1 Earth Work Excavating And Depositing On Bank With Initial Lead Of 10M & Initial Lift Of 2M Earth Work Excavating And Depositing On Bank With Initial Lead Of 10M & Initial Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney, Earth And Earth Mixed With Small Size Boulders Including Cost Of All Materials, Leads, Lifts, Etc., Complete. 2 Providing And Placing Pcc Grade M10 Using 20Mm To 40Mm Downgraded Hbg Providing And Placing Pcc Grade M10 Using 20Mm To 40Mm Downgraded Hbg Metal With Minimum Cement Content Of 200Kg / M3 Including Cost Of All Materials, Labour Charges, Curing, All T & P, Lead, Lift Etc., Complete. 3 Providing And Placing Rcc Grade M20 Using 12Mm To 20Mm Downgraded Hbg Providing And Placing Rcc Grade M20 Using 12Mm To 20Mm Downgraded Hbg Metal With Minimum Cement Content Of 315Kg / M3 For Raft Concrete Including Cost Of Form Work, Shuttering, Cost Of All Materials, Labour Charges, Vibrating The Concrete, Curing, All T & P, Lead, Lift Etc., Complete But Excluding Cost Of Steel Reinforcement. 4 Supplying And Placing Reinforcement Of Rts Rods Supplying And Placing Reinforcement Of Rts Rods Including Cost Of Steel, Binding Wire, Cutting, Bending, Tying With All Lead, Lift Etc., Complete. 5 Providing And Placing Pcc Grade M15 Using 20Mm Downgraded Hbg Metal Providing And Placing Pcc Grade M15 Using 20Mm Downgraded Hbg Metal For Retaining Wall Including Cost Of All Materials, Shuttering Charges, Labour Charges Curing, All T & P, Lead, Lift Etc., Complete. 6 Forming Vertical Joint In The Retaining Wall Construction With Premoulded Mastic Pad Forming Vertical Joint In The Retaining Wall Construction With Premoulded Mastic Pad 7 Supplying And Fixing In Position Of Pvc 110 Mm Dia 6 Kgs / Cm2 Supplying And Fixing In Position Of Pvc 110 Mm Dia 6 Kgs / Cm2 For Providing Weep Holes In The Retaining Wall Including Cost Of All Materials, Lead, Lift, Labour Etc., Complete.