Supply / Installation/ Testing & Commissioning Of Electro And Mechanical Equipment For Newly Constructed Bps At Pocket A-12 Kalkaji Extension Under Tughlakabad Constituency, Works-Delhi

Delhi Jal Board-DJB has published Supply / Installation/ Testing & Commissioning Of Electro And Mechanical Equipment For Newly Constructed Bps At Pocket A-12 Kalkaji Extension Under Tughlakabad Constituency. Submission Date for this Tender is 24-09-2019. Busbar Tenders in Works Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

21728051
Supply / Installation/ Testing & Commissioning Of Electro And Mechanical Equipment For Newly Constructed Bps At Pocket A-12 Kalkaji Extension Under Tughlakabad Constituency
Open Tender
Indian
Delhi
Works
24-09-2019

Tender Details

Supply / Installation / Testing & Commissioning Of Electro And Mechanical Equipment For Newly Constructed Bps At Pocket A-12 Kalkaji Extension Under Tughlakabad Constituency:-1 Newly Constructed Bps 2 P / O Of 40 Hp Tefc Squirrel Cage Induction Motor Suitable For 3 Phase Ac, 1480 Rpm. Nmake – Kirloskar / Cg / Abb / Djb Approved N 3 P / O Of Coupling And Coupling Guard For Above Pump Set 4 P / O Of M.S. Base Frame For Above Pump Set. 5 P / O Of 3 Core Fr Pvc Insulated Of 16 Sq.Mm. Copper Conductor Cable For Voltage Upto 1100 V. Nmake –Icc / Cci / Universal / Grandlay / Gloster / Djb Approved N 6 P / O Of Vacuum Pump Npump Model : Dv-40 With S.S Rotor, Suction & Delivery Size 40 X 40 Mm. Nmake :- Wilo Matter & Platt / Kirloskar / Djb Approved N 7 P / O Of 5 Hp Tefc Squirrel Cage Induction Motor Suitable For 3 Phase Ac, 1450 Rpm. N Make – Kirloskar / Cg / Abb / Djb Approved N 8 P / O Of Coupling And Coupling Guard For Vaccum Pump. 9 P / O Of M.S. Base Frame For For Vaccum Pump. 10 P / O Of 3 Core Fr Pvc Insulated Of 4 Sq.Mm. Copper Conductor Cable For Voltage Upto 1100 V. N Make – Icc / Cci / Universal / Grandlay / Gloster / Djb Approved. N 11 P / O Of Xple / Pvc Insulated & Pvc Sheathed ( Heavy Duty ) Armoured Aluminium Conductor Cable Of Size 95 Sq.Mm. – 3.5 Core For Voltage Upto 1100 V. Nmake – Icc / Cci / Universal / Grandlay / Gloster / Djb Approved. N 12 P / O Of M.S. Pipe Of Size 125 Mm Dia Length 26 Mtr. Of Class’C’. Make – Jindal / Tata 13 P / O Of M.S. Flange Of Size 125 Mm Dia 14 P / O Of Cidf Manually Operated Sluice Valve Of Size 125 Mm Dia Pn 1.0. Make – Kirloskar / Ivc 15 P / O Of Cidf Swing Type Nrv Of Size 125 Mm Dia Pn 1.0. Make – Kirloskar / Ivc 16 P / O Of M.S. Bend Of Size 125 Mm Dia Of Class -C 17 P / O Of M.S. Pipe Of Size 200 Mm Dia Thickness 8 Mm. Nmake – Jindal / Tata N 18 P / O Y Of M.S. Dead Flange Of Size 200 Mm Dia. 19 P / O Of M.S. Flange Of Size 200 Mm Dia. 20 P / O Of Cidf Manually Operated Sluice Valve Of Size 200 Mm Dia Pn 1.0 Make – Kirloskar / Ivc 21 P / O Of Cidf Swing Type Nrv Of Size 200 Mm Dia Pn 1.0 Make – Kirloskar / Ivc 22 P / O Of M.S. Reducer Of Size 125 X 100 Mm Dia. 23 P / O Of M.S. Bend Of Size 200 Mm Dia Of Class-C. 24 P / O Ly Of G.I. Pipe Of Size 40 Mm Dia Of Class-C. Nmake- Jindal / Tata N 25 P / O Of G.I. Flange Of Size 40 Mm Dia. Make – Unik / Djb Approved 26 P / O Of G.I. Elbow Of Size 40Mm Dia. Make – Unik / Djb Approved 27 P / O Of G.I. Tee Of Size 40 Mm Dia. Make - Unik / Djb Approved 28 P / O Of Sant Forget Brass Ball Valve Of Size 40 Mm Dia Npn : 25 Make :- Sant / Djb Approved N 29 P / O / Fixing Of Pvc Water Storage Tank Make :- Sant / Djb Approved 30 P / O Of Rubber Gasket Of Size 125 Mm Dia Of Thickness 6 Mm. 31 P / O Of Rubber Gasket Of Size 200 Mm Dia Of Thickness 6 Mm. 32 P / O Of Good Quality Of Nut Bolt And Washer. 33 B Installation Work :- Making A Rcc Foundation Of 40 Hp Pump Set Of Size 6’X4’X3’ Of ( M20 ) Grade Ratio 1:1:5:3 Cement Concrete Of 40 Hp Pump Set As Per Site Requirement. 34 Making A Rcc Foundation Of 5 Hp Vaccum Pump Size 4’X3’X2’ Of ( M20 ) Grade Ratio 1:1:5:3 Cement Concrete Of 40 Hp Pump Set As Per Site Requirement 35 Fixing The Base Frame Along With 40 Hp Pump Set On Rcc Foundation And Also Providing / Fixing Of Foundation Nut Bolt Of Size ¾’’ X 8’’ – 6 Nos. With Proper Leveling Complete 36 Fixing The Base Frame Along With 5 Hp Charging Pump Set On Rcc Foundation And Also Providing / Fixing Of Foundation Nut Bolt Of Size 5 / 8’’ X 8’’ – 6 Nos. With Proper Leveling Complete 37 Fixing Of New Pump Set - 40 Hp With Base Frame, M.S. Pipe Along With Nrv, And Sluice Valve With All Precaution Is To Taken To Work Safely With Heavy Labor And With Arrangement Of Tools And Tackles. Job I / C Coupled The Pump & Motor With Proper Alignment, Connect The Motor To Panel Starter Etc. 38 Making / Fixing A Suction Line Of The M.S. Pipe Of Size 125 Mm Dia For The New Pump Set Of 40 Hp By Breaking The Rcc Wall Of The Tank And Brick Wall Of The Pump House For Fixing & Making A Individual Suction Line Of The New Pumps With The Help Of Concrete Breaker And Also Taking Out Malba From The Tank And Pump House Well By Manual Labour Etc. And Welding At All Joint Of The M.S Pipe With Butt Joint By Arc Welding And A Making V Groove On Both End Of Pipe And Bend Double Layer Of Arc Welding. Making / Fixing Of Flanges Welding Joint With Pipe With Double Layer Of Arc Welding Including With All Arrangement Of Gas Cutter , O2 Cylinder, Lpg Cylinder And Welding Machine. Job I / C Fixing Of S.Valve, Nrv, Bend Etc By Nut Bolt In Suction Line By The Help Of All Arrangement Of Tools & Tackles Including Safety Equipment As Per Site Requirement. 39 Making / Fixing Of Delivery Line Of The M.S. Pipe For The New Pump Set By Welding All Joint With Arc Welding With Double Layer & Making Flange Welding Joint With Pipe With Double Layer Of Arc Welding Including With All Arrangement Of Gas Cutter , O2 Cylinder, Lpg Cylinder And Welding Machine . Job I / C Fixing Of S.Valve, Nrv, Bend Etc By Nut Bolt Of Both Suction & Delivery Line By The Help Of All Arrangement Of Tools & Tackles Including Safety Equipment As Per Site Requirement. 40 A ) Making / Fixing / Laying A Header Line Of This New Pump Set And Joint With The Delivery Line Of The Pump Set. Laying And Joint This Header Line To Outer Main Delivery Line Of The Pump House :- Nby M.S. Pipe With Butt Joint By Arc Welding After Making V Groove On Both The Ends Of Pipe With Double Layer Of Arc Welding & Making Of Flange Welding Joint With Pipe With Double Layer Of Arc Welding Including Complete Arrangement Of Welding Machine And Gas Cutter. Job I / C Fixing Of S.Valve, Nrv, Bend Etc By Nut Bolt Of Both Suction & Delivery Line By The Help Of All Arrangement Of Tools & Tackles Including Safety Equipment As Per Site Requirement. Job I / C Fixing Of S.Valve, Nrv, Bend Etc By Nut Bolt Of Both Suction & Delivery Line By The Help Of All Arrangement Of Tools & Tackles Including Safety Equipment As Per Site Requirement. N 41 Fixing Of New Pump Set - 5Hp With Base Frame, G.I. Pipe Along With With All Precaution Is To Taken To Work Safely With Heavy Labor And With Arrangement Of Tools And Tackles. Job I / C Coupled The Pump & Motor With Proper Alignment, Connect The Motor To Panel Starter Etc. 42 Making / Fixing Of Suction Line Charging Pump Set Of 5 Hp Pump Of G.I Pipe Of Size 40 Mm Dia Of 5 Hp Pump Set To Pvc Storage Water Tank By Using G.I. Elbow, G.I Bend And G.I. Flange 43 Making / Fixing Of Delivery Line Of The Charging Pump Set Of 5 Hp Pump With G.I. Pipe Of Size 40 Mm Dia And Joint With 2 Nos. – 40 Hp Pump Set By Using G.I. Elbow, G.I. Tee, G.I Bend, G.I Flange. 44 Laying And Fixing Of Fr Pvc Insulated Of 16 Sq.Mm ( 3 Core ) Copper Conductor Cable For Voltage Upto 1100 V. Grade Of Following Size On Wall Surface As Required Upto 16 Sq Mm Clammed With 1Mm Thick Saddle 45 Laying And Fixing Of Fr Pvc Insulated Of 4 Sq.Mm. Copper Conductor Cable For Voltage Upto 1100 V. Grade Of Following Size On Wall Surface As Required Upto 2.5 Sq Mm Clammed With 1Mm Thick Saddle 46 Laying And Fixing Of Xple / Pvc Insulated & Pvc Sheathed ( Heavy Duty ) Armoured Aluminium Conductor Cable Of Size 95 Sq.Mm. – 3.5 Core For Voltage Upto 1100 V On Surface I / C Terminals Of Both Sides , Proper Thimbling Etc 47 A ) Lt Distribution Panel Sheet Steel Enclosure Made Out Of 2Mm Crca Sheet Totally Enclosed, Powder Coated Free Standing, Floor Mounted Type, Dust& Vermin Proof, Outward Gaskets To Provide Ip-54 Protection .The Each Part Of The Fabricated Panel Will Be Strictly Subjected To Seven Tank Treatment. The Various Components, Assemblies And Sub Equipments Of The Panel Will Be As Per Standard Given In Relevant Is. The Bus Bar Of The Panel Will Be Shaped Out Of High Conductivity, Electrolytic Conductor And Shall Be Liberal Sized In Aluminum. The Control Wiring Of The Panel Will Be Done With Pvc Flexible Copper Wires Of 1.5Mm Cross Section. Each Wire Will Be Terminating With A Ferule Crimped To The Wire, Size 1800Mm X1600x375mm. Having Following Components Of Approved Make. 48 B ) Mccb 415V, Tp 3Phase High Breaking Capacity 50Ka 50Hz, 300Amp With Spreader & Handle. Make-L&T / Siemens / Scheinder / Djb Approved Make 49 C ) Mccb 415V, Tp 3Phase High Breaking Capacity 50Ka 50Hz, 150 / 160 Amp With Spreader& Handle. Make-L&T / Siemens / Scheinder / Djb Approved Make 50 D ) Mcb Single Pole 6Amp. Make- L&T / Siemens / Scheinder / Djb Approved Make 51 E ) Mcb Triple Pole 63Amp. N Make- L&T / Siemens / Scheinder / Djb Approved N 52 F ) Mcb Triple Pole 32Amp. Nl&T / Siemens / Scheinder / Djb Approved Make N 53 G ) Pvc Insulated Copper Flexible Cable Single Core 25Sqmm. Nmake:- Icc / Cci / Universal / Grandlay / Gloster / Djb Approved N 54 H ) Power Capacitors 415V Unit Of 20Kvar .Make-Epcos / Djb Approved 55 I ) Over Load Relay 45-75. Make-L&T / Siemens / Djb Approved 56 J ) Over Load Relay 6-10 .Make-L&T / Siemens / Djb Approved 57 K ) Digital Amp. Meter. Make-L&T / Ae / Djb Approved 58 L ) Digital Volt Meter0-500V .Make-L&T / Ae / Djb Approved 59 M ) Motor Protection Relay. Make-L&T / Siemens / Djb Approved 60 N ) Power Contactor 220V 3Phase95amp. Nmake-L&T / Siemens / Djb Approved N 61 O ) Power Contactor 220V 3Phase70amp. Nmake-L&T / Siemens / Djb Approved N 62 P ) Power Contactor 220V 3Phase25amp. Nmake-L&T / Siemens / Djb Approved N 63 Q ) Star Delta Timer On Delay. Make-L&T / Siemens / Djb Approved 64 R ) Indicating Lights Led Type Ryb & On / Off. Make-L&T / Havells / Djb Approved 65 S ) Current Transformer250 / 5, 100 / 5, 30 / 5. Make-Ae / Advance / Djb Approved 66 T ) On Load Change Over Switch 200Anp. Open Execution Type. Make-L&T / Djb Approved 67 U ) Fitting Of The Above Components In Panel Enclosure With Terminal Blocks, Channels, Ferrules, Thimble, Support Insulator On Bus Bar, Required Hardwares Complete In All Respect. 68 V ) Loading , Unloading By Crane Or Heavy Labor And Cartage Up To Site Cleaning & Dressing The Surface For Installation Of The Panel At Site On Base Frame , Laying Of Cable , Termination Of Cable Both Incoming & Out Going Side. 69 W ) Testing & Commissioning Of Panel, As Per Required Parameters With Relevant Is .Testing Of The Panel Prior To Switching On As Follow Ni ) Continuity And Earth Testing Nii ) Meggaring Of All Equipment’S For Phase To Phase, Neutral To Body, Neutral To Earth And Phase To Earth. Niii ) Checking For All Tightness Of Nut And Bolts Niv ) Alignments Of Doors Etc. N V ) Interlocking Tests. All Function Tests N 70 Testing & Commissioning Of 40 Hp Pump & Motor & All E&M Equipments Etc. On No Load And Full Load Successfully With Engineer In Charge After Laying Of Cable As Site Requirement Making Connection With Thimbles, Ferrules, Inter Connection Of Panel Boards Termination Of Cable Both Incoming & Outgoing Side. Including Taking All Safety Precaution Arranging All Tools And Tackles 71 Testing & Commissioning Of 5 Hp Pump & Motor, Panel & All E&M Equipments Etc. On No Load And Full Load Successfully With Engineer In Charge After Laying Of Cable As Site Requirement Making Connection With Thimbles, Ferrules, Inter Connection Of Panel Boards Termination Of Cable Both Incoming & Outgoing Side. Including Taking All Safety Precaution Arranging All Tools And Tackles

Key Value

Document Fees
INR 500 /-
EMD
INR 42000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Supply / Installation/ Testing & Commissioning of E&M Equipment for Newly Constructed BPS at Pocket A-12 Kalkaji Extension under Tughlakabad Constituency
Sl. No. Item Description Item Code / Make Quantity Units
1 1.01 A Supply / Installation/ Testing & Commissioning of E&M Equipment for Newly Constructed BPS at Pocket A-12 Kalkaji Extension under Tughlakabad Constituency by carrying out following works:- P/O of horizontal split casing type single stage pump.\nMOC – CI ,CI impeller, CI body, S.S. Shaft & S.S. Sleeve, Suction & delivery size 125 x 100 mm suitable for head 40 mtr., capacity 180 m3 /hr.\nMake : - Wilo Matter & Platt/Kirloskar/ Jyoti/LUBI/ DJB approved\n item1 2 Nos.
2 1.02 P/O of 40 HP TEFC squirrel cage induction motor suitable for 3 phase AC, 1480 RPM. \nMake – Kirloskar / CG /ABB /DJB approved\n item2 2 Nos.
3 1.03 P/O of coupling and coupling guard for above pump set item3 2 Nos.
4 1.04 P/O of M.S. Base Frame for above pump set. item4 2 Nos.
5 1.05 P/O of 3 core FR PVC insulated of 16 sq.mm. copper conductor cable for voltage upto 1100 V. \nMake –ICC/CCI/Universal/Grandlay / Gloster /DJB approved\n item5 60 Mtrs
6 1.06 P/O of Vacuum Pump \nPump model : DV-40 With S.S Rotor, Suction & delivery size 40 x 40 mm.\nMake :- Wilo Matter & Platt/Kirloskar/DJB approved \n item6 1 No.
