| FileName | File Description | File Size | Download |
| 1. comm Terms and conditions R2combined .pdf | Tender Documents | 0 KB | Download |
| 2. Safety Bond final.pdf | Tender Documents | 0 KB | Download |
| 3. 420 kV 50 63 80 and 125 MVAr Shunt Reactor NGR SA R7 Jun22.pdf | Tender Documents | 0 KB | Download |
| 3694d74eef7c4eadba6b9f87851f75d5.html | Tender Documents | 0 KB | Download |
| 4.ScheduleA E3091 765 kV class 80 MVAr Reactor 27.02.2026.pdf | Tender Documents | 0 KB | Download |
| Ammendment for TTR validity 26.02.2026.pdf | Tender Documents | 0 KB | Download |
| AnnexureA Maximum Permissible losses and Penalty.pdf | Tender Documents | 0 KB | Download |
| AnnexureB ERECTION OF TRANSFORMER AND REACTOR Final.pdf | Tender Documents | 0 KB | Download |
| Format for Authorised representative declaration.pdf | Tender Documents | 0 KB | Download |
| Format for Purchase Agreement.pdf | Tender Documents | 0 KB | Download |
| GETCO 765 KV 80 and 100 MVAR 01 PH SHUNT REACTOR NGR SA.pdf | Tender Documents | 0 KB | Download |
| Land Boarder Certificate A1 .pdf | Tender Documents | 0 KB | Download |
| Land Boarder Certificate A2.pdf | Tender Documents | 0 KB | Download |
| 00. Amendment EHV TRF Reactor March25.pdf | Tender Documents | 0 KB | Download |
| 1. ALL BG Format 11.03.24.pdf | Tender Documents | 0 KB | Download |
| Sl. No. | Item Name |
| 1 | 765/√3 kv, 80 mvar, 1 phase shunt reactor along with all fittings and accessories(excluding transformer mineral oil).the type of bushing shall be –800 kv hv bushing - oip/rip/ris with porcelain/polymer housing145 kv neutral bushing - rip/ris with polymer housing |
| 2 | Erection, testing and commissioning of item 1(a) |
| 3 | supply of Transformer Mineral Oil for above Reactors |
| 4 | Erection, testing and commissioning of item 2(a) |
| 5 | supply of On Line 3 key Gases Monitoring Device (Small 03 gas DGA) for transformer |
| 6 | Erection, testing and commissioning of item 3(a) |
| 7 | Supply of Neutral CT (Outdoor type) along with support structure and suitable terminal connectors |
| 8 | Erection, testing and commissioning of item 4(a) |
| 9 | Supply Nitrogen Injection System for protection against the fire & explosion for transformer (NIFPS) |
| 10 | Erection, testing and commissioning of item 5(a) |
| 11 | Oil storage tank -20KL- as per technical specification. |
| 12 | Oil sampling bottle along with oil syringe |
| 13 | Air Core Neutral Grounding Reactor (NGR) with support structure and insulators along with terminal connectors |
| 14 | erection testing and commissioning of item no.8(a) |
| 15 | 145 kV Surge Arrestor along with support structure & terminal connectors |
| 16 | Erection, testing and commissioning of item 9(a) |
| 17 | Spare Oil (10 percentage of total oil quantity for the Reactor units as specified in Technical Specification) |
| 18 | Spare Bushing for HV (800kV) |
| 19 | Spare Bushing for Neutral (145 kV) |
| 20 | Spare Neutral CT (Outdoor type) |
| 21 | Spare Terminal connectors for HV, Neutral Bushings, Outdoor Neutral CT and Surge Arrester |
| 22 | Spare 145 kV Surge Arrester |
| 23 | Spare Valves as per valve schedule(One No. each) |
| 24 | 420kV, 125 MVAR, 3 phase Shunt Reactor along with all fittings and accessories (Excluding Transformer Mineral Oil).The type of Bushing shall be –420kV HV Bushing - RIP/RIS with polymer housing145kV Neutral Bushing – RIP/RIS with polymer housing |
| 25 | Erection, testing and commissioning of item 17(a) |
| 26 | supply of Reactor Mineral Oil for above Reactor |
| 27 | Erection, testing and commissioning of item no.18(a) |
| 28 | On Line 3 key Gases Monitoring Device (Small 03 gas DGA) for Reactor |
| 29 | Erection, testing and commissioning of item no.19(a) |
| 30 | Nitrogen Injection System for protection against the fire & explosion for transformer (NIFPS) |
| 31 | Erection, testing and commissioning of item no.20(a) |
| 32 | Spare Oil (10 percentage of total oil quantity for the Reactor units as specified in Technical Specification) |
| 33 | Spare Bushing for HV (420kV) |
| 34 | Spare Bushing for Neutral (145 kV) |
| 35 | Spare Terminal connectors for HV, Neutral Bushings |
| 36 | Spare Valves as per valve schedule(One No. each) |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail