| 1 | 1 | Scheme I-Repair to foot slab | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | 60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | BI01010001010000000000000515BI0100001114 | 10.5 | metre |
|---|
| 3 | 1.02 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | BI01010001010000000000000515BI0100001115 | 70 | hour |
|---|
| 4 | 1.03 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001116 | 14.102 | cum |
|---|
| 5 | 1.04 | 15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | BI01010001010000000000000515BI0100001117 | 1.194 | cum |
|---|
| 6 | 1.05 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001118 | 174.951 | cum |
|---|
| 7 | 1.06 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001119 | 9.576 | cum |
|---|
| 8 | 1.07 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001120 | 3.99 | sqm |
|---|
| 9 | 2 | Scheme II Repair of VCB Apron,Pier&Foot slab | BI01010001010000000000000515BI0100001121 | | |
|---|
| 10 | 2.01 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001122 | 17.251 | cum |
|---|
| 11 | 2.02 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001123 | 22.5 | sqm |
|---|
| 12 | 2.03 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | BI01010001010000000000000515BI0100001124 | 1.197 | cum |
|---|
| 13 | 2.04 | 5.22.3 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars | BI01010001010000000000000515BI0100001125 | 69.432 | kilogram |
|---|
| 14 | 2.05 | 4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | BI01010001010000000000000515BI0100001126 | 6.735 | sqm |
|---|
| 15 | 3 | Scheme III Repair to VCB Beams | BI01010001010000000000000515BI0100001127 | | |
|---|
| 16 | 3.01 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | BI01010001010000000000000515BI0100001128 | 0.924 | cum |
|---|
| 17 | 3.02 | 5.22.3 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars | BI01010001010000000000000515BI0100001129 | 131.964 | kilogram |
|---|
| 18 | 3.03 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001130 | 13.86 | sqm |
|---|
| 19 | 3.04 | 13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | BI01010001010000000000000515BI0100001131 | 131.301 | sqm |
|---|
| 20 | 4 | Scheme IV- Replacing of damaged wooden shutters&Repairing damaged Loose aprons | BI01010001010000000000000515BI0100001132 | | |
|---|
| 21 | 4.01 | 60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete | BI01010001010000000000000515BI0100001133 | 64.65 | 10 cud m |
|---|
| 22 | 4.02 | 13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | BI01010001010000000000000515BI0100001134 | 32.58 | sqm |
|---|
| 23 | 4.03 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001135 | 15.75 | cum |
|---|
| 24 | 4.04 | 60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | BI01010001010000000000000515BI0100001136 | 15.75 | cum |
|---|
| 25 | 5 | SchemeV- Reparing Side wall U/S Left | BI01010001010000000000000515BI0100001137 | | |
|---|
| 26 | 5.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001138 | 15 | cum |
|---|
| 27 | 5.02 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001139 | 52.5 | cum |
|---|
| 28 | 5.03 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001140 | 0.938 | cum |
|---|
| 29 | 5.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001141 | 3.825 | sqm |
|---|
| 30 | 6 | SchemeVI- Reparing Side wall U/S Right | BI01010001010000000000000515BI0100001142 | | |
|---|
| 31 | 6.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001143 | 15 | cum |
|---|
| 32 | 6.02 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001144 | 52.5 | cum |
|---|
| 33 | 6.03 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001145 | 0.938 | cum |
|---|
| 34 | 6.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001146 | 3.825 | sqm |
|---|
| 35 | 7 | SchemeVII- Reparing Side wall D/S Right | BI01010001010000000000000515BI0100001147 | | |
|---|
| 36 | 7.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001148 | 15 | cum |
|---|
| 37 | 7.02 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001149 | 52.5 | cum |
|---|
| 38 | 7.03 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001150 | 0.938 | cum |
|---|
| 39 | 7.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001151 | 3.825 | sqm |
|---|
| 40 | 8 | SchemeVIII- Reparing Side wall D/S Left | BI01010001010000000000000515BI0100001152 | | |
|---|
| 41 | 8.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | BI01010001010000000000000515BI0100001153 | 15 | cum |
|---|
| 42 | 8.02 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001154 | 52.5 | cum |
|---|
| 43 | 8.03 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001155 | 0.938 | cum |
|---|
| 44 | 8.04 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | BI01010001010000000000000515BI0100001156 | 3.825 | sqm |
|---|