BRR : 9795507
Tender Brief : Tender for Clearing Light Jungle Including Uprooting Wild Vegetation, Grass, Bushes, Shurbs, Sapling And Disposal Of Unserviceable Materials And Stacking Of Serviceable Material As Per Clause 201 Of Mort&H-V Revision , Earthwork Excavation In All Classes Of Soils Except Hard Rock Requiring Blasting And Depositing On Bank With All Leads And Lifts As Per Ss20b Including Cost Of All Labour Charges, Materials, Tools, Equipments And All Incidental Charges, Including Compacting With Vibratory Soil Compactor, Watering, Including All Hire And Fuel Charges For All Tools And Plants, Removal Of Other De... Read More
Tender Value
₹
15,71,00,000
Contract Value
₹ 15,70,24,651
Saving / Difference
₹ 75,349
▲
Submission Date
02-03-2026
Contract Date
05-03-2026
Completion Date
300 days
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 17,43,32,229 | L4 | |||
| 2 | cnet-technologies | Bid Analytics | 16,82,22,748 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 15,70,24,651 | L1 | |||
| 4 | cnet-technologies | Bid Analytics | 16,70,91,945 | L2 |
Work Detail
tender for clearing light jungle including uprooting wild vegetation, grass, bushes, shurbs, sapling and disposal of unserviceable materials and stacking of serviceable material as per clause 201 of mort&h-v revision , earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per ss20b including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc. , earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per ss20b including cost of seigniorage charge all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. for embankment / sub grade using carted earth with cbr 10 with a lead of 10km , providing, laying, spreading and compacting graded stone aggregates for granular sub base, including premixing the materials with water at omc in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in sub base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of morth rev-5- for gsb grading- v material , providing, laying, spreading and com
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results