7 1.07 P/O of 5 HP TEFC squirrel cage induction motor suitable for 3 phase AC, 1450 RPM.\n Make – Kirloskar / CG / ABB/ DJB approved\n item7 1 No.
8 1.08 P/O of coupling and coupling guard for vaccum pump. item8 1 No.
9 1.09 P/O of M.S. Base Frame for for vaccum pump. item9 1 No.
10 1.1 P/O of 3 core FR PVC insulated of 4 sq.mm. copper conductor cable for voltage upto 1100 V.\n Make – ICC/CCI/Universal/Grandlay / Gloster /DJB approved.\n item10 30 Mtrs
11 1.11 P/O of XPLE/PVC insulated & PVC sheathed ( Heavy Duty ) Armoured Aluminium Conductor cable of size 95 sq.mm. – 3.5 Core for voltage upto 1100 V. \nMake – ICC/CCI/Universal/Grandlay / Gloster /DJB approved.\n item11 40 Mtrs
12 1.12 P/O of M.S. Pipe of size 125 mm dia length 26 mtr. of class’C’. Make – Jindal / Tata item12 26 Mtrs
13 1.13 P/O of M.S. Flange of size 125 mm dia item13 22 Nos.
14 1.14 P/O of CIDF manually operated Sluice Valve of size 125 mm dia PN 1.0. Make – Kirloskar / IVC item14 4 Nos.
15 1.15 P/O of CIDF swing type NRV of size 125 mm dia PN 1.0. Make – Kirloskar / IVC item15 4 Nos.
16 1.16 P/O of M.S. Bend of size 125 mm dia of class -C item16 6 Nos.
17 1.17 P/O of M.S. Pipe of size 200 mm dia thickness 8 mm. \nMake – Jindal / Tata\n item17 18 Mtrs
18 1.18 P/O y of M.S. Dead Flange of size 200 mm dia. item18 1 No.
19 1.19 P/O of M.S. Flange of size 200 mm dia. item19 6 Nos.
20 1.2 P/O of CIDF manually operated Sluice Valve of size 200 mm dia PN 1.0 Make – Kirloskar / IVC item20 1 No.
21 1.21 P/O of CIDF swing type NRV of size 200 mm dia PN 1.0 Make – Kirloskar / IVC item21 1 No.
22 1.22 P/O of M.S. Reducer of size 125 x 100 mm dia. item22 2 Nos.
23 1.23 P/O of M.S. Bend of size 200 mm dia of Class-C. item23 2 Nos.
24 1.24 P/O ly of G.I. Pipe of size 40 mm dia of Class-C. \nMake- Jindal / Tata\n item24 30 Mtrs
25 1.25 P/O of G.I. Flange of size 40 mm dia. Make – Unik /DJB approved item25 8 Nos.
26 1.26 P/O of G.I. Elbow of size 40mm dia. Make – Unik /DJB approved item26 8 Nos.
27 1.27 P/O of G.I. Tee of size 40 mm dia. Make - Unik /DJB approved item27 4 Nos.
28 1.28 P/O of Sant forget brass ball valve of size 40 mm dia \nPN : 25 Make :- Sant /DJB approved\n item28 4 Nos.
29 1.29 P/O /fixing of PVC Water Storage Tank Make :- Sant /DJB approved item29 500 Ltrs
30 1.3 P/O of rubber gasket of size 125 mm dia of thickness 6 mm. item30 48 Nos.
31 1.31 P/O of rubber gasket of size 200 mm dia of thickness 6 mm. item31 24 Nos.
32 1.32 P/O of good quality of nut bolt and washer. item32 100 Kg
33 1.33 B Installation Work :- Making a RCC foundation of 40 HP Pump Set of size 6’x4’x3’ of (M20) Grade Ratio 1:1:5:3 cement concrete of 40 HP Pump set as per site requirement. item33 2 Jobs
34 1.34 Making a RCC foundation of 5 HP Vaccum Pump size 4’x3’x2’ of (M20) Grade Ratio 1:1:5:3 cement concrete of 40 HP Pump set as per site requirement item34 1 Job
35 1.35 Fixing the base frame along with 40 HP pump set on RCC foundation and also providing / fixing of foundation nut bolt of size ¾’’ x 8’’ – 6 Nos. with proper leveling complete item35 2 Jobs
36 1.36 Fixing the base frame along with 5 HP charging pump set on RCC foundation and also providing/fixing of foundation nut bolt of size 5/8’’ x 8’’ – 6 Nos. with proper leveling complete item36 1 Job
37 1.37 Fixing of new pump set - 40 HP with base frame, M.S. Pipe along with NRV, and Sluice Valve with all precaution is to taken to work safely with heavy labor and with arrangement of tools and tackles. Job i/c coupled the pump & motor with proper alignment, connect the motor to panel starter etc. item37 2 Jobs
38 1.38 Making/ Fixing a suction line of the M.S. Pipe of size 125 mm dia for the new pump set of 40 HP by breaking the RCC wall of the tank and brick wall of the pump house for fixing & making a individual suction line of the new pumps with the help of concrete breaker and also taking out malba from the tank and pump house well by manual labour etc. and welding at all joint of the M.S pipe with butt joint by arc welding and a making V groove on both end of pipe and bend double layer of arc welding. Making/ Fixing of flanges welding joint with pipe with double layer of arc welding including with all arrangement of Gas Cutter , O2 cylinder, LPG Cylinder and Welding Machine. Job i/c fixing of S.Valve, NRV, Bend etc by nut bolt in suction line by the help of all arrangement of tools & tackles including safety equipment as per site requirement. item38 2 Jobs
39 1.39 Making / fixing of delivery line of the M.S. Pipe for the new pump set by welding all joint with arc welding with double layer & making flange welding joint with pipe with double layer of arc welding including with all arrangement of Gas Cutter , O2 cylinder, LPG Cylinder and Welding Machine . Job i/c fixing of S.Valve, NRV, Bend etc by nut bolt of both suction & delivery line by the help of all arrangement of tools & tackles including safety equipment as per site requirement. item39 2 Jobs
40 1.4 A) Making / fixing / laying a header line of this new pump set and joint with the delivery line of the pump set. Laying and joint this header line to outer main delivery line of the pump house :-\nBy M.S. Pipe with butt joint by arc welding after making V groove on both the ends of pipe with double layer of arc welding & making of flange welding joint with pipe with double layer of arc welding including complete arrangement of welding machine and gas cutter. Job i/c fixing of S.Valve, NRV, Bend etc by nut bolt of both suction & delivery line by the help of all arrangement of tools & tackles including safety equipment as per site requirement. Job i/c fixing of S.Valve, NRV, Bend etc by nut bolt of both suction & delivery line by the help of all arrangement of tools & tackles including safety equipment as per site requirement.\n item40 2 Jobs
41 1.41 Fixing of new pump set - 5HP with base frame, G.I. Pipe along with with all precaution is to taken to work safely with heavy labor and with arrangement of tools and tackles. Job i/c coupled the pump & motor with proper alignment, connect the motor to panel starter etc. item41 1 Job
42 1.42 Making /fixing of suction line charging pump set of 5 HP pump of G.I Pipe of size 40 mm dia of 5 HP pump set to PVC storage water tank by using G.I. Elbow, G.I Bend and G.I. flange item42 1 Job
43 1.43 Making / fixing of delivery line of the charging pump set of 5 HP pump with G.I. pipe of size 40 mm dia and joint with 2 Nos. – 40 HP pump set by using G.I. elbow, G.I. tee, G.I Bend, G.I Flange. item43 3 Jobs
44 1.44 Laying And Fixing of FR PVC insulated of 16 sq.mm( 3 core ) copper conductor cable for voltage upto 1100 V. grade of following size on wall surface as required upto 16 sq mm clammed with 1mm thick saddle item44 60 Mtrs
45 1.45 Laying And Fixing of FR PVC insulated of 4 sq.mm. copper conductor cable for voltage upto 1100 V. grade of following size on wall surface as required upto 2.5 sq mm clammed with 1mm thick saddle item45 30 Mtrs
46 1.46 Laying And Fixing of XPLE/PVC insulated & PVC sheathed ( Heavy Duty ) Armoured Aluminium Conductor cable of size 95 sq.mm. – 3.5 Core for voltage upto 1100 V on surface i/c terminals of both sides , proper thimbling etc item46 1 Job
47 1.47 a) LT Distribution panel sheet steel enclosure made out of 2mm CRCA sheet totally enclosed, powder coated free standing, floor mounted type, dust& vermin proof, outward gaskets to provide IP-54 protection .The each part of the fabricated panel will be strictly subjected to seven tank treatment. The various components, assemblies and sub equipments of the panel will be as per standard given in relevant IS. The bus bar of the panel will be shaped out of high conductivity, electrolytic conductor and shall be liberal sized in aluminum. The control wiring of the panel will be done with PVC flexible copper wires of 1.5mm cross section. Each wire will be terminating with a ferule crimped to the wire, size 1800MM x1600x375mm. Having following components of approved make. item47 1 No.
48 1.48 b) MCCB 415V, TP 3phase High breaking capacity 50KA 50Hz,300Amp with spreader & Handle. Make-L&T/Siemens/Scheinder/DJB Approved Make item48 1 No.
49 1.49 c) MCCB 415V, TP 3phase High breaking capacity 50KA 50Hz,150/160 Amp with spreader& Handle. Make-L&T/Siemens/Scheinder/DJB Approved Make item49 3 Nos.
50 1.5 d) MCB Single pole 6Amp. Make- L&T/Siemens/Scheinder/DJB Approved Make item50 11 Nos.
51 1.51 e) MCB Triple pole 63Amp. \n Make- L&T/Siemens/Scheinder/DJB Approved \n item51 1 No.
52 1.52 f) MCB Triple pole 32Amp. \nL&T/Siemens/Scheinder/DJB Approved Make\n item52 1 No.
53 1.53 g) PVC insulated copper flexible cable single core 25sqmm. \nMake:- ICC/CCI/Universal/Grandlay / Gloster /DJB approved\n item53 150 Mtrs
54 1.54 h) Power capacitors 415V unit of 20Kvar .Make-Epcos /DJB approved item54 3 Nos.
55 1.55 i) Over load relay 45-75. Make-L&T/Siemens /DJB approved item55 3 Nos.
56 1.56 j) Over load relay 6-10 .Make-L&T/Siemens /DJB approved item56 1 No.
57 1.57 k) Digital Amp. Meter. Make-L&T/AE /DJB approved item57 5 Nos.
58 1.58 l) Digital Volt Meter0-500V .Make-L&T/AE /DJB approved item58 1 No.
59 1.59 m) Motor protection Relay. Make-L&T/Siemens /DJB approved item59 3 Nos.
60 1.6 n) Power contactor 220V 3phase95Amp. \nMake-L&T/Siemens /DJB approved\n item60 6 Nos.
61 1.61 o) Power contactor 220V 3phase70Amp. \nMake-L&T/Siemens /DJB approved\n item61 3 Nos.
62 1.62 p) Power contactor 220V 3phase25Amp. \nMake-L&T/Siemens /DJB approved\n item62 1 No.
63 1.63 q) Star delta timer on delay. Make-L&T/Siemens /DJB approved item63 3 Nos.
64 1.64 r) Indicating lights LED type RYB & On/OFF. Make-L&T/Havells /DJB approved item64 11 Nos.
65 1.65 s) Current Transformer250/5, 100/5, 30/5. Make-AE/Advance /DJB approved item65 15 Nos.
66 1.66 t) On load change over switch 200Anp. Open execution type. Make-L&T /DJB approved item66 1 No.
67 1.67 u) Fitting of the above components in panel enclosure with terminal blocks, channels, ferrules, thimble, support insulator on bus bar, required hardwares complete in all respect. item67 1 Job
68 1.68 v) Loading ,unloading by crane or heavy labor and cartage up to site cleaning & dressing the surface for Installation of the panel at site on base frame ,laying of cable ,termination of cable both incoming & out going side. item68 1 Job
69 1.69 w) Testing & commissioning of panel, as per required parameters with relevant IS .testing of the panel prior to switching on as follow \ni) Continuity and earth testing \nii) Meggaring of all equipment’s for phase to phase, neutral to body, neutral to earth and phase to earth. \niii) checking for all tightness of nut and bolts \niv) Alignments of doors etc. \n v) Interlocking tests. All function tests\n item69 1 Job
70 1.7 Testing & Commissioning of 40 HP Pump & Motor & all E&M equipments etc. on No Load and full load successfully with engineer in charge after laying of cable as site requirement making connection with thimbles, ferrules, inter connection of panel boards termination of cable both incoming & outgoing side. Including taking all safety precaution arranging all tools and tackles item70 2 Jobs
71 1.71 Testing & Commissioning of 5 HP Pump & Motor, Panel & all E&M equipments etc. on No Load and full load successfully with engineer in charge after laying of cable as site requirement making connection with thimbles, ferrules, inter connection of panel boards termination of cable both incoming & outgoing side. Including taking all safety precaution arranging all tools and tackles item71 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail