BRR : 7303039
Click Here To View Tendering Authority. Aoc City/State :  ghazipur, Uttar Pradesh
Tender Brief : Tender For Rc Of Bharsar Abhisahan Lr To Rukkapur Sampark Road - Providing laying spreading and compacting stone aggregates ofwater bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and broomingrequisite type of screening/binding materials Type-B 11.2mmto fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per Technical Specification clause 405. 2 Providing and applying primer coat with bitumen emulsi... Read More
Tender Value
18,00,000
Contract Value
₹ 13,46,473.68
Saving / Difference
₹ 4,53,526 ▲
Submission Date
28-01-2025
Contract Date
01-05-2025
Completion Date
60 days
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 13,46,473.68 L1
2 cnet-technologies Bid Analytics 13,50,533.4 L2
Work Detail
tender for rc of bharsar abhisahan lr to rukkapur sampark road - providing laying spreading and compacting stone aggregates ofwater bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and broomingrequisite type of screening/binding materials type-b 11.2mmto fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per technical specification clause 405. 2 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specification clause 502. 3 providing and laying tack coat with bitumen vg-10 using bitumin distributer at the rate of 0.30 kg / sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 508 . 4 providing laying and rolling of open graded premix carpet 20 mm. thickness composed of 13.2mm. gauge and 11.2 mm. gauge aggregates either using penitration grade bitumen / vg-10 @ 1.46 kg/sqm.to required line grade and level to serve as wearing course on a previously prepared base ,includingmixing in a suitable plant laying and rolling with a three wheel 80-100kn static roller capicity . finished to required level and grades (including cost of bitumen) bitumen . 5 providing and layingseal coat type c with dala chips define as passing 9.5 mm. sieve and retain on2.36mm sieve @ 0.009cum. / sqm. & bitumin vg-10 @ 0.65 kg/sqm. including heating mixing laying etc. complete including all materials, labour t&p etc complet by manual means 6 the routinemaintainancework of above road. including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst )for 1styear maintenance cost 7 the routine maintainancework of above road including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 2nd year maintenance cost 8 the routinemaintainancework of above roadincluding embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 3rd year maintenance cost 9 the routine maintainancework of above roadincluding embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 4th year maintenance cost 10 the routinemaintainancework of above road including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 5th year maintenance cost 11 for cc :providing laying spreading and compacting stone aggregates ofwater bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and broomingrequisite type of screening/binding materials type-b 11.2mmto fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per technical specification clause 405. 12 constructionof un-reinforced, dowel jointed at expansion and construction joint only, plaincementconcretepavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m 30 (grade), coarse and fine aggregates conforming to is: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints.etc complete. 13 earth work in partri on both side of road including cost of royalty t&p etc. complete. 14 the routinemaintainancework of aboveroad. including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst )for 1styear maintenance cost 15 the routine maintainancework of above road including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 2nd year maintenance cost 16 the routinemaintainancework of above roadincluding embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 3rd year maintenance cost 17 the routine maintainancework of above roadincluding embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 4th year maintenance cost 18 the routinemaintainancework of above road including embankment, patri, road sides, cross drains hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. including cost of material t&p labour cess, etc. but excluding cost ofgst ) for 5th year maintenance cost
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 92c9e70a-4f12-4dd9-b8e0-62dcf334dd11
Download 273Rukkapur13
Download boqcomparativechart
Download finsummary_1763504
Download techsummary_1763504
Download File Name File Description
Download da929d5e-99dd-4d49-9226-f01757f149ce Tender Documents
Download BOQ_1763504 Tender Documents
Download T1 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000