| 1 | 1 | Earth Work excavation in foundation in hard soil including moorum stony earth and earth mixed with boulder within 50 m initial lead and 1.5 m initial lift including dressing and breaking clods levelling the bed up to required depth and depositing the excavated materials with all leads and lifts T and P etc. complete as per direction of Engineer-in-charge. | | 292.5 | cum |
|---|
| 2 | 2 | Supplying and filling in foundation and plinth with sand well watered and rammed with cost, conveyance, royalty taxes of all materials etc. complete as per direction of engineer-in-charge. | | 237.45 | cum |
|---|
| 3 | 3 | Cement Concrete (1:4:8) with 4 cm size HBG metal of approved quality from approved quarry including lowering laying concrete water curing to required level not exceeding 150 mm thick including cost, conveyance, royalty taxes of all materials etc. complete as per direction of Engineer-in-charge. | | 180.2 | cum |
|---|
| 4 | 4 | RCC M - 20 with 12mm size HG chips for RCC works including all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the department & direction of Engineer-in-charge. | | 57.27 | cum |
|---|
| 5 | 5 | Supplying cutting straitening the bent up uncoated HYSD reinforcement including cutting bending, binding, tying the grill and placing in position as required for R.C.C. Work including cost, conveyance, royalty taxes of rod and binding wire of 18 to 20 gauge etc. complete as per direction of Engineer-in-charge of Rod and no separate payment will be made towards the weight of binding wire. | | 50.5 | cum |
|---|
| 6 | 6 | Rigid and smooth centring and shuttering C.C. work in foundation, plinth band and footing bases of columns. Pre cast slabs etc including false work and dismantling then after casting including cost of materials complete in ground floor. For Foundation and plinth | | 123.27 | sqm |
|---|
| 7 | 7 | Rigid and smooth centring and shuttering C.C. work in foundation, plinth band and footing bases of columns. Pre cast slabs etc including false work and dismantling then after casting including cost of materials complete in ground floor. For Foundation Lintel | | 3.87 | sqm |
|---|
| 8 | 8 | Rigid and smooth centring and shuttering C.C. work in foundation, plinth band and footing bases of columns. Pre cast slabs etc including false work and dismantling then after casting including cost of materials complete in ground floor. For Col and Beam | | 15.27 | sqm |
|---|
| 9 | 9 | Rigid and smooth centring and shuttering C.C. work in foundation, plinth band and footing bases of columns. Pre cast slabs etc including false work and dismantling then after casting including cost of materials complete in ground floor. For Slab | | 7.21 | sqm |
|---|
| 10 | 10 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and plinth including cost conveyance and royalty of all materials complete. | | 101.3 | cum |
|---|
| 11 | 11 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in super structure including cost conveyance and royalty of all materials complete. | | 57.68 | cum |
|---|
| 12 | 12 | 12 mm thick cement plaster in CM (1:6) including cost, carriage & royalty etc. complete. | | 60.31 | sqm |
|---|
| 13 | 13 | 16 mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm | | 78.63 | sqm |
|---|
| 14 | 14 | Cement Concrete (1:2:4) using 12 mm size hard crusher broken chips of approved quality from approved quarry including hoisting and laying compacting watering curing including cost, conveyance, royalties taxes of all materials etc. completed as per direction of Engineer-in-charge. | | 64.67 | sqm |
|---|
| 15 | 15 | Supplying fitting and fixing M.S. angle including all cost and conveyance and royalty as per Engineer-in-charge. | | 9249.3 | kg |
|---|
| 16 | 16 | Fitting and fixing G.C.I (Dura shine colour sheet) in roof drilling holes in wind ties incl. fixing of ridges vallley windties including cost of fitting per/sqm. | | 1618.4 | sqm |
|---|
| 17 | 17 | 2 coats to inside wall with plastic emulsion paint of aprooved shade on new work to give an even shade including cost of paint. | | 60.31 | sqm |
|---|
| 18 | 18 | Finishing outside walls with water proofing cement paints of approved shade in new work 2 coats to give an shade including cost of paints. | | 78.63 | sqm |
|---|
| 19 | 19 | Laying of 7.5 mm @ PVC Pipe | | 50 | mt |
|---|
| 20 | 20 | Laying of Bend | | 10 | nos |
|---|
| 21 | 21 | Laying of Tee | | 50 | nos |
|---|
| 22 | 22 | Laying of Cowl | | 14 | nos |
|---|
| 23 | 23 | Tube Well Overhead tank | | 2000 | l |
|---|
| 24 | 24 | 6mm thick cement plester (1:4) to RCC surface finish smooth including closed deep chiping & slury treatment including all cost conveyance royalty and taxes etc. comp. | | 5.4 | sqm |
|---|
| 25 | 25 | 12mm thick cement plaster (1:4) on brick work with punning including all cost conveyance royalty & taxes etc. comp. | | 26 | sqm |
|---|
| 26 | 26 | 2.5 m thick AS Flooring CC (1:2:4) with 12mm size HGCB chips in all cost conveyance royalty etc. complete. | | 10.2 | sqm |
|---|
| 27 | 27 | Fixing tiles in floors trades or steps and landing on 25mm bed of cement mortar 1:1 jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) | | 68.46 | sqm |
|---|
| 28 | 28 | Fixing tiles in dados striking and rises of steps on 12mm cement plaster ( 1:3 ) jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) | | 22.4 | sqm |
|---|
| 29 | 29 | Supplying fitting and fixing of PVC door | | 2 | nos |
|---|
| 30 | 30 | Painting two coat with any approved paint on new work. | | 76.14 | sqm |
|---|
| 31 | 31 | Supplying and fitting and fixing RCC Precast Jally including all cost etc. complete. | | 0.36 | sqm |
|---|
| 32 | 32 | Supply and filing of KB Brick Khua inside the soak pit including all cost etc. complete. | | 2.55 | cum |
|---|
| 33 | 33 | 25 mm thick grading concrete (1:2:2) on roof slab including all cost etc. complete. | | 55.53 | sqm |
|---|
| 34 | 34 | Labour for drilling a perfectly vertical bore hole of specified dia for specific depth belo ground level through consolidated and unconsolidated rock with combination drilling rings as requred to suit the site consdition as per the direction of EIC including use of own rig with its accessories. T&P and consumables, etc. for lowring of 200mm/150 mm dia G.I./PVC/ MS pipe for housing field with socket with or without well screen as per the necessity for the soft, medium, hard & boulder formation (G.T/PVC casing pipes, if requred to prevent collapse of over burder is to be provided the contractor including lowring and withdrawing after completion of tube well. for drilling of 125 mm dia 0mtr x 35 mtr Drilling of 125 mm dia 0 mtr x 35mtr | | 35 | mt |
|---|
| 35 | 35 | Labour for drilling a perfectly vertical bore hole of specified dia for specific depth belo ground level through consolidated and unconsolidated rock with combination drilling rings as requred to suit the site consdition as per the direction of EIC including use of own rig with its accessories. T&P and consumables, etc. for lowring of 200mm/150 mm dia G.I./PVC/ MS pipe for housing field with socket with or without well screen as per the necessity for the soft, medium, hard & boulder formation (G.T/PVC casing pipes, if requred to prevent collapse of over burder is to be provided the contractor including lowring and withdrawing after completion of tube well. for drilling of 125 mm dia 0mtr x 35 mtr Drilling of 100 m dia 35 mtr x 65 mtr | | 30 | mt |
|---|
| 36 | 36 | Lowering the following size of G.I./PVC/ MS housing pipes as per the necessary from ground level up to 30 mtr. Depth and lifted and fixed yup in perfectly vertical position including cutting and threading of pipes and slotted pipes and supplying and fixing all joiting material T&P etc. all complete and keeping the top of casing pipes threaded including plugging tube wells to prevents entry of foreign materials from above. Lowring of 125 mm dia | | 35 | mt |
|---|
| 37 | 37 | Cost of PVC casing pipes 125mm dia 35 mtr. | | 35 | mtr |
|---|
| 38 | 38 | Cleaning and developing tube well their own compressor continously watered till clean and adequate discharge is obtain from the tube well including supply and use of all necessary equipment and labour as per direction of EIC. | | 1 | nos |
|---|
| 39 | 39 | Supplying all materials and labour, tools and plant and providing sanitary sealing cement concrete frouting of aanular space around PVC assign pipe upto 5 mtr below ground level to plug the bore hole excluding cost of cement all complete as per direction of the EIC. Minimum 1 mtr of casing pipe to be inserted in the bore into the rock at the bottom of ensure sanitary sealing excluding cost of cement which will be supplied directly be the partment. | | 1 | nos |
|---|
| 40 | 40 | Supplying, fitting, lowring and commisioning of '1 1/2\" dia PVC long thread submersible pipe clamp etc. including cost of pipe, vlamps adopter, non return valve, bend flange fitting excluding cost of pump. | | 50 | mtr |
|---|
| 41 | 41 | Supplying fitting and fixing of 1 HP single phase submersible pump. | | 1 | nos |
|---|
| 42 | 42 | Supplying fitting and fixing of 1 HP single phase starter and extra other fitting. | | 1 | mtr |
|---|
| 43 | 43 | Supplying with fitting of MS Iron panel starter box. | | 1 | nos |
|---|
| 44 | 44 | Supplying fitting and fixing 6 sqm 2 core cable for service wire. | | 15 | mtr |
|---|
| 45 | 45 | Supplying, fitting and fixing of submersible Cable. | | 60 | mtr |
|---|
| 46 | 46 | Pipe line - Labour for laying jointing PVC ASTM Sch-80 PVC Pipe and jointed with GI fitting etc all complete. 32 mm PVC pipe line | | 187.15 | mtr |
|---|
| 47 | 47 | Supplying all labour T&P for fixing of brass GMFW valve. | | 2 | nos |
|---|
| 48 | 48 | Cost of material 32 mm pvc pipe | | 187.15 | mtr |
|---|
| 49 | 49 | Cost of material 32 mm brass valve | | 2 | nos |
|---|
| 50 | 50 | Supplying all material labour T&P for fitting and fixing of water closet Squating pan | | 2 | nos |
|---|
| 51 | 51 | Supplying all material labour T&P for fitting and fixing PVC soile waste pipe. 75 mm dia PVC SWR pipe | | 60 | mtr |
|---|
| 52 | 52 | Supplying all material labour T&P for fitting and fixing PVC soile waste pipe. Bend | | 4 | nos |
|---|
| 53 | 53 | Supplying all material labour T&P for fitting and fixing PVC soile waste pipe. Tee | | 1 | nos |
|---|
| 54 | 54 | Supplying all material labour T&P for fitting and fixing PVC soile waste pipe. Vent Cawel | | 1 | nos |
|---|
| 55 | 55 | Supplying all material labour T&P for cutting of hole for PVC pipe line as per PH specification upto 250 mm thick masonary wall. | | 2 | nos |
|---|
| 56 | 56 | Compound Wall | | 1 | LS |
|---|
| 57 | 57 | Napkin incinerator unit | | 1 | LS |
|---|
| 58 | 58 | Funiture for office and electrical fly cather (6 nos) | | 1 | Ls |
|---|
| 59 | 59 | Electrification | | 1 | LS |
|---|