West Bengal Power Development Corporation Limited has published Overhauling Job Of Boiler Pressure Parts Of 250 Mw Unit Of Stps , Wbpdcl. Submission Date for this Tender is 30-10-2019. Washers Tenders in STPS , Santaldih West Bengal. Bidders can get complete Tender details and download the document.
Name of Work: Overhauling job of Boiler Pressure Parts of 250 MW Unit of STPS, WBPDCL. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Overhauling of Boiler Drum. | BI01010001010000000000000515BI0100001113 | 1 | LS |
2 | 2 | Scaffolding of FSH, PLSH, RH . | BI01010001010000000000000515BI0100001114 | 1 | LS |
3 | 3 | Cleaning of boiler pressure parts by HP Waterjet. | BI01010001010000000000000515BI0100001115 | 1 | LS |
4 | 4 | Insertion of tube for FSH, PLSH, RH & LTSH steam cool wall & Spacer Tube. | BI01010001010000000000000515BI0100001116 | 800 | No. |
5 | 5 | Alignment of the FSH,PLSH,RH coils. | BI01010001010000000000000515BI0100001117 | 20 | No. |
6 | 6 | Lifting & refitting of LTSH coil. | BI01010001010000000000000515BI0100001118 | 24 | No. |
7 | 7 | Removal & fitting of guard tube & guard plate for LTSH, Economiser, Cage Wall , Baffle wall etc. | BI01010001010000000000000515BI0100001119 | 4000 | No. |
8 | 8 | Skin casing welding | BI01010001010000000000000515BI0100001120 | 200 | per mtr. |
9 | 9 | Scaffolding of Furnace zone | BI01010001010000000000000515BI0100001121 | 1 | LS |
10 | 10 | Cleaning of furnace zone by HP water jet | BI01010001010000000000000515BI0100001122 | 1 | LS |
11 | 11 | Welding joint for Insertion of furnace wall tube including Screen Tube. | BI01010001010000000000000515BI0100001123 | 250 | No. |
12 | 12 | Welding joint for Insertion of Economiser tube & Economizer Hanger | BI01010001010000000000000515BI0100001124 | 1000 | No. |
13 | 13 | Lifting & refitting of Economiser coil | BI01010001010000000000000515BI0100001125 | 48 | No. |
14 | 14 | Deposition of weld metal on tubes, stubs, headers etc | BI01010001010000000000000515BI0100001126 | 600 | per sq. Inch |
15 | 15 | Stress relieving for pressure welding joint | BI01010001010000000000000515BI0100001127 | 10 | per day |
16 | 16 | Fabrication & fitting of fins for boiler tubes | BI01010001010000000000000515BI0100001128 | 200 | per mtr. |
17 | 17 | Sealing at top of bottom ash hopper by wooden planks, GI sheet etc | BI01010001010000000000000515BI0100001130 | 1 | LS |
18 | 18 | Inspection of pent house | BI01010001010000000000000515BI0100001131 | 1 | LS |
19 | 19 | Repairing of pent house | BI01010001010000000000000515BI0100001132 | 100 | Meter |
20 | 20 | Cleaning & resetting of spring /sling at pent house | BI01010001010000000000000515BI0100001133 | 1 | LS |
21 | 21 | Roof loose tube proper clamping | BI01010001010000000000000515BI0100001135 | 10 | No. |
22 | 22 | D-metering of pressure parts | BI01010001010000000000000515BI0100001136 | 1 | LS |
23 | 23 | DP test of stub/regular joints | BI01010001010000000000000515BI0100001137 | 1 | LS |
24 | 24 | Radiography of pressure welding joints (Including Turbine area) | BI01010001010000000000000515BI0100001138 | 2300 | Per Snap |
25 | 25 | Servicing & Trivy test of Drum, SH,RH, safety valves | BI01010001010000000000000515BI0100001139 | 10 | No. |
26 | 26 | Servicing of soot blower safety valve | BI01010001010000000000000515BI0100001140 | 1 | No. |
27 | 27 | Fabrication of different size bends | BI01010001010000000000000515BI0100001142 | 80 | No. |
28 | 28 | Economiser header stub joint rectification / replacement | BI01010001010000000000000515BI0100001143 | 50 | No. |
29 | 29 | LTSH inlet header stub joint rectification / replacement | BI01010001010000000000000515BI0100001145 | 100 | No. |
30 | 30 | Replacement of HP Valve Size upto 50mm | BI01010001010000000000000515BI0100001146 | 25 | No. |
31 | 31 | Replacement of HP Valve Size above 50mm | BI01010001010000000000000515BI0100001147 | 8 | No. |
32 | 32 | Wind Box Repairing Work (Both Sides) | BI01010001010000000000000515BI0100001148 | 1 | LS |
33 | 33 | Ash Cleaning of Boiler internal & Ducts. | BI01010001010000000000000515BI0100001149 | 1 | LS |
34 | 34 | Removal & reapplication of Refractory. | BI01010001010000000000000515BI0100001150 | 15 | Tonne |
35 | 35 | Removal & reapplication of Insulation. | BI01010001010000000000000515BI0100001151 | 1500 | square meter |
36 | 36 | Hiring of 01 no. of Hydra / crane (Capacity: 11 Ton) with Operator & Fuel. | BI01010001010000000000000515BI0100001152 | 1 | LS |
37 | 37 | Boiler external cleaning by air & water. | BI01010001010000000000000515BI0100001153 | 1 | LS |
38 | 38 | Deputation of one no. expert (ex-bhel) for safety valve servicing from absolute boiler care or best expert service team. | BI01010001010000000000000515BI0100001154 | 15 | days |
39 | 39 | Deputation of one no. expert (ex-bhel) for checking and necessary correction of all boiler hanger support as per schedule from absolute boiler care or best expert service team. | BI01010001010000000000000515BI0100001156 | 8 | days |