BRR : 9924332
Click Here To View Tendering Authority. Price Bid City/State :  Jaunpur, Uttar Pradesh
Tender Brief : Tender for Earth Work In Cutting Or In Embankment In Ordinary Soil Excavation To Be In The Form Of Regular Pits Not Exceeding 1/2 Meter (20) In Depth And Earth Work In Embankment To Be In 20 Cm (8) Layers Including Ramming And Dressing The Surface To Required Level And Slopes And Also Including 1.500 M (5Ft) Lift And 30M (100) Lead The Earth From Cutting To Be Used In Making Embankment Or To Be Depodited As Spoil Banks Within 30M (100) Distance. , Construction Of Granular Sub-Base By Providing Close Graded Material , Spreading In Uniform Layers With Motor Grader On Prepared Surface , Mixing B... Read More
Tender Value
60,00,000
Submission Date
26-03-2026
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 39,57,512.92 L1
2 cnet-technologies Bid Analytics 40,91,798.65 L3
3 cnet-technologies Bid Analytics 40,91,798.65 L2
Work Detail
tender for earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 1/2 meter (20) in depth and earth work in embankment to be in 20 cm (8) layers including ramming and dressing the surface to required level and slopes and also including 1.500 m (5ft) lift and 30m (100) lead the earth from cutting to be used in making embankment or to be depodited as spoil banks within 30m (100) distance. , construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at omc , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 , ctb providing , laying and spreading material on a prepared subgbase adding cement @ 4% by weight to the spread material manually, mixingin place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer sub base. , providing and applying tack coat with bitumen vg-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per technical specification clasue 503. , providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm. to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line. grade and level to serve as wearing coarse on a perviously prepared base, including mixing in suitable plant , laying and rolling with a three wheeled 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either type a or type b or type c as per technical specification clasue 508. , providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type c seal coat as per technical spefification clause -510. , excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 , concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. , providing and laying reinforced cement concrete pipe np3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets clause 1100.(350 mm dia hume pipe) , providing and laying reinforced cement concrete pipe np3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets clause 1100.(600 mm dia hume pipe) , m-150 brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. as per sor 305b , plain cement concrete with 40mm gauge approved stone ballast,coarse sand and cement in the proportion of 4:2:1 including supply of all material,labour and t&p etc.(as per sor-279) papapet , struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and t&p etc. required for proper completion of the work. as per sor 574 , 15mm thick plaster with cement mortar consisting of 1 part cement and 4 part of approved coarse sand. minimum thickness not be less than 10mm including supply of all materials, labour and t&p etc. required for proper completion of the work. as per sor 584 , construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 1st year maintenance cost , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 2nd year maintenance cost , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 3rd year maintenance cost , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 4th year maintenance cost , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 5th year maintenance cost
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download ab5c3c54-a711-4dcb-a5ac-d7bb85852fc4 technicalevaluation notice
Download techsummary_2105532 aoc document
Download 19424fa3-5a3b-4131-a880-ece77f4b0097 financialevaluation notice
Download boqcomparativechart document
Download File Name File Description
Download 662af185-1c98-477d-9c3d-6838f556ddc1 Tender Documents
Download BOQ_2105532 Tender Documents
Download Tendernotice_1 (10) Tender Documents
Download Tendernotice_2 (2) Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid