}

Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Kot - 2 Smpl, Kot 3 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 4 Fire Hydrants 5 F, IOCL Kot Station, Via Bali, Dist Pali, Rajasthan-Rajasthan

Indian Oil Corporation Limited-IOCL has published Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Kot - 2 Smpl, Kot 3 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 4 Fire Hydrants 5 F. Submission Date for this Tender is 21-10-2019. Sirens Tenders in IOCL Kot Station, Via Bali, Dist Pali, Rajasthan Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

22141098
Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Kot - 2 Smpl, Kot 3 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 4 Fire Hydrants 5 F
Open Tender
Indian
Rajasthan
IOCL Kot Station, Via Bali, Dist Pali, Rajasthan
21-10-2019

Tender Details

Corrigendum - Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Kot - 2 Smpl, Kot 3 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 4 Fire Hydrants 5 Fire Extinguishers Of All Types & Capaci 6 Valves Of Fire Line Of Sizes 4-16 Nb 7 Foam / Water Monitors 8 Fire Hose 9 Hose Box 10 Nozzles All Types Including Foam Branch Pipes 11 Sand Buckets With Sands For All Buckets 12 Foam Trolley. Foam Tank 200 / 1000 Ltr. Capacity 13 Inspection And Hydrotest Of Fire Fighting Delivery Hoses As Per Direction Of Eic And Oisd-142 Inclusive Of All Tools & Tackles , Consumable, Transportation Labour Charges Etc. Reporting To Be Done Inprescibed Format ( Rate Per Hose ) , Half Yearly Schedule 14 Refilling Of Breathing Apparatus Set Compressed Air Upto A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclusive Of Transportation, Handling Charges, Hydro Testing From Cce Approved Party , Complete In All Respect. 15 Refilling Of Co2 Gas In Cartridges For Using In Dcp Extinguishers Including All Labour, Transportation Etc.Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 120 / 200Gms ) 16 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 2.0 Kg Co2 Cyl. ) 17 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 4.5 Kg Co2 Cyl. ) 18 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 6.5 / 6.8 Kg Co2 Cyl. ) 19 Hydrotesting Of Dcp Type Fire Extinguishers Of Various Capacities At An Internal Pressure Of 30 Kgf / Cm2 As Per Is-2171 And Oisd-Std-142.Painting Of The Cylinders With One Coat Of Red Oxide Primer And Two Coats Of Synthetic Enamel Paint Of Desired Shade 20 25 / 75 Kg Capacity Dcp Extinguisher 21 10 / 9 Kg Capacity Dcp Extinguisher 22 Testing Of Afff As Per Bis: 4989 From Reputed Institute Like Gujarat Industrial Research And Development Agency, Baroda In All Respect By Providing Cans, Transportation, Man Power Etc 23 Maintenance Related To Smoke And Heat Detectors On Control Building Andmanual Call Points ( Mcp ) 24 Testing And Cleaning Of Analog Addressable ( Per Detector ) Type Heatdetector And Smoke Detector Of Control Building By Providing Tools And Tackle , Consumable , Manpower Etc Complete In All Respect . All Consumable Like Smoke Spray , Heat Detector Kit ( Air Blower ) Will Be Arranged By Party 25 Testing Of Mcp 26 Maintenance Of Isolation Valves Of All Sizes In Fire Water Line Andfoam Line By Opening And Closing The Same, Greasing, Oiling As Required With Supply Of All Man, Material Greases Required For The Work. 27 Complete Overhauling Of Hand Operated Siren Including Oiling, Greasing , Painting And Testing As Per Direction Of Eic Inclsive Of All Tools &Tackles, Consumable, Transportation Etc 28 Supply And Fitting Of New Wind Sock ( As Per Ioc Specification ) , Removingof Old Wind Sock Made Out Of Synthetic Cloth Over Pump Shed And Controlbuilding As Per Direction Of Site Engineer / Eic.Wind Sock Should Bemade From Strong And Durable Nylonn Or Flat Material With Anticorrosiveantiagening Polyurethane Coating To Increase Tear Resistance. It Shouldnot Tear Easily. Warrenty Of 12Months Should Be Given. 29 Supply & Fitting Of Glass Of Hose Box Inclusive Of Rubber Beedingwherever Required Complete In All Respect Inclusive Of Material, Labour, Consumables Etc. ( Rate For Both Glasses & Rubber Beeding ) 30 Supply & Fitting Of Rubber Beeding Of The Complete One Hose Box ( Bothdoors ) As Per Direction Of Site Engineer / Eic Including Removing Ofworn Out Rubber Beeding, Labour Charges, Tools & Tackles Etc. Completein All Respect 31 Supply And Replacing The Spares / Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours, Materials, Carriages, Inclusive Of All Taxes Etc. Complete As Per Requirement Within 48 Hrs Of Receipt Of Complaint. 32 Discharge Hose For 10 / 9 Kg Dcp With Squeeze Grip , Hose Should Not Burst Or Show Leakage Before 50Kgf / Cm2 33 Dcp Extinguisher Cap Washer For 10 / 9 Kg Dcp Cylinder 34 Discharge Hose For 25 / 75 Kg Dcp With Clamps ( 6.5Mtrlength ) . Hose Should Not Burst Or Showleakage Before A Pressure Of50kgf / Cm2. 35 Brass Connection Tube Between Co2 Cylinder & Dcp Cylinder With Leather Washer. 36 Dcp Extinguisher Cap Washer For 25 / 75 Kg Dcp Cylinder 37 Trolley Wheel Set With Required Fittings 38 Hdpe Discharge Horn For 2Kg / 3.2Kg / 4.5 Kg Co2 Extinguisher Along With Bend Pipe Fitting Complete In All Respect As Per Direction Of Eic. 39 Hdpe Discharge Horn For 6.5Kg Capacity Co2 Extinguisher With Fittings As Per Direction Of Eic. 40 High Pressure Discharge Hose For 2.0Kg / 4.5Kg / 6.8Kg Co2 Extinguisher With Fittings As Per Direction Of Eic. 41 Handle For 2Kg / 3.2Kg / 4.5Kg Extinguisher 42 Supply & Fitting Of Clamps For Hanging 2Kg / 3.2Kg & 4.5Kg Co2extinguisher On Wall Including Labour Charges, Tools Tackles &Consumables Complete In All Respect As Per Direction Of Eic. 43 Safety Pin With Nylon String Forco2 Extinguisher 44 Supply & Fitting Plastic Safety Pin Holder In Co2 Extinguisher. 45 Replacement Of Discharge Valve With Isi Mark, Material Of Constructionas Per Is: 3224, Of Portable And Trolley Mounted Co2extinguishers ( Cap.2.0 Kg, 4.5Kg, 6.8 Kg ) 46 Inner Container For Co2 Cartridge Of Dcp Extinguisher 47 Cap Assembly Gun Metal For Dcp Extinguis 48 Discharge Tube Washer For Dcp Extinguish 49 Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colour With Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic 50 Supply & Fitting Fire Hydrant Disc Washer Made Of Neoprene Rubber As Per Direction Of Eic And Is Type A Of Is 937 : 1981 51 Supply & Fitting Fire Hydrant / Fire Hose Coupling Washer For Landing Valve Double Head Outlets ( Type B ) As Per Is Type A Of Is 937 52 Supply And Fitting Of Spindle Assembly For Hydrant Outlets Including Check Nut And Wheel Asper Is5290 : 1993 For Landing Valve Double Head Outlet ( Type B ) ( Gunmetal ) Hydrants 53 Supply And Installation Of Sand Buckets 9 Ltr. Capacity Complete With Paint And Marking Inclusive Of All Taxes. 54 Supply And Fixing Of Small Hammers With Chains For Esd / Mcp Boxes As Per Direction Of Engineer-In-Charge Inclusive Of All Taxes. 55 Supply & Application In Painting Works 56 Painting Of 2Kg / 4.5 / 6.5 Kg Co2 / 9 Kg Dcp Extinguisher With One Coat Of Red Oxide Primer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work Forhydrotesting Date &Due Date& Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Directionof Eic 57 Painting Of 25Kg / 75 Kg Dcp Extinguisher With One Coat Of Red Oxideprimer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work For Hydrotesting Date Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Direction Of Eic Approx 6 Sqm 58 Painting Of Sand Buckets With One Coat Of Redoxide Primer & Two Coats Ofsynthetic Enamel Paint ( Fire Red From Outside & White From Inside ) , Writing Letters On Sand Buckets ( By Stencil ) Complete In All Respect Including Labour Charges , Material, Removing Of Old Sand Filling Back The Sand After Painting Etc. As Per Direction Of Site Engineer / Eic 59 Painting Stand Of Stand Buckets With One Coat Of Red Oxide Primer, Two Coatsof Synthetic Enamel Paint ( Fire Red ) Complete In All Respectincluding Labour, Transportation Material, Writing Letters On Stand Bystencil Etc. As Per Direction Of Eic. 60 Painting Of Hydrant Outlet ( Both Side ) By Luminous Yellow ( 2 Coat ) , Cleaning And Metal Primer ( One Coat ) As Per Direction Eic Complete In All Respect Including Labour , Paint , Tools Tackles , Consumable Etc.Rate Per Double Headed Hydrant 61 Mppl, Kot 62 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 63 Fire Hydrants 64 Fire Extinguishers Of All Types & Capaci 65 Valves Of Fire Line Of Sizes 4-16 Nb 66 Foam / Water Monitors 67 Fire Hose 68 Hose Box 69 Nozzles All Types Including Foam Branch Pipes 70 Sand Buckets With Sands For All Buckets 71 Foam Trolley. Foam Tank 200 / 1000 Ltr. Capacity 72 Inspection And Hydrotest Of Fire Fighting Delivery Hoses As Per Direction Of Eic And Oisd-142 Inclusive Of All Tools & Tackles , Consumable, Transportation Labour Charges Etc. Reporting To Be Done Inprescibed Format ( Rate Per Hose ) , Half Yearly Schedule 73 Refilling Of Breathing Apparatus Set Compressed Air Upto A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclusive Of Transportation, Handling Charges, Hydro Testing From Cce Approved Party , Complete In All Respect. 74 Refilling Of Co2 Gas In Cartridges For Using In Dcp Extinguishers Including All Labour, Transportation Etc.Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 120 / 200Gms ) 75 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 2.0 Kg Co2 Cyl. ) 76 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 4.5 Kg Co2 Cyl. ) 77 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 6.5 / 6.8 Kg Co2 Cyl. ) 78 Hydrotesting Of Dcp Type Fire Extinguishers Of Various Capacities At An Internal Pressure Of 30 Kgf / Cm2 As Per Is-2171 And Oisd-Std-142.Painting Of The Cylinders With One Coat Of Red Oxide Primer And Two Coats Of Synthetic Enamel Paint Of Desired Shade 79 25 / 75 Kg Capacity Dcp Extinguisher 80 10 / 9 Kg Capacity Dcp Extinguisher 81 Maintenance Related To Foam Flooding System 82 Checking And Cleaning Of Uv Ir Flame Detectors Provided In Main Line Engine Shed Inclusive Of Necessary Tools , Tackles, Testing Instruments , Fire Tray , Labour Charges Etc. Will Be Arranged By The Contractor. ( Rate Per Flame Detector ) 83 Checking And Cleaning Of Rate Of Rise Heat Detectors Installed In Roofof Main Line Engine Sheds Inclusive Of Labour, Tools Tackles. Tools Like Wire And Air Blower , Safety Belt And Manpower Etc Will Be Arranged By Contractor. ( Rate Per Heat Detector ) 84 Cleaning Of All Foam Sprinkler Nozzles Provided In Main Line Engine Shed By Removing The Nozzles , Flushing The System, Refitting The Nozzles & Cleaning The Y Type Strainer Near Deluge Valve Complete In All Respect Inclusive Of Tools Tackles, Labours , Consumables Like Teflon Tape Etc. ( Rate Per Cleaning Job For All Nozzles In The Engine Shed ) . 85 Maintenance Of Foam Deluge Valve Of Mainline Pump Shed Fixed Foam Flooding System On Half Yearly Basis 86 Servicing Of Solenoid Valve Of Deluge Valve Of Foam Flooding System On Half Yearly Basis 87 Maintenance Of Water Curtain System Of Control Building 88 Cleaning Of All Water Sprinkler Nozzles Provided For Control Building By Opening Nozzle, Dechocking & Refitting The Same As Per Direction Of Site Engineer / Eic Including Cleaning Of Y Type Strainer Ofwater Curtain System Line And Oiling And Greasing Of Valves Complete Inall Respect Including All Labour, Tools Tackles , Consumable Etc. ( Rate Per Cleaning In The Building, Quarterly ) . 89 Testing Of Afff As Per Bis: 4989 From Reputed Institute Like Gujarat Industrial Research And Development Agency, Baroda In All Respect By Providing Cans, Transportation, Man Power Etc 90 Maintenance Related To Smoke And Heat Detectors On Control Building Andmanual Call Points ( Mcp ) 91 Testing And Cleaning Of Analog Addressable ( Per Detector ) Type Heatdetector And Smoke Detector Of Control Building By Providing Tools And Tackle , Consumable , Manpower Etc Complete In All Respect . All Consumable Like Smoke Spray , Heat Detector Kit ( Air Blower ) Will Be Arranged By Party 92 Testing Of Mcp 93 Maintenance Of Isolation Valves Of All Sizes In Fire Water Line Andfoam Line By Opening And Closing The Same, Greasing, Oiling As Required With Supply Of All Man, Material Greases Required For The Work. 94 Complete Overhauling Of Hand Operated Siren Including Oiling, Greasing , Painting And Testing As Per Direction Of Eic Inclsive Of All Tools &Tackles, Consumable, Transportation Etc 95 Supply And Fitting Of New Wind Sock ( As Per Ioc Specification ) , Removingof Old Wind Sock Made Out Of Synthetic Cloth Over Pump Shed And Controlbuilding As Per Direction Of Site Engineer / Eic.Wind Sock Should Bemade From Strong And Durable Nylonn Or Flat Material With Anticorrosiveantiagening Polyurethane Coating To Increase Tear Resistance. It Shouldnot Tear Easily. Warrenty Of 12Months Should Be Given. 96 Supply & Fitting Of Glass Of Hose Box Inclusive Of Rubber Beedingwherever Required Complete In All Respect Inclusive Of Material, Labour, Consumables Etc. ( Rate For Both Glasses & Rubber Beeding ) 97 Supply & Fitting Of Rubber Beeding Of The Complete One Hose Box ( Bothdoors ) As Per Direction Of Site Engineer / Eic Including Removing Ofworn Out Rubber Beeding, Labour Charges, Tools & Tackles Etc. Completein All Respect 98 Supply And Replacing The Spares / Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours, Materials, Carriages, Inclusive Of All Taxes Etc. Complete As Per Requirement Within 48 Hrs Of Receipt Of Complaint. 99 Discharge Hose For 10 / 9 Kg Dcp With Squeeze Grip , Hose Should Not Burst Or Show Leakage Before 50Kgf / Cm2 100 Dcp Extinguisher Cap Washer For 10 / 9 Kg Dcp Cylinder 101 Discharge Hose For 25 / 75 Kg Dcp With Clamps ( 6.5Mtrlength ) . Hose Should Not Burst Or Showleakage Before A Pressure Of50kgf / Cm2. 102 Brass Connection Tube Between Co2 Cylinder & Dcp Cylinder With Leather Washer. 103 Dcp Extinguisher Cap Washer For 25 / 75 Kg Dcp Cylinder 104 Trolley Wheel Set With Required Fittings 105 Hdpe Discharge Horn For 2Kg / 3.2Kg / 4.5 Kg Co2 Extinguisher Along With Bend Pipe Fitting Complete In All Respect As Per Direction Of Eic. 106 Hdpe Discharge Horn For 6.5Kg Capacity Co2 Extinguisher With Fittings As Per Direction Of Eic. 107 High Pressure Discharge Hose For 2.0Kg / 4.5Kg / 6.8Kg Co2 Extinguisher With Fittings As Per Direction Of Eic. 108 Handle For 2Kg / 3.2Kg / 4.5Kg Extinguisher 109 Supply & Fitting Of Clamps For Hanging 2Kg / 3.2Kg & 4.5Kg Co2extinguisher On Wall Including Labour Charges, Tools Tackles &Consumables Complete In All Respect As Per Direction Of Eic. 110 Safety Pin With Nylon String Forco2 Extinguisher 111 Supply & Fitting Plastic Safety Pin Holder In Co2 Extinguisher. 112 Replacement Of Discharge Valve With Isi Mark, Material Of Constructionas Per Is: 3224, Of Portable And Trolley Mounted Co2extinguishers ( Cap.2.0 Kg, 4.5Kg, 6.8 Kg ) 113 Inner Container For Co2 Cartridge Of Dcp Extinguisher 114 Cap Assembly Gun Metal For Dcp Extinguis 115 Discharge Tube Washer For Dcp Extinguish 116 Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colour With Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic 117 Supply & Fitting Fire Hydrant Disc Washer Made Of Neoprene Rubber As Per Direction Of Eic And Is Type A Of Is 937 : 1981 118 Supply & Fitting Fire Hydrant / Fire Hose Coupling Washer For Landing Valve Double Head Outlets ( Type B ) As Per Is Type A Of Is 937 119 Supply And Fitting Of Spindle Assembly For Hydrant Outlets Including Check Nut And Wheel Asper Is5290 : 1993 For Landing Valve Double Head Outlet ( Type B ) ( Gunmetal ) Hydrants 120 Supply And Installation Of Sand Buckets 9 Ltr. Capacity Complete With Paint And Marking Inclusive Of All Taxes. 121 Supply And Fixing Of Small Hammers With Chains For Esd / Mcp Boxes As Per Direction Of Engineer-In-Charge Inclusive Of All Taxes. 122 Supply & Application In Painting Works 123 Painting Of 2Kg / 4.5 / 6.5 Kg Co2 / 9 Kg Dcp Extinguisher With One Coat Of Red Oxide Primer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work Forhydrotesting Date &Due Date& Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Directionof Eic 124 Painting Of 25Kg / 75 Kg Dcp Extinguisher With One Coat Of Red Oxideprimer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work For Hydrotesting Date Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Direction Of Eic Approx 6 Sqm 125 Painting Of Sand Buckets With One Coat Of Redoxide Primer & Two Coats Ofsynthetic Enamel Paint ( Fire Red From Outside & White From Inside ) , Writing Letters On Sand Buckets ( By Stencil ) Complete In All Respect Including Labour Charges , Material, Removing Of Old Sand Filling Back The Sand After Painting Etc. As Per Direction Of Site Engineer / Eic 126 Painting Stand Of Stand Buckets With One Coat Of Red Oxide Primer, Two Coatsof Synthetic Enamel Paint ( Fire Red ) Complete In All Respectincluding Labour, Transportation Material, Writing Letters On Stand Bystencil Etc. As Per