| 1 | 1 | Earth work excavation for foundation in hard gavel soil, shift black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete. | Item Code / 1 | 71 | M3 |
|---|
| 2 | 2 | Earth work Excavation and depositing on bank with initial lead of 10 metre and lift of 2 metre in soft disintegrated rock, laterite soft rock or kankar not requiring blasting including all leads, lifts etc., as per standard specification complete. | Item Code / 2 | 71 | M3 |
|---|
| 3 | 3 | Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts etc., as per standard specification complete | Item Code / 3 | 47 | M3 |
|---|
| 4 | 4 | Earth work Excavation for tower foundation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete. | Item Code / 4 | 47 | M3 |
|---|
| 5 | 5 | PCC 1:3:6 using 20mm metal for foundation with out formwork including cost of all materials lead lift curing etc complete. | Item Code / 5 | 5 | M3 |
|---|
| 6 | 6 | PCC 1:2:4 using 20mm metal (machine crushed) with frustum form work for footing concrete including cost of all materials lead lift curing etc complete including cost of footing box etc. | Item Code / 6 | 38 | M3 |
|---|
| 7 | 7 | PCC 1:2:4 using 20mm metal (machine crushed) for chimney including cost of all materials lead lift curing etc complete including cost of Chimney box , footing box etc. | Item Code / 7 | 3 | M3 |
|---|
| 8 | 8 | Supplying & Transporting of stubs, cleat for KCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead lift complete. KCR tower | Item Code / 8 | 1 | Loc |
|---|
| 9 | 9 | Supplying & Transporting of stubs, cleat for HCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead lift complete. | Item Code / 9 | 1 | Loc |
|---|
| 10 | 10 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | Item Code / 10 | 189 | m3 |
|---|
| 11 | 11 | Transporting of excess earth excavated and disposing them with in a lorry lead of 1 KM including lead, lift labour etc complete. | Item Code / 11 | 46 | m3 |
|---|
| 12 | 12 | Providing pipe type earthing including necessary excavation for fixing 3m long 40mm dia GI \"B\" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete. | Item Code / 12 | 3 | Loc |
|---|
| 13 | 13 | Plastering the Chimney portion upto 0.45 m with CM 1:3, 12mm thick including all cost of shuttering charges lead lift curing labour materials etc complete | Item Code / 13 | 9 | m2 |
|---|
| 14 | 14 | Supplying and Erection of towers, tightening and punching of bolts & nuts, final checking including all lead lift etc., complete. including charges for rectification of tower parts if any including Tools & Plants all labour, lead, lift, etc., complete.(Under LC Condition) | Item Code / 14 | 11.16 | mt |
|---|
| 15 | 15 | Tack welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour transport charges etc complete. (Under LC condition) | Item Code / 15 | 1466 | Nos |
|---|
| 16 | 16 | Transport and hoisting of 120 KN antifoc/Ord single tension insulators of 8 units including all cost of labour lead lift T & P etc complete. (Under LC Condition) | Item Code / 16 | 48 | Set |
|---|
| 17 | 17 | Transport and hoisting of 90 KN antifoc/Ord suspension insulators of 7 units including all cost of labour lead lift T & P etc complete.(Under LC Condition) | Item Code / 17 | 18 | Set |
|---|
| 18 | 18 | Transport of 6 Nos. of Panther conductor, paving out, jointing, rough sagging, tensioning, clipping, providing vibration dambers for tension locations including giving jumber connection for power conductor including transport charges, loading unloading lead lift etc complete. (Under LC condition) | Item Code / 18 | 4 | Span |
|---|
| 19 | 19 | Transport of 1 No. earthwire of 7/3.55mm, paying out, jointing, rough sagging, tensioning, including giving jumber connection including transport charges, loading unloading lead lift etc complete. (Under LC condition) | Item Code / 19 | 4 | Span |
|---|
| 20 | 20 | Providing temporary guys at the time of releasing and lowering and stringing of power conductor and earth wire etc., rough sagging and single tensioning with necessary excavation of pits fixing rails etc., and dismantling stay after completion of work including major & minor T&P's steel ropes with all labour lead lift as per standard specification etc., complete. (Under LC condition) | Item Code / 20 | 3 | Loc |
|---|
| 21 | 21 | Painting with anticorrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including all cost of materials lead lift etc complete. | Item Code / 21 | 4 | Nos |
|---|
| 22 | 22 | Providing trussles for Road crossing including cost of all labour, lead lift etc complete (Under LC condition) | Item Code / 22 | 3 | Nos |
|---|
| 23 | 23 | Arranging and availing of line clear of HT/LT line during dismantling line and stringingof new conductor including cost of all labour, lead lift etc complete (Under LC condition) | Item Code / 23 | 10 | Nos |
|---|
| 24 | 24 | Supplying and fixing of line name board of size 750 x 450 mm in 18 gauge M.S sheet with 25 x 25 x 3 mm angle frame and painting with two coats of enamel paint over one coat of redoxide including cost of all materials lead lift labour etc complete | Item Code / 24 | 6 | Nos |
|---|
| 25 | 25 | Labour charges for fixing number plates including all cost of lead lift labour etc complete. | Item Code / 25 | 4 | Nos |
|---|
| 26 | 26 | Labour charges for fixing phase plates including all cost of lead lift labour etc complete. | Item Code / 26 | 4 | Set |
|---|
| 27 | 27 | Labour charges for fixing danger board including all cost of lead lift labour etc complete. | Item Code / 27 | 4 | Nos |
|---|
| 28 | 28 | Cutting of old stub of dismantled towers upto a depth of 1 m from stub top including breaking the PCC concrete necessary excavation and refilling after cutting the stub and removal of dismantled concrete away from site including lead lift hire charges for gas cylinder , cutter labour T & Ps etc complete | Item Code / 28 | 2 | Loc |
|---|
| 29 | 29 | Uprooting of large trees and clearing away from site. | Item Code / 29 | 30 | Nos |
|---|
| 30 | 30 | Uprooting of small trees and clearing away from site. | Item Code / 30 | 50 | Nos |
|---|
| 31 | 31 | Dismantling the existing PA, PB and CZ type tower towers and 3 Nos. leopard conductor along with the fittings AS IS WEHEREIS CONDICTION and clearing from the site at your own cost including cost of dismantling charges, loading , unloading, transporting charges with necessary Tools and plants with safety norms. (The Amount to be remitted in the TANTRANSCO account before commencement of the work the amount will be released after completion of work as Schedule - A). GI Tower Angle Scrab - 4.67 MT | Item Code / 31 | 1 | Lot |
|---|
| 32 | 32 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | Item Code / 32 | 1 | Percentage |
|---|
| 33 | 33 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | Item Code / 33 | 1 | Percentage |
|---|
| 34 | 34 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \"0\" only | Item Code / 34 | 1 | Percentage |
|---|