| 1 | 1 | Flooring with approved vitrified of non slippery type tiles over cement mortor 1:3 20mm thick including pointing with white cement and finishing the joints flush pointing the surface etc ., complete. | item1 | 11.52 | m2 |
|---|
| 2 | 2 | Flooring with good quality ceramic tiles of size 305x305x6mm of approved colour, shade and quality laid in CM 1:3, 20mm thick including cutting the tiles to the required size wherever necessary,laying in position and pointing with white cement mixed with colour pigments including cost of all materials, labour, lead & lift etc., complete. | item2 | 4.49 | m2 |
|---|
| 3 | 3 | Supplying and providing wall Dadooing with coloured glazed tiles of best approved quality of make johnson, regency etc., over CM 1:2, 12mm thick and pointing with the same colour cement including cost of all materials, labour, lead, lift, etc., complete. | item3 | 7.13 | m2 |
|---|
| 4 | 4 | Replacing the damaged water closet and Supplying and fixing in position Indian water closet(Oriya Type) of approved quality ,colour with all accesories including cost of all materials, labour, lead,lift etc., complete. | item4 | 1 | No. |
|---|
| 5 | 5 | Supplying and laying 110 mm dia 6 Kg/cm2 PVC pipe of ISI make for laying the sewer line including cost of PVC pipe with necessary specials as required ,labour for cutting, laying, fixing etc including refilling the trench with excavated earth etc complete. | item5 | 6 | Rm |
|---|
| 6 | 6 | Providing inspection chamber for sufficient intervels throughout the sewer line to a depth required for maintaining proper gradient of the sewerline including earthwork excavation, PCC 1:3:6, B.W in CM 1:5 and plastering with CM 1:3, 12mm tk with suitable Manhole cover at top including cost of all labour, lead, lift etc.complete. | item6 | 1 | No |
|---|
| 7 | 7 | Supplying and Fixing of wash basin in position of approved quality (Colour) including of all accesories including cost of all materials, labour, lead, lift, etc., complete. | item7 | 2 | Nos |
|---|
| 8 | 8 | Earth work excavation in hard gravelly soil with an initial lead of 10 m and lift of 2 m etc.for foundation | item8 | 12.98 | m3 |
|---|
| 9 | 9 | Supply and filling the septic tank , soak pit with river sand including watering consolidation etc., complete. | item9 | 1.06 | m3 |
|---|
| 10 | 10 | Supply and filling the soak pit with 40 mm HB metal including consolidation etc., complete. | item10 | 0.65 | m3 |
|---|
| 11 | 11 | RCC 1:1.5:3 using 20mm HB stone with form work for precast RCC circular trough for septic tank and soak pit including cost of cement, all materials lead and lifts etc., complete. | item11 | 0.89 | m3 |
|---|
| 12 | 12 | Painting two coats with Ready mixed paint over old wood work for the existing window including cleaning preparing the surfaces, cost of all labour, lead, lift etc., complete. | item12 | 13.2 | m2 |
|---|
| 13 | 13 | Painting two coats with Ready mixed paint over old Grill work for the existing window including cleaning preparing the surfaces, cost of all labour, lead, lift etc., complete. | item13 | 13.2 | m2 |
|---|
| 14 | 14 | Through Scrapping of old Plastered surface,including labour,materials, lead, lift, etc.,complete. | item14 | 539.15 | m2 |
|---|
| 15 | 15 | White washing two coats using white cement including cost of all materials, labour, brushes, lead, lift,scaffolding charges, etc., complete. | item15 | 88.26 | m2 |
|---|
| 16 | 16 | Painting the inside walls with two coats of best quality Acrylic Distemper of approved colour over a interior primer coat of all materials, etc., complete. | item16 | 321.16 | m2 |
|---|
| 17 | 17 | Painting the outside walls with two coats of exterior emulsion over a emulsion primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete. | item17 | 206.27 | m2 |
|---|
| 18 | 18 | Fabrication, supply and fixing of MS steel door using required angles, flats and square bars including cost of all necessary fittings,painting with two coats of enamel paint, cost of all materials, labour, lead, lift etc., complete as instructed by the Engineer. | item18 | 120 | Kg |
|---|
| 19 | 19 | Providing PVC door of suitable size as instructed by the Engineer at site including cost of all materials, labour, hinges and other furniture fittings , lead, lift etc., complete. | item19 | 1.58 | m2 |
|---|
| 20 | 20 | Replacing of damaged door wood with new CW planks of 30 cm wide with 25 mm thick should be fixed in position suitably as instructed by the field engineer at site incluing cost of all labour, lead, lift etc., complete. | item20 | 16 | m2 |
|---|
| 21 | 21 | Supplying, fixing and laying of PVC pipe 10 Kg/cm2 for water supply arrangement including cost of all materials, labour, lead, lift etc complete. | | | |
|---|
| 22 | 21.1 | 40 mm | item21 | 60 | Rmt |
|---|
| 23 | 21.2 | 32 mm | item22 | 60 | Rmt |
|---|
| 24 | 22 | Supplying and fixing of PVC screw down tap including cost of all materials, labour lead, lift, etc., complete. | item23 | 6 | Nos |
|---|
| 25 | 23 | Supply & fixing of GM gate valve including cost of all materials, all labour, lead, lift etc., complete. | | | |
|---|
| 26 | 23.1 | 40 mm | item24 | 1 | No |
|---|
| 27 | 23.2 | 32 mm | item25 | 1 | No |
|---|
| 28 | 24 | Supplying and fixing Colour lipped Mouth Porcelin flat back urinals with all accessories such as 32mm dia Bell mouth PVC connection,15mm dia G.M. wheel valve, 15mm dia 'B' Class G.I.waste water pipe, 15mm dia nylon connection, 15mm dia brass nipple etc.,as directed by the Enginner in charge including cost of all materials,labour,lead, lift, etc., complete. | item26 | 3 | Nos |
|---|
| 29 | 25 | Fabrication, supply and fixing of MS steel gate using required angles, flats and square bars including cost of all necessary fittings,painting with two coats of enamel paint, cost of all materials, labour, lead, lift etc., complete as instructed by the Engineer. | item27 | 120 | Kg |
|---|