Direction Of Eic. 127 Painting Of Foam Tank Of Capacity 2.2 Kl & Deluge Valve Along Associated Piping Near Tank And In Foam Building Block , & A With One Coat Ofredoxide Primer & Two Coats Of Fire Red Synthetic Enamel Paint, Writtingletters On The Tank, Piping Etc. Complete In All Respect As Perdirection Of Eic / Site Engineer 128 Painting Of Hydrant Outlet ( Both Side ) By Luminous Yellow ( 2 Coat ) , Cleaning And Metal Primer ( One Coat ) As Per Direction Eic Complete In All Respect Including Labour , Paint , Tools Tackles , Consumable Etc.Rate Per Double Headed Hydrant 129 Ppe Maintenance / Up Keep On Monthly Basis Like As Helmets, Breathing Apparatus, Water Jel Blanket, Asbestes Blanket, Resuscitation Set, Fire Proximity Suite, Goggles, Belts, Strature Etc. In Control Room And Other Roooms As Per Instruction Of Engineer-In-Charge Inclusive Of Taxes. 130 Kspl, Kot 131 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 132 Fire Hydrants 133 Fire Extinguishers Of All Types & Capaci 134 Valves Of Fire Line Of Sizes 4-16 Nb 135 Foam / Water Monitors 136 Fire Hose 137 Hose Box 138 Nozzles All Types Including Foam Branch Pipes 139 Sand Buckets With Sands For All Buckets 140 Inspection And Hydrotest Of Fire Fighting Delivery Hoses As Per Direction Of Eic And Oisd-142 Inclusive Of All Tools & Tackles , Consumable, Transportation Labour Charges Etc. Reporting To Be Done Inprescibed Format ( Rate Per Hose ) , Half Yearly Schedule 141 Refilling Of Breathing Apparatus Set Compressed Air Upto A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclusive Of Transportation, Handling Charges, Hydro Testing From Cce Approved Party , Complete In All Respect. 142 Refilling Of Co2 Gas In Cartridges For Using In Dcp Extinguishers Including All Labour, Transportation Etc.Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 120 / 200Gms ) 143 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 2.0 Kg Co2 Cyl. ) 144 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 4.5 Kg Co2 Cyl. ) 145 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 6.5 / 6.8 Kg Co2 Cyl. ) 146 Hydrotesting Of Dcp Type Fire Extinguishers Of Various Capacities At An Internal Pressure Of 30 Kgf / Cm2 As Per Is-2171 And Oisd-Std-142.Painting Of The Cylinders With One Coat Of Red Oxide Primer And Two Coats Of Synthetic Enamel Paint Of Desired Shade 147 25 / 75 Kg Capacity Dcp Extinguisher 148 10 / 9 Kg Capacity Dcp Extinguisher 149 Maintenance Related To Foam Flooding System 150 Checking And Cleaning Of Uv Ir Flame Detectors Provided In Main Line Engine Shed Inclusive Of Necessary Tools , Tackles, Testing Instruments , Fire Tray , Labour Charges Etc. Will Be Arranged By The Contractor. ( Rate Per Flame Detector ) 151 Checking And Cleaning Of Rate Of Rise Heat Detectors Installed In Roofof Main Line Engine Sheds Inclusive Of Labour, Tools Tackles. Tools Like Wire And Air Blower , Safety Belt And Manpower Etc Will Be Arranged By Contractor. ( Rate Per Heat Detector ) 152 Testing Of Afff As Per Bis: 4989 From Reputed Institute Like Gujarat Industrial Research And Development Agency, Baroda In All Respect By Providing Cans, Transportation, Man Power Etc 153 Maintenance Related To Smoke And Heat Detectors On Control Building Andmanual Call Points ( Mcp ) 154 Maintenance Of Isolation Valves Of All Sizes In Fire Water Line Andfoam Line By Opening And Closing The Same, Greasing, Oiling As Required With Supply Of All Man, Material Greases Required For The Work. 155 Supply And Fitting Of New Wind Sock ( As Per Ioc Specification ) , Removingof Old Wind Sock Made Out Of Synthetic Cloth Over Pump Shed And Controlbuilding As Per Direction Of Site Engineer / Eic.Wind Sock Should Bemade From Strong And Durable Nylonn Or Flat Material With Anticorrosiveantiagening Polyurethane Coating To Increase Tear Resistance. It Shouldnot Tear Easily. Warrenty Of 12Months Should Be Given. 156 Supply & Fitting Of Glass Of Hose Box Inclusive Of Rubber Beedingwherever Required Complete In All Respect Inclusive Of Material, Labour, Consumables Etc. ( Rate For Both Glasses & Rubber Beeding ) 157 Supply & Fitting Of Rubber Beeding Of The Complete One Hose Box ( Bothdoors ) As Per Direction Of Site Engineer / Eic Including Removing Ofworn Out Rubber Beeding, Labour Charges, Tools & Tackles Etc. Completein All Respect 158 Supply And Replacing The Spares / Assembles Etc Of The Fire Fighting Equipments System For All Sizes / Capacities As Per Isi Standard And Approved Make With All Labours, Materials, Carriages, Inclusive Of All Taxes Etc. Complete As Per Requirement Within 48 Hrs Of Receipt Of Complaint. 159 Discharge Hose For 10 / 9 Kg Dcp With Squeeze Grip , Hose Should Not Burst Or Show Leakage Before 50Kgf / Cm2 160 Dcp Extinguisher Cap Washer For 10 / 9 Kg Dcp Cylinder 161 Discharge Hose For 25 / 75 Kg Dcp With Clamps ( 6.5Mtrlength ) . Hose Should Not Burst Or Showleakage Before A Pressure Of50kgf / Cm2. 162 Brass Connection Tube Between Co2 Cylinder & Dcp Cylinder With Leather Washer. 163 Dcp Extinguisher Cap Washer For 25 / 75 Kg Dcp Cylinder 164 Trolley Wheel Set With Required Fittings 165 Hdpe Discharge Horn For 2Kg / 3.2Kg / 4.5 Kg Co2 Extinguisher Along With Bend Pipe Fitting Complete In All Respect As Per Direction Of Eic. 166 Hdpe Discharge Horn For 6.5Kg Capacity Co2 Extinguisher With Fittings As Per Direction Of Eic. 167 High Pressure Discharge Hose For 2.0Kg / 4.5Kg / 6.8Kg Co2 Extinguisher With Fittings As Per Direction Of Eic. 168 Handle For 2Kg / 3.2Kg / 4.5Kg Extinguisher 169 Supply & Fitting Of Clamps For Hanging 2Kg / 3.2Kg & 4.5Kg Co2extinguisher On Wall Including Labour Charges, Tools Tackles &Consumables Complete In All Respect As Per Direction Of Eic. 170 Safety Pin With Nylon String Forco2 Extinguisher 171 Supply & Fitting Plastic Safety Pin Holder In Co2 Extinguisher. 172 Replacement Of Discharge Valve With Isi Mark, Material Of Constructionas Per Is: 3224, Of Portable And Trolley Mounted Co2extinguishers ( Cap.2.0 Kg, 4.5Kg, 6.8 Kg ) 173 Inner Container For Co2 Cartridge Of Dcp Extinguisher 174 Cap Assembly Gun Metal For Dcp Extinguis 175 Discharge Tube Washer For Dcp Extinguish 176 Supply And Fitting Of Plastic Blank Cap ( As Per Is 5290 , Red Colour With Gi Chain ) Suitable For 63 Mm Hydrant Outlet As Per Direction Of Eic 177 Supply & Fitting Fire Hydrant Disc Washer Made Of Neoprene Rubber As Per Direction Of Eic And Is Type A Of Is 937 : 1981 178 Supply & Fitting Fire Hydrant / Fire Hose Coupling Washer For Landing Valve Double Head Outlets ( Type B ) As Per Is Type A Of Is 937 179 Supply And Fitting Of Spindle Assembly For Hydrant Outlets Including Check Nut And Wheel Asper Is5290 : 1993 For Landing Valve Double Head Outlet ( Type B ) ( Gunmetal ) Hydrants 180 Supply And Installation Of Sand Buckets 9 Ltr. Capacity Complete With Paint And Marking Inclusive Of All Taxes. 181 Supply And Fixing Of Small Hammers With Chains For Esd / Mcp Boxes As Per Direction Of Engineer-In-Charge Inclusive Of All Taxes. 182 Supply & Application In Painting Works 183 Painting Of 2Kg / 4.5 / 6.5 Kg Co2 / 9 Kg Dcp Extinguisher With One Coat Of Red Oxide Primer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work Forhydrotesting Date &Due Date& Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Directionof Eic 184 Painting Of 25Kg / 75 Kg Dcp Extinguisher With One Coat Of Red Oxideprimer & Two Coats Of Fire Red Synthetic Enamel Paint ( Asian Paint / Berger / Nerolac ) Including Writting Work For Hydrotesting Date Sr No, Surface Preparation Cleaning, Transportation , Labour , Material Etc In All Respect. As Per Direction Of Eic Approx 6 Sqm 185 Painting Of Sand Buckets With One Coat Of Redoxide Primer & Two Coats Ofsynthetic Enamel Paint ( Fire Red From Outside & White From Inside ) , Writing Letters On Sand Buckets ( By Stencil ) Complete In All Respect Including Labour Charges , Material, Removing Of Old Sand Filling Back The Sand After Painting Etc. As Per Direction Of Site Engineer / Eic 186 Painting Stand Of Stand Buckets With One Coat Of Red Oxide Primer, Two Coatsof Synthetic Enamel Paint ( Fire Red ) Complete In All Respectincluding Labour, Transportation Material, Writing Letters On Stand Bystencil Etc. As Per Direction Of Eic. 187 Painting Of Hydrant Outlet ( Both Side ) By Luminous Yellow ( 2 Coat ) , Cleaning And Metal Primer ( One Coat ) As Per Direction Eic Complete In All Respect Including Labour , Paint , Tools Tackles , Consumable Etc.Rate Per Double Headed Hydrant 188 Maintenance Related To Foam Pourer And Sprinkler System ( Tank ) 189 Removing Old Damaged Wire Mesh In Foam Pourer Outlet And Replacing With New One As Directed By Eic Including Supply Of Mesh, Studs, Tools Tackles Complete In All Respects. 190 Dechoking Of Foam Makers By Opening Of Venturi And Air Inlets And Flushing With Water, Refitting Back The Foam Maker & Making It Leak Tight & Testing The Same Including All Labour, Materials, Tools And Tackles Complete In All Respect ( Except The Gaskets, Nuts And Bolts ) 191 Replacement Of Defective Foam Pourer With Supply And Installation Of New Foam Pourer ( Supply By Owner ) As Per Existing Specification Inclusive Of Studs / Nut Bolts , Tools Tackles, Labour Charges Etc. Complete In All Respects. 192 Performance Checking Of Foam Pourer And Sprinkler System ( Approx 150 Nos Per Tank ) Including Greasing Of All Associated Valve By Opening Related Valves And Other Labour Assistance And Submitting A Report As Per Directions Of Engineer-In-Charge .Rates Per Testing Per Tank 193 Cleaning / De-Chocking Of Nozzles Of Water Spray System At Oil Storage Tanks By Opening Nozzle, Dechocking & Refitting The Same As Per Direction Of Site Engineer / Eic Complete In All Respect Including Labour , Tools Tackles , Consumable Etc 194 Flushing The Sprinkler Line By Removing The End Flanges Of The Sprinkler Line Segment & Refitting The Same After Flushing, Inclusive Of Tools Tackles , Nut Bolts If Required Complete In All Respect As Per Direction Of Site Engineer / Eic. ( Rates Are Per Segment )

Key Value

Document Fees
Refer document
EMD
INR 10400.0 /-
Tender Value
INR 8.74 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail