Brahmaputra Cracker And Polymer Limited-BCPL has published Hiring Of 3Rd Party Surveyor / Inspectorate At Port For Procurement Of Butene-1 ( Bulk Import ) For Bcpl-Lepetkata For A Period Of 12 Month Please Refer Tender Documents . . Submission Date for this Tender is 18-10-2019. Pure Elemental Gases Tenders in Please refer Tender documents. Assam. Bidders can get complete Tender details and download the document.
Name of Work: HIRING OF 3rd PARTY SURVEYOR / INSPECTORATE AT PORT FOR PROCUREMENT OF BUTENE-1 (BULK IMPORT) FOR BCPL-LEPETKATA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | MARINE SUPERVISORY CARGO SURVEY JOB AT APM TERMINAL, PPIPAVAV PORT\n\nSurveyor job for unloading of Butane-1 cargo of various capacity from 1000 MT to 2000 MT at Pipavav Jetty. All the jobs are to be carried out for BCPL as per the Scope of work enclosed as Annexure I (Point no. 01 to 08) in brief given below: \n\ni. Ship end : Communication with ship master, inspection of vessel's tank , witnessing entire operation of inspection and gauging of vessel tanks , recording of statement of fact, preparation of ullage report , preparation of time sheet and other reports, calculation and report of vessel discharge quantity , calculation of Loss/gain, submission of report on the same day.\nii. Shore end: Stock report at shore end tanks, witnessing and calculation of stock in shore tanks before and after unload of ship, witness entire operation at import terminal, shore receipt quantity calculation, calculation of loss/gain. \niii. Documentation as per Annexure-I\niv. Work related with road tankers\n | Nil1 | 12 | MONTHS |
2 | 2 | SAMPLING & ANALYSIS as per Annexure-1 (Point no. 09)\n\nSeparate sampling to be done for each cargo i.e. Butene-1. The job scope shall include taking sample including providing required sampling bombs ,during vessel receipt operations, sending the samples taken to government approved laboratories as directed by BCPL/surveyors own lab facility from time to time for sample analysis and submission of lab analysis report after completion of vessel discharge activity. \nSampling of road tankers and spheres (Dew point and oxygen) at surveyors own lab facility, whenever required.\n | Nil2 | 12 | MONTHS |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail