BRR : 9965072
Tender Brief : Tender for Earth Work In Ordinary Soil In All Of Foundation Trenches Including Dressing Of The Side And Ramming Of Bottom Lifts Upto 1.5M Including Getting Out The Excavated Soil And Disposal Of Surplus Excavatd Soil As Directed Within A Lead Of 50 M Ar/Gnida(Aor-Sr. No 6 Item Code. 2.8.1) , Providing And Laying In Position Cement Concrete With 4Cm Gauge Stone Ballast, Coarse Sand And Cement In Proportion 8:4:1 , Including Supply Of All Materials, Labour, Tools & Plant Extra For Proper Completion Of The Work. (Sor Item No 281/P-17) , M-150 Brick Work In 1:4 1 Cement And 4 Coarse Sand Of 2.20 ... Read More
Tender Value
₹
1,14,57,209
Contract Value
₹ 74,47,186.49
Saving / Difference
₹ 40,10,023
▲
Submission Date
20-11-2025
Contract Date
06-04-2026
Completion Date
180 days
Participated Bidder List
9 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,10,10,378.79 | L7 | |||
| 2 | cnet-technologies | Bid Analytics | 74,47,186.49 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 1,12,65,874.57 | L8 | |||
| 4 | cnet-technologies | Bid Analytics | 95,09,484.28 | L5 | |||
| 5 | cnet-technologies | Bid Analytics | 80,88,790.24 | L3 | |||
| 6 | cnet-technologies | Bid Analytics | 78,92,871.95 | L2 | |||
| 7 | cnet-technologies | Bid Analytics | 99,68,918.4 | L6 | |||
| 8 | cnet-technologies | Bid Analytics | 89,36,623.78 | L4 | |||
| 9 | cnet-technologies | Bid Analytics | 1,13,15,140.57 | L9 |
Work Detail
tender for earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavatd soil as directed within a lead of 50 m ar/gnida(aor-sr. no 6 item code. 2.8.1) , providing and laying in position cement concrete with 4cm gauge stone ballast, coarse sand and cement in proportion 8:4:1 , including supply of all materials, labour, tools & plant extra for proper completion of the work. (sor item no 281/p-17) , m-150 brick work in 1:4 1 cement and 4 coarse sand of 2.20 fm mortar in foundation and plinth including supply of all materials, labour and t&p etc. required proper completion of the work. (sor item no305a/ p-19) , m-150 brick work in 1:4 1 cement and 4 coarse sand of 2.20 fm mortar in superstructure for wall of one brick thick. including supply of all materials, labour and t&p etc. required proper completion of the work. (sor item no305a/ p-19) , providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (aor sr. no 20/item code no 5.1.2) , providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - above plinth level and up to 5th floor level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (aor sr. no 20/item code no 5.1.2) , steel reinforcement for reinforced cement concrete work including straightening, cutting, bending,placing in position and binding all complete up to plinth level miled steel and medium tensile steel bars. (aor-sr. no 30 item code. 5.22.1) , centering and shuttering including strutting, propping etc. and removal of form for : , foundations, footings, bases of columns, etc. for mass
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results