Supply Of Earth Work Exavating And Depositing On Bank With Initial Lead Of 10M & Lift Of 2M In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Including Cost Of All Materials, Leads, Lifts Etc., Complete.,Providing And Placing Pcc Grade M10 Using 20Mm To 40Mm Downgraded Hbg Metal With Minimum Cement Content Of 200Kg/M3 Including Cost Of All Materials, Labour Charges, Curing, All T&P, Lead, Lift Etc., Complete., Providing And Placing R.C.C. Grade M20 Using 12Mm To 20Mm Downgraded Hbg Metal With Minimum Cement Content Of 315Kg/M3 For Raft Concrete Including Cost Of Form Work, Shuttering, Cost Of All Materials, Labour Charges, Vibrating The Concrete, Curing, All T&P, Lead, Lift Etc., Complete But Excluding Cost Of Steel Reinforcement., Supplying And Placing Reinforcement Of Ms/Rts Rods Including Cost Of Steel, Binding Wire, Cutting, Bending, Tying Including All Lead, Lift, Etc., Complete. , Providing And Placing Pcc Grade M15 Using 20Mm Downgraded Hbg Metal With Minimum Cement Content Of 240Kg/M3 For Retaining Wall Including Cost Of All Materials, Shuttering Charges, Labour Charges, Curing, All T&P, Lead, Lift Etc., Complete., Forming Vertical Joint In The Retaining Wall Construction With Premoulded Mastic Pad Of 25Mm Thick To Full Depth And Cross Section Of Retaining Wall As Per Specification And Drawing Including Cost Of All Materials, Lead, Lift, Labour Etc., Complete., Supplying And Fixing In Position Of Pvc 110Mm Dia @ 6Kg/Cm2 For Providing Weep Holes In The Retaining Wall Incluing Cost Of All Materials, Lead, Lift, Labour, Etc., Complete.