BRR : 9935069
Click Here To View Tendering Authority. Aoc City/State :  Kota, Rajasthan
Tender Brief : Supply Of ac unit and ac item , installation of copper tube pipe line (2 tubes) with insulation sleeve with 4 core copper cable 2.5 sq.mm for split ac. make-rpg,unifex,havell?s,anchor,rr cables,leader,unistar,finolex,asian, kel,hpl,polycab. [ warranty period: 30 months after the date of delivery ] ] , supply of copper tube pipe line 3/8 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , 18 supply of copper cable 2.5 sqmm 4 core for split ac. make-rpg,unifex,havell?s,anch or,rr cables,leader,unistar,finolex,asian,kel,hpl,polycab [ warranty period: 30 months after th e... Read More
Tender Value
Ref. Document
Contract Value
₹ 46,88,909.36
Submission Date
19-03-2026
Contract Date
06-04-2026
Completion Date
Ref. Document
Participated Bidder List
1 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 46,88,909.36 L1
Work Detail
supply of ac unit and ac item , installation of copper tube pipe line (2 tubes) with insulation sleeve with 4 core copper cable 2.5 sq.mm for split ac. make-rpg,unifex,havell?s,anchor,rr cables,leader,unistar,finolex,asian, kel,hpl,polycab. [ warranty period: 30 months after the date of delivery ] ] , supply of copper tube pipe line 3/8 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , 18 supply of copper cable 2.5 sqmm 4 core for split ac. make-rpg,unifex,havell?s,anch or,rr cables,leader,unistar,finolex,asian,kel,hpl,polycab [ warranty period: 30 months after th e date of delivery ] ] , supply,installation,testing&commissioning of copper tubes gas and liquid line, proper insulat ion and copper communication cable between indoor and outdoor ac units, copper cable between outdo or to electricity point with proper drainage and with suitable hall in wall for 2-ton, inverter floor standing tower air conditioner. ] , supply of copper tube pipe line 1/2 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , supply, of 2-ton, 3 star inverter floor standing tower air conditioner with installation testin g & commissioning as per attached details specification. make- amtrex, blue star, carrier, fedders l loyd, frick, shriram, videocon, voltas, mitshubhishi,oneric, air con, lg, hitachi, samsung or simil ar. [ warranty period: 30 months after the date of delivery ] ] , supply and installation of 5 kva single phase stabilizer for split ac 1.5 ton & 2 ton. as per a ttached details specification. make- bhel, hind rectifier, l&t, ngef, siemens, usha rectifier, delta, servocone or similar. [ warranty period: 30 months after the date of delivery ] ] , supply and installation of 10 kva single phase stabilizer for tower ac 4 ton. as per attached details specification. make- bhel, hind rectifier, l&t, ngef, siemens, usha rectifier, delta, servoc one or similar. [ warranty period: 30 months after the date of delivery ] ] , supply, of 4-ton, 3 star inverter floor standing tower air conditioner as per attached techni cal specification. make- amtrex, blue star, carrier, fedders lloyd, frick, shriram, videocon, vol tas,, air con, lg, hitachi, samsung or similar. [ warranty period: 30 months after the date of delivery ] ] , installation testing & commissioning of 4-ton, 3 star inverter floor standing tower air condit ioner as per attached details specification. ] , supply, installation ,testing & commissioning of 1.5 ton split ac 5 star rating inverter type. as per attached details specification. make- amtrex, blue star, carrier, fedders lloyd, frick, shrir am, videocon, voltas, , air con, lg, hitachi, samsung or similar. [ warranty period: 30 months afte r the date of delivery ] ] , supply, installation ,testing & commissioning of 2 ton split ac 5 star rating inverter type. a s per attached details specification. make- amtrex, blue star, carrier, fedders lloyd, frick, shrira m, videocon, voltas, , air con, lg, hitachi, samsung or similar. [ warranty period: 30 months after the date of delivery ] ] , supply and fixing of ppr drain pipe (1 [ warranty period: 30 months after the date of delive ry ] ] , supply, installation, testing & commissioning of copper tubes gas and liquid line, proper insu lation and copper communication cable between indoor and outdoor ac units, copper cable between out door to electricity point with proper drainage and with suitable hall in wall for 4-ton, inverter floor standin g tower air conditioner. ] , supply of copper tube pipe line 1/4 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , supply of copper tube pipe line 5/8 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , supply and fixing of ms angle fabricated stand suitable for 2 outdoor ac units as per site r equirement. ] , supply and installation of floor ms stand suitable for tower ac 4 ton & 2 ton indoor units a s per site requirement. [ warranty period: 30 months after the date of delivery ] ] , 3 inch hole in stone/bricks wall with pvc pipe fixing for air conditioner for installation of spli t ac units. ] , supply & fixing of l type wall mounted stand for outdoor split ac 1.5 ton & 2 ton units for installation of ac units. [ warranty period: 30 months after the date of delivery ] ]
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 835f9a6e-05f8-4a3c-89f5-ade28027a12d result notice
Download File Name File Description
Download 430342bf-7a64-429f-87a6-60b9e9a25e21 Tender Documents
Download 5714562 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders