints , Slip Plates Etc . Various Equipments / Pipelines In Pa And Pc Plants For Cleaning / Repair / Inspection , Fixing Back The Same With New Gasket And Servicing Without Leak For Size Varying From 350 Nb To 1000 Nb . , Repair Of Flanges: Arrange The Necessary Tools And Consumable Required For The Work . Dismanling The Mating Flange / Pipeline For Repairing The Damaged Flange . Repair Of Flange Face At Site By Welding And Grinding As Instructed By Enginner-In-Charge . Fix Back The Mating Flange / Pipieline With New Gasket And Servicing Without Leak . , Dismantling , Servicing And Refixing Of Valves: Arrange Necessary Tools And Tackles For The Work . Dismounting Valves From Position , Dismantling , Cleaning , Assembling And Fixing Back In Position With New Gasket And Servicing Without Leak , In Case Valve Is Found Damaged As Inspected And Confirmed By Engineer-In-Charge , Collect And Transport Spare Valve From Workshop / Store As Instructed By Enginner In Charge , And Fix It In Position With New Gasket And Servicing Without Leak And Transport The Damaged Valve To Work Shed For Servicing / Scrapyard . Size Ranging From 100 Nb To 300 Nb . , Replacement Of Flanged Hose: Arrange Necessary Tools And Tackles For The Work . Dismantle Damaged Hose And Replace With New Hose And Service Without Leak As Intructed By Enginner-In-Charge , Transport The Damaged Hose To Earmarked Area For Scrap / Scrapyard . , Replacement Of Clariflocculator Wheel: The Required Site Arrangement To Replace Clariflocculator Wheel Shall Be Done . Tools And Tackles Shall Be Arranged . Lifting The Running Frame Of Clarifloculator In Pollution Control Plant By Hydraulic Jack , Supporting It And Remove The Wheel With Shaft , Removing Sporcket / Bearing Etc . , Replace The Damaged Bearing , Damaged Wheel Etc , Assembling And Ercting At Site And Take Trial Run Of Clarifloculator , Site Cleaning And Transporting The Damaged Parts To Workshed / Area Earmarked For Scrap / Scrapyard As Instructed By Shift-In-Charge . , Replacement Of Drive Chains In Pollution Control: Repairing / Replacement Of Drive Chain Of Clariflocculators , Elevators Etc . Arrange The Required Tools And Tackles For The Work . Collect The Spare Chain From Store / Workshed . Dismantle The Damaged Chain From The Sporket . Assemble And Erect The Spare Chain After Inspection Of Sporcket . Lubricate The Chain . Site Cleaning And Shift The Damaged Chain To Workshed / Area Earmarked For Scrap / Scrapyard . , Replacement Of Drive Sporckets In Pollution Control: Replacement Of Sporckets Of Clariflocculators / Elevators Etc . Arrange The Required Tools And Tackles For The Work . Collect The Spare Sporcket From Store / Workshed . Dismantle The Drive Chain . Dismantle / Pull Out The Damaged Sporket From The Shaft . Assemble The Spare Sporcket On The Shaft . Assemble The Drive Chain . Lubricate The Sporcket And Chain . Site Cleaning And Shift The Damaged Sporcket To Workshed / Area Earmarked For Scrap / Scrapyard . , Easing Of Stuck Up Valves: Easing Of Stuck Up Valves At Site As Instructed By Engineer In Charge . , Reclamation Of Usable Flanges : Reclamation Of Old And Usable Flanges From Scrap Pipes By Cutting And Grinding , Transporting To Workshop For Machining And Collecting Back . , Fabrication And Erection Of Chain Guard And Coupling Guard: Collecte The Materials And Consumables For The Work . Arrange Necessary Tools And Tackles . Take Measurement From The Site . Fabricate Chain Guard And Coupling Guards To Suit The Site Condition . Proper Welding And Grinding Shall Be Done . Erect The Chain Guard / Coupling Guard At Site . Necessary Modification / Providing Structural Support At Site During Erection Shall Be Done . Clean The Site And Transport The Scarp Material To Scrapyard . , Replacement Of Gearbox / Motors In Pollution Control : The Required Site Arrangements Shall Be Done For The Replacement Of Gearbox / Motor At Pollution Control Area . Arrangement Of Necessary Tools And Tackles For The Work Shall Be Done . Coupling Guard / Chain Guards Shall Be Removed . The Gearbox / Motor Shall Be Decoupled . Foundation Bolts Of The Existing Gearbox / Motor Shall Be Loosened / Removed And Lead / Transport The Damaged Gearbox / Motor To Mechanical / Electrical Work Shop . Collect The New / Spare Gearbox / Motor From Mechanical / Electrical Workshop And Shall Be Transported To Site . The Gearbox / Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Check And Correct The Alignment Of The Gearbox / Motor At The Drive Side And Driven Side ( For Gearbox ) . Jackbolts , Foundation Bolts , Base Plates Etc . Shall Be Adjusted / Modified According To Site Condition . Jack Bolts / Foundation Bolts If Damaged Shall Be Replaced . Full Tighten The Foundation Bolts . Couple The Gearbox / Motor After Inspection Of Alignment By Engineer In Charge . Provide Chain Guards / Coupling Guards . Site Cleaning Shall Be Done . Cleaning Of Damaged Gearbox Transported To Mechanical Workshop Shall Be Done .

Key Value

Document Fees
Refer document
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Handling Dummies, Slip Plates, Valves, Flanged Hoses etc. of various vessels / equipments / pipelines in PA and PC Plants, FACT CD.
Sl. No. Item Description Service Code Quantity Units
1 1 Handling Dummies, Slip Plates, Valves, Flanged Hoses etc. of various vessels / equipments / pipelines in PA and PC Plants, FACT CD.
2 1.01 Handling Dummies from Size 50 NB to 300 NB:\nArranging tools for the work.Dismantling, removing of drain dummies, end dummies inspection covers, manhole covers, drain valves, flange joints, slip plates etc. of various equipments/pipelines in PA and PC plants for cleaning / repair /inspection, fixing back the same with new gasket and servicing without leak for size varying from 50 NB to 300 NB. CD-P-HANDLEDUMMY01 150 NO
3 1.02 Handling Dummies from Size 350 NB to 1000 NB:\nArranging tools for the work.Dismantling, removing of drain dummies, end dummies,inspection covers, manhole covers, drain valves, flange joints, slip plates etc. various equipments/pipelines in PA and PC plants for cleaning / repair /inspection, fixing back the same with new gasket and servicing without leak for size varying from 350 NB to 1000 NB. CD-P-HANDLEDUMMY02 150 NO
4 1.03 Repair Of Flanges:\nArrange the necessary tools and consumable required for the work. Dismanling the mating flange/pipeline for repairing the damaged flange. Repair of flange face at site by welding and grinding as instructed by enginner-in-charge. Fix back the mating flange/pipieline with new gasket and servicing without leak. CD-P-HANDLEDUMMY03 30 NO
5 1.04 Dismantling, Servicing and Refixing of Valves:\nArrange necessary tools and tackles for the work.Dismounting valves from position,dismantling,cleaning,assembling and fixing back in position with new gasket and servicing without leak, in case valve is found damaged as inspected and confirmed by engineer-in-charge, collect and transport spare valve from workshop/store as instructed by enginner in charge,and fix it in position with new gasket and servicing without leak and transport the damaged valve to work shed for servicing/scrapyard. Size ranging from 100 NB to 300 NB. CD-P-HANDLEDUMMY04 50 NO
6 1.05 Replacement Of Flanged Hose:\nArrange necessary tools and tackles for the work. Dismantle damaged hose and replace with new hose and service without leak as intructed by Enginner-In-Charge, transport the damaged hose to earmarked area for scrap/scrapyard. CD-P-HANDLEDUMMY05 500 INM
7 1.06 Replacement of Clariflocculator Wheel:\nThe required site arrangement to replace clariflocculator wheel shall be done. Tools and tackles shall be arranged. Lifting the running frame of clarifloculator in pollution control plant by hydraulic jack, supporting it and remove the wheel with shaft,removing sporcket/bearing etc.,replace the damaged bearing,damaged wheel etc, assembling and ercting at site and take trial run of clarifloculator,site cleaning and transporting the damaged parts to workshed/area earmarked for scrap/scrapyard as instructed by shift-in-charge. CD-P-HANDLEDUMMY06 8 NO
8 1.07 Replacement of Drive Chains in Pollution Control:\nRepairing/replacement of drive chain of clariflocculators,elevators etc.\nArrange the required tools and tackles for the work. Collect the spare chain from store/workshed. Dismantle the damaged chain from the sporket. Assemble and erect the spare chain after inspection of sporcket.Lubricate the chain. Site cleaning and shift the damaged chain to workshed/area earmarked for scrap/scrapyard. CD-P-HANDLEDUMMY07 12 NO
9 1.08 Replacement of Drive Sporckets in Pollution Control:\nReplacement of sporckets of clariflocculators/elevators etc.\nArrange the required tools and tackles for the work. Collect the spare sporcket from store/workshed. Dismantle the drive chain. Dismantle/pull out the damaged sporket from the shaft. Assemble the spare sporcket on the shaft. Assemble the drive chain. Lubricate the sporcket and chain.Site cleaning and shift the damaged sporcket to workshed/area earmarked for scrap/scrapyard. CD-P-HANDLEDUMMY08 10 NO
10 1.09 Easing of Stuck Up Valves:\nEasing of stuck up valves at site as instructed by engineer in charge. CD-P-HANDLEDUMMY10 75 NO
11 1.1 Reclamation of usable flanges :\nReclamation of old and usable flanges from scrap pipes by cutting and grinding,transporting to workshop for machining and collecting back. CD-P-HANDLEDUMMY11 200 NO
12 1.11 Fabrication and Erection of Chain Guard and Coupling Guard:\nCollecte the materials and consumables for the work. Arrange necessary tools and tackles. Take measurement from the site. Fabricate chain guard and coupling guards to suit the site condition. Proper welding and grinding shall be done.Erect the chain guard/coupling guard at site. Necessary modification/providing structural support at site during erection shall be done. Clean the site and transport the scarp material to scrapyard. CD-P-HANDLEDUMMY12 10 NO
13 1.12 Replacement of Gearbox/Motors in Pollution Control :\nThe required site arrangements shall be done for the replacement of gearbox/motor at pollution control area.Arrangement of necessary tools and tackles for the work shall be done. Coupling guard/chain guards shall be removed.The gearbox/motor shall be decoupled.Foundation bolts of the existing gearbox/motor shall be loosened / removed and lead / transport the damaged gearbox/motor to mechanical/electrical work shop. Collect the new / spare gearbox/motor from mechanical/electrical workshop and shall be transported to site. The gearbox/motor shall be kept in position and insert the foundation bolts, after cleaning the base plate.Check and correct the alignment of the gearbox/motor at the drive side and driven side (for gearbox) .Jackbolts,foundation bolts,base plates etc. shall be adjusted/modified according to site condition. Jack bolts/foundation bolts if damaged shall be replaced. Full tighten the foundation bolts. Couple the gearbox/motor after inspection of alignment by engineer in charge. Provide chain guards/coupling guards. Site cleaning shall be done. Cleaning of damaged gearbox transported to mechanical workshop shall be done. CD-P-HANDLEDUMMY13 15 NO
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail