| 1 | 1 | Jungle clearance including labour charges lead, lift etc complete | BI01010001010000000000000515BI0100001116 | 2500 | M² |
|---|
| 2 | 2 | Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts, patch painting, cutting of angles wherever necessary, final checking, cost of T & P, all leads and lifts etc., complete.(Under LC condition) | BI01010001010000000000000515BI0100001116 | 178.5 | MT |
|---|
| 3 | 3 | Tack welding of bolts and nuts in towers using diesel generator sets and applying zinc chromate paint including cost of all materials, lead and hire charges etc., complete. | BI01010001010000000000000515BI0100001116 | 20700 | Nos. |
|---|
| 4 | 4 | Hoisting of 7 units of single suspension insulator strings including transport from Central stores ,labour etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001116 | 78 | Sets |
|---|
| 5 | 5 | Hoisting of 8 units of single tension insulator strings and transport from Central stores, labour etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001117 | 48 | Set |
|---|
| 6 | 6 | Paying out, jointing, rough sagging, tensioning of 3 Nos. ACSR Panther conductors including clipping, providing SB dampers and jumpering in tension points and PA rods in suspension points, transport of all materials from stores to site , all labour, leads and lifts etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001112 | | |
|---|
| 7 | 6.01 | For KM Length | BI01010001010000000000000515BI0100001117 | 13.41 | Kms |
|---|
| 8 | 7 | Transport and Paying out, and stringing of 1No GI earth wire 7/3.55mm including clipping, jumping etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001112 | | |
|---|
| 9 | 7.01 | Stringing of 1 No. G.I earth wire for KM | BI01010001010000000000000515BI0100001116 | 13.41 | Kms |
|---|
| 10 | 8 | Providing Trussels wherever necessary for BT Road crossing etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001116 | 7 | Nos. |
|---|
| 11 | 9 | Providing Temproary guys whenever necessary lead, lift, etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001117 | 20 | Loc |
|---|
| 12 | 10 | Labour for lowering of LT/HT line and restringing the same after completion if work etc., complete. (Under LC condition) | BI01010001010000000000000515BI0100001116 | 28 | Nos. |
|---|
| 13 | 11 | Supply and Fixing of Danger board | BI01010001010000000000000515BI0100001116 | 43 | Nos |
|---|
| 14 | 12 | Supply and Fixing of phase plate (Set of three) | BI01010001010000000000000515BI0100001117 | 43 | Nos |
|---|
| 15 | 13 | Supply and Fixing of Number plates | BI01010001010000000000000515BI0100001116 | 43 | Nos |
|---|
| 16 | 14 | Supplying and fixing of Name board of size 0.75m x 0.30m in 18 SWG MS plate, painting, writing Name as directed by Engineer at site. | BI01010001010000000000000515BI0100001117 | 7 | Nos |
|---|
| 17 | 15 | Tree cutting including labour charges lead, lift etc complete | BI01010001010000000000000515BI0100001112 | | |
|---|
| 18 | 15.01 | Big trees | BI01010001010000000000000515BI0100001116 | 75 | Nos |
|---|
| 19 | 15.02 | small tress | BI01010001010000000000000515BI0100001117 | 150 | Nos |
|---|
| 20 | 16 | Supply and fixing of ST fitting for Panther | BI01010001010000000000000515BI0100001117 | 48 | Sets |
|---|
| 21 | 17 | Supply and fixing of SS fitting for Panther | BI01010001010000000000000515BI0100001117 | 78 | Sets |
|---|
| 22 | 18 | Supply and fixing of vibration Damper for Panther | BI01010001010000000000000515BI0100001117 | 48 | Sets |
|---|
| 23 | 19 | Supply and fixing of Tension fittings for EW 7/3.55mm | BI01010001010000000000000515BI0100001117 | 32 | Sets |
|---|
| 24 | 20 | Supply and fixing of Suspension fittings for EW 7/3.55mm | BI01010001010000000000000515BI0100001116 | 26 | Nos |
|---|
| 25 | 21 | Supply and fixing of Aluminium Earth bond | BI01010001010000000000000515BI0100001117 | 58 | Nos |
|---|
| 26 | 22 | Supply and fixing of Mid span joint for panther | BI01010001010000000000000515BI0100001117 | 30 | Sets |
|---|
| 27 | 23 | Supply and fixing of Repair sleeve for panther | BI01010001010000000000000515BI0100001116 | 40 | Sets |
|---|
| 28 | 24 | Supply and fixing of Mid span joint for Earthwire | BI01010001010000000000000515BI0100001116 | 12 | Sets |
|---|
| 29 | 25 | CREDIT VALUE\nDismantling the existing 110 KV line [As is where is condition] consisting of various type of tower (Approximately) G.I/M.S.tower angle scrap - 80.282 MT, Leopard conductor Scrap - 19.87 MT, G.I.Earth wire scrap - 7.31 MT, GI scrap 90 KN Disc Insulator - 3.42 MT, GI scrap 120 KN Disc Insulator - 0.42 MT) including cost of dismantling charges(Under LC condition) clearing from the site on cost to paid to TANTRANSCO The quoted amount shall not be less than the board fixed minimum bid amount of Rs.21,26,425/- | BI01010001010000000000000515BI0100001117 | 1 | Lot |
|---|