Selection Of Implementing Agency For Provisioning Of Last Mile Access And Broadband Services Through Public Wi-Fi Access Point At The Gram Panchayat Level And Extending Up To Various Government Institutions , Underground 12 Core Optical Fibre Cableconnectivity From The Pop/Gp . For Underground Laying12f U/G Ofc Cable Specification . Gr No . Tec/Gr/Tx/Ofc-23/01 Xxx 2011/Qf-103 With Latest Amendments , Or Tsec Issued For Bharatnet Project Is Accepted For The Same , Or Tsec Issued Against Any Bsnl Tender/Bbnl Tender/State Tender In India For U/G 12F . Qf-103 May Also Be Permitted At The Time Of Bidding But Successful Bidder ( L1 ) Has To Submit Tsec Before The Supply Of Materials , If Fails To Do So , Then The Pbg ( Performance Bank Guarantee ) Of L1 ( Successful Bidder ) Will Be Forfeited And Further Action May Be Carried Out By Jcnl . , Supply Of Plb Pipe Hpde Duct ( 40/33 ) Along With Required Accessories As Per Tec Gr Tec/Gr/Tx/Cds-008/03/Mar-2011 With Latest Amendments If Any , Also Tsec Issued For Bharatnet Project Is Accepted For The Same , Adss Optical Fibre Cable ( Type-Iii A ) 4 Core , For Aerial Ofc Specifications . Gr No . Tec-Gr-Tx-Ofc-022-02-Mar-17/ Qf-103 With Latest Amendments , Or Tsec Issued For Bharatnet Project Is Accepted For The Same , Or Latest Tec/Gr For The Same , Or Tsec Issued Against Any Bsnl Tender/Bbnl Tender/State Tender In India For Adss 4F . Qf-103 May Also Be Permitted At The Time Of Bidding But Successful Bidder ( L1 ) Has To Submit Tsec Before The Supply Of Materials , If Fails To Do So , Then The Pbg ( Performance Bank Guarantee ) Of L1 ( Successful Bidder ) Will Be Forfeited And Further Action May Be Carried Out By Jcnl , Adss Optical Fibre Cable ( Type-Iii A ) 12 Core , For Aerial Ofc Specifications . Gr No . Tec-Gr-Tx-Ofc-022-02-Mar-17/ Qf-103 With Latest Amendments , Or Tsec Issued For Bharatnet Project Is Accepted For The Same , Or Latest Tec/Gr For The Same , Or Tsec Issued Against Any Bsnl Tender/Bbnl Tender/State Tender In India For Adss 12F . Qf-103 May Also Be Permitted At The Time Of Bidding But Successful Bidder ( L1 ) Has To Submit Tsec Before The Supply Of Materials , If Fails To Do So , Then The Pbg ( Performance Bank Guarantee ) Of L1 ( Successful Bidder ) Will Be Forfeited And Further Action May Be Carried Out By Jcnl . , Excavation Of Trench For Plb Pipe Laying , Backfilling , Reinstatement And Compaction After Laying Of Plb Pipe , Laying / Blowing Of Optical Fibre Cable Inside Laid Plb Pipe , Splicing And Jointing Of Optical Fibre Cable Including Supply Of As Built Diagram ( Abd ) Of Constructed Ofc Route And Acceptance Testing , Commissioning And Makeover Of The Routes . The Work Also Includes Road /Bridge Crossing , Laying Of Plb Inside Dwc Pipe , Wherever Required And Obtaining Right-Of-Way ( Row ) Permissions . Commissioning Of 12 Core Optical Fibre Connectivity From The Block Pop To Gp Room And Termination At Gp Ont . The Cost Shall Include Fixing Of Joint Chamber , Manhole , Splice Closure , Fixing , Painting And Sign Writing Of Route /Joint Indicators , Termination At Ftb And All The Relevant Accessories Etc . And End To End Testing Of Dark And Lit Fibre Per Gp ( For Underground Laying ) . ( As Per Engineering Instruction Issued By Jcnl ) . , Commissioning Of 4 Core Optical Fibre Connectivity From The Block Pop/Gp Room To The Cpe Point In The Govt . Office . The Cost Shall Include T Laying , Fittings , Splicing , Splitting , Splice Closure , Pole Clamping Installation , Termination At Fdms/Ftb & All The Relevant Accessories Etc . And End To End Testing Of Dark And Lit Fibre Per Cpe Point In The Govt . Office . ( For Aerial Laying ) ( As Per Engineering Instruction Issued By Jcnl ) . , Commissioning Of 12 Core Optical Fibre Connectivity From The Block Pop/Gp Room To The Cpe Point In The Govt . Office . The Cost Shall Include T Laying , Fittings , Splicing , Splitting , Splice Closure , Pole Clamping Installation , Termination At Fdms/Ftb & All The Relevant Accessories Etc . And End To End Testing Of Dark And Lit Fibre Per Cpe Point In The Govt . Office . ( For Aerial Laying ) ( As Per Engineering Instruction Issued By Jcnl ) . , Ont ( 2 Eth Port , Wi-Fi ) , Pon Splitters 1:4 , 1Kva Ups With 2 Hrs Power Backup , 600 Va Ups With 15-30 Min On A Pc System , 12F Fdms ( Fully Loaded ) , L3 Switch As Per Specification , Sm Sfp Lx Modules 1 G , L2 Switch Type 1 As Per Specification ( Provision For Connectivity Over Optical Fibre ) , L2 Switch Type 2 As Per Specification , L2 Poe Switch As Per Specification , Rcc Poles ( 8 Meters ) , End To End Wireless/Radio Connectivity Along With Wireless Controller As Per Specification , 6U Rack ( Fully Loaded ) , Commissioning Of Roof Top Pole 6 Mtr . With Accessories And Earthing , Commissioning Of Roof Top Pole 9 Mtr . With Accessories And Earthing , Fibre Patch Cord ( 2M ) , Ems/Nms Solution ( For Sla Monitoring ) , Opex ( Table B ) Operations And Maintenance ( Please Fill Per Quarter Rate )