Replacement / Repair Of Damaged Conveyor Belt And Replacement Of Motor / Gear Boxes At Q10 Site W . Island , Fact - Cd . , AMBALAMEDU-Kerala

Fertilisers And Chemicals Travancore Limited has published Replacement / Repair Of Damaged Conveyor Belt And Replacement Of Motor / Gear Boxes At Q10 Site W . Island , Fact - Cd . . Submission Date for this Tender is 14-08-2019. Clamps Tenders in AMBALAMEDU Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

21222344
Replacement / Repair Of Damaged Conveyor Belt And Replacement Of Motor / Gear Boxes At Q10 Site W . Island , Fact - Cd .
Open Tender
Indian
Kerala
AMBALAMEDU
14-08-2019

Tender Details

Replacement / Repair Of Damaged Conveyor Belt And Replacement Of Motor / Gear Boxes At Q10 Site W . Island , Fact - Cd . , Replacement / Repair Of Damaged Conveyor Belt And Replacement Of Motor / Gear Boxes At Q10 Site W . Island , Fact - Cd . , Replacement Of Conveyor Belts At Q-10 Berth W . Island . The Works Involves Decoupling The Drive Of Conveyor Belt To Be Replaced . Removing The Old / Damaged / Dislocated Conveyor Belt By Pulling , After Providing Clamp , Lifting & Arresting The Gravity Assembly . Place / Position The New / Reusable Dislocated Belt . Tighten Well With The Help Of Chain Block Attaching To Clamp . After Tightening Arrest The Belt By Providing Clamps . Make Arrangements For Splicing Of Joint , Like Removing Necessary Idler Frames , Providing Flat Plywood Piece / Any Flat Solid Sheet Under The Belt For Splicing And Joining The Belt . After Splicing And Getting Clearance Remove Clamps , Fix Back The Idler Frames , Remove Plywood Sheets , Release Gravity Assembly , Couple The Drive . Correct The Belt Sways While Taking Trial Run . Scrap Belts To Be Cut And Rolled Into Small Bundles As Per Instruction Remove Scrap Belts To Q-10 Scrap Yard . The Length Of Conveyor Belt Varies From 5Mtrs To 400 Mtrs . Belt Width Varies From 750Mm To 1200Mm . , Making Arrangements For New Splicing Joints . Lifting & Arresting The Gravity Assembly , Tighten The Belt To Get Slack Length , Cut And Remove The Damaged Portion , Arrest The Belt By Providing Clamps , Add Additional Quantity Of Belt If Required Up To 10Mtrs , Make Arrangements For Splicing Of Joint , Like Removing Necessary Idler Frames , Providing Flat Plywood Piece / Any Flat Solid Sheet Under The Belt For Splicing And Joining The Belt On A Flat Surface . After Splicing And Getting Clearance Remove Clamps , Fix Back The Idler Frames , Remove Plywood Sheets , Release Gravity Assembly , Couple The Drive . Correct The Belt Sways While Taking Trial Run . Scrap Belts To Be Cut And Rolled Into Small Bundles As Per Instruction . Remove Scrap Belts To Q-10 Scrap Yard . The Length Of Conveyor Belt Varies From 5Mtrs To 400 Mtrs . Belt Width Varies From 750Mm To 1200Mm . ( Splicing And Joining Work Of Conveyor Belt Will Be Arranged By The Department Separately ) , Replacement Of Motor For The Conveyors Of S1 , S2 , S3 & P4 At Q-10 Site . Work Involves: Collection Of Tools And Tackles , Transport The Same To Site , Arrangements Of Lifting And Lowering The Motor . Loosening The Foundation Bolts , And Decoupling . Lowering The Motor From Position To Ground . Transport To Electrical W/S . Assistance For Dismantling And Fixing The Coupling , Transport The New / Serviced Motor To Site . Lifting And Positioning The Motor To Its Foundation . Assistance For Alignment And Coupling . After The Work Removing The Lifting , Lowering Arrangement . , Replacement Of Gearbox / Motor For The Conveyors P3a , P3b , P6 , P5a , P5b At Q-10 Site . Work Involves: Collection Of Tools And Tackles , Transport The Same To Site , Arrangements For Lifting And Lowering The Gear Box / Motor . Dismantle The Gearbox / Motor From The Foundation After Loosening The Foundation Bolts , And Decoupling . Lowering The Gearbox / Motor From Position To Ground . Transport To Mechanical / Electrical W/S . Assistance For Dismantling And Fixing The Coupling , Transport The New / Serviced Gearbox / Motor To Site . Lifting And Positioning The Gearbox / Motor To Its Foundation . Assistance For Alignment And Coupling . , Replacement Of Gear Box For The Conveyors S1 , S2 , S3 & P4 At Q-10 Site . Work Involves: Collection Of Tools And Tackles , Transport The Same To Site , Arrangements For Lifting And Lowering The Gear Box . Loosening The Foundation Bolts , And Decoupling . Lower The Gearbox From Position To Ground . Transport To Mechanical W/S . Assistance For Dismantling And Fixing The Coupling , Transport The New / Serviced Gear Box To Site . Lifting And Positioning The Gearbox To Its Foundation . Assistance For Alignment And Coupling . After The Work Dismantling The Lifting , Lowering Arrangements And Transport To Required Location . Finally Site Cleaning .

Key Value

Document Fees
Refer document
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item Description Service Code Quantity Units
1 1 Replacement / repair of damaged conveyor belt and replacement of Motor / gear boxes at Q10 site W. Island, FACT - CD.
2 1.01 Replacement of Conveyor Belts at Q-10 Berth W.Island.\nThe Works Involves decoupling the drive of conveyor belt to be replaced. Removing the Old / Damaged / Dislocated conveyor belt by pulling, after providing clamp, lifting & arresting the gravity assembly. Place / position the new / reusable dislocated belt. Tighten well with the help of chain block attaching to clamp. After tightening arrest the belt by providing clamps. Make arrangements for splicing of joint , like removing necessary idler frames , providing flat plywood piece / any flat solid sheet under the belt for splicing and joining the belt. After splicing and getting clearance remove clamps, fix back the idler frames, remove plywood sheets, release gravity assembly, couple the drive. Correct the belt sways while taking trial run. Scrap belts to be cut and rolled into small bundles as per instruction Remove scrap belts to Q-10 Scrap yard. The length of conveyor belt varies from 5Mtrs to 400 Mtrs. Belt width varies from 750mm to 1200mm. CD-M-WICONV-BELT06 1800 M
3 1.02 Making arrangements for new splicing Joints.\nLifting & arresting the gravity assembly, tighten the belt to get slack length, cut and remove the damaged portion, arrest the belt by providing clamps, add additional quantity of belt if required up to 10mtrs, make arrangements for splicing of joint, like removing necessary idler frames, providing flat plywood piece / any flat solid sheet under the belt for splicing and joining the belt on a flat surface. After splicing and getting clearance remove clamps, fix back the idler frames, remove plywood sheets, release gravity assembly, couple the drive. Correct the belt sways while taking trial run. Scrap belts to be cut and rolled into small bundles as per instruction. Remove scrap belts to Q-10 Scrap yard. The length of conveyor belt varies from 5Mtrs to 400 Mtrs. Belt width varies from 750mm to 1200mm. (Splicing and joining work of conveyor belt will be arranged by the department separately) CD-M-WICONV-BELT07 20 NO
4 1.03 Replacement of Motor for the conveyors of S1, S2, S3 & P4 at Q-10 site.\nWork involves: Collection of tools and tackles, transport the same to site, arrangements of lifting and lowering the Motor. Loosening the foundation bolts, and decoupling. Lowering the Motor from position to ground. Transport to Electrical W/S. Assistance for dismantling and fixing the coupling, transport the New / Serviced Motor to site. Lifting and positioning the Motor to its foundation. Assistance for alignment and coupling. After the work removing the lifting, lowering arrangement. CD-M-WICONV-BELT08 3 NO
5 1.04 Replacement of Gearbox / Motor for the Conveyors P3A, P3B, P6, P5A, P5B at Q-10 site.\nWork involves: Collection of tools and tackles, transport the same to site, arrangements for lifting and lowering the Gear Box / Motor. Dismantle the gearbox / Motor from the foundation after loosening the foundation bolts, and decoupling. Lowering the gearbox / Motor from position to ground. Transport to Mechanical / Electrical W/S. Assistance for dismantling and fixing the coupling, transport the New / Serviced gearbox / Motor to site. Lifting and positioning the gearbox / Motor to its foundation. Assistance for alignment and coupling. CD-M-WICONV-BELT09 10 NO
6 1.05 Replacement of Gear box for the conveyors S1, S2, S3 & P4 at Q-10 site. Work involves: Collection of tools and tackles, transport the same to site, arrangements for lifting and lowering the Gear Box. Loosening the foundation bolts, and decoupling. Lower the gearbox from position to ground. Transport to Mechanical W/S. Assistance for dismantling and fixing the coupling, transport the New / Serviced Gear Box to site. Lifting and positioning the gearbox to its foundation. Assistance for alignment and coupling. After the work dismantling the lifting, lowering arrangements and transport to required location. Finally site cleaning. CD-M-WICONV-BELT10 2 NO
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail