| 1 | 1 | Cutting groove of the pavement concrete slab | | 250 | Mtr |
|---|
| 2 | 2 | Dismantling metal sheet in roofing /ridge etc | | 3250 | sqm |
|---|
| 3 | 3 | Demolishing cement concrete | | 70 | Cum |
|---|
| 4 | 4 | Demolishing brick work | | 35 | Cum |
|---|
| 5 | 5 | Earthwork in over areas | | 300 | Cum |
|---|
| 6 | 6 | S/F in plinth with M-sand | | 145 | Cum |
|---|
| 7 | 7 | Carraiage of materials | | | |
|---|
| 8 | 7.1 | Carriage of earth upto 8.0 km | | 300 | Cum |
|---|
| 9 | 7.2 | Carriage of rubbish upto 8.0 km | | 150 | Cum |
|---|
| 10 | 8 | P/F ready mixed plain cement concrete | | | |
|---|
| 11 | 8.1 | M-10 Grade plain cement concrete | | 100 | Cum |
|---|
| 12 | 8.2 | M-15 Grade plain cement concrete | | 240 | Cum |
|---|
| 13 | 9 | Providing and laying R.C.C & M25 grade | | 150 | Cum |
|---|
| 14 | 10 | Centering for Foundation, bases of columns | | 270 | Sqm |
|---|
| 15 | 11 | Reinforcement with TMT bars | | 18872 | Kg |
|---|
| 16 | 12 | Brick work in foundation and plinth in CM 1:6 | | 65 | Cum |
|---|
| 17 | 13 | 12 mm Cement plaster in CM 1:4 | | 180 | Sqm |
|---|
| 18 | 14 | 15 mm Cement plaster in CM 1:4 | | 180 | Sqm |
|---|
| 19 | 15 | Applying Cement primer | | 360 | Sqm |
|---|
| 20 | 16 | Water proof cement painting on new work | | 360 | Sqm |
|---|
| 21 | 17 | Steel work in columns rafters made out of 345MPA steel plates | | 72000 | Kg |
|---|
| 22 | 18 | Steel work Z,C made out of 345 MPA steel sheets | | 21350 | Kg |
|---|
| 23 | 19 | Steel work in built up made out of 240 MPA hot rolled section | | 37200 | Kg |
|---|
| 24 | 20 | Steel work in tubular trusses with seamless type tubes | | 18000 | Kg |
|---|
| 25 | 21 | P/F hard drawn steel wire fabric 75x25mm in frame of steel work | | 770 | Sqm |
|---|
| 26 | 22 | P/F 0.71mm thick approved color coated roofing sheet | | 5900 | Sqm |
|---|
| 27 | 23 | P/F 0.71mm thick in ridges | | 180 | Mtr. |
|---|
| 28 | 24 | P/F 0.91mm thick valley | | 400 | Mtr. |
|---|
| 29 | 25 | P/F 2mm thick polycarbonate roofing sheet | | 360 | Sqm |
|---|
| 30 | 26 | P/F top roof ventilator | | 96 | Each |
|---|
| 31 | 27 | P/F 110mm PVC rain water pipe | | 220 | Mtr. |
|---|
| 32 | 28 | P/F holding down bolts | | 450 | Kg |
|---|
| 33 | 29 | P/F cera grout filler | | 0.2 | Cum |
|---|
| 34 | 30 | P/F 0.71mm thick aluminum sheet in corner flashing | | 450 | Mtr |
|---|
| 35 | 31 | P/F MS rain water pipe 300mm dia | | 285 | Mtr |
|---|
| 36 | 32 | P/L 25mm thick bitumen mastic wearing course | | 4600 | Sqm |
|---|
| 37 | 33 | Dismantling mastic flooring | | 1200 | sqm |
|---|
| 38 | 34 | P/F 40x6mm wind ties | | 480 | Mtr |
|---|
| 39 | 35 | P/F 3mm thick composite panel | | 85 | Sqm |
|---|
| 40 | 36 | Filling the gap in between aluminum frame | | 120 | Mtr |
|---|
| 41 | 37 | Finishing with Epoxy paint | | 720 | sqm |
|---|