BRR : 9677934
Tender Brief : Tender For Painting Of Steel Structure, Equipment, Driers As Per Scope Of Work- 1 Supply of paints and painting two coat with Heat resistant Aluminium paint of 250 degree C over the existing painted surface of steel structural including all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor levelfor dryers 33 meters for chimney without affecting the plant operations, etc. complete as per specifications and as directed by the Engineer-in-charge. 2 Supply of paints and pa... Read More
Tender Value
₹
22,11,792
Submission Date
12-01-2026
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics |
Work Detail
tender for painting of steel structure, equipment, driers as per scope of work- 1 supply of paints and painting two coat with heat resistant aluminium paint of 250 degree c over the existing painted surface of steel structural including all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor levelfor dryers 33 meters for chimney without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 2 supply of paints and painting two coat with heat resistant aluminium paint of 600 degree c over the existing painted surface of steel structural including all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 3 supply of paints and painting one coat with enamel paint over a coat of zinc-chromate/ zinc-phosphate primer over the existing painted surface of steel structuralincluding all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 4 supply of paints and painting one coat with enamel paint over the existing painted surface of