1. House Keeping Of Plant Area Phi Cleaning Of Ewc / Iwc, Floor Tiles, Dadooing In Administrative Building And Other Phasei Buildings In Plant Area Daily Including Cost Of Cleaning Materials Such As Toilet Brush, Phenol, Bleaching Powder, Acid, Naphthalene Balls, Labour, Lead, Including Cost Of All Consumables, All T & Ps Etc Complete As Directed By The Engineer At Site. 2 Cleaning Of Urinals, Floor Tiles, Dadooing In Administrative Building And Other PhaseI Buildings In Plant Area Daily Including Cost Of Cleaning Materials Such As Toilet Brush, Phenol, Bleaching Powder, Naphthalene Balls, Labour, Lead, Including Cost Of All Consumables, All T & Ps Etc Complete As Directed By The Engineer At Site. 3 Cleaning Of Wash Basin In Plant Area Of PhaseI Daily Including Cost Of Cleaning Materials Such As Toilet Brush, Phenol, Bleaching Powder, Naphthalene Balls, Labour, Lead Including Cost Of All Consumables, All T& Ps Etc., Complete As Directed By The Engineer At Site. 4 Cleaning Of Open Drain / Storm Water Drain Pipe Culvert Etc., To Ensure Free Flow Of Water In PhaseI Plant Area Including Cost Of All Cleaning Materials, Labour, Lead & Lift Etc., Complete And Disposal Of The Waste Collected Including Cost Of All Consumables, All T& Ps Etc Complete As Directed By The Engineer At Site Sweeping And Cleaning Of Phasei Office Buildings Floors, Cleaning Of Glass Partition And Windows, Cleaning Of Dust Bins, Cleaning Of Food Waste, Cleaning Of Garbage, Cleaning Of Other Waste Accumulated Inside Office Premises Etc., Providing Of Drinking Water In All Offices Including Cost Of All Materials Such As Plastic Pot, Tumbler, Broom Stick, Glass Cleaner, Cleaning Powder, Labour, Lead & Lift Including Cost Of All Consumables, All T& Ps Etc Complete ( Daily ) As Directed By The Engineer At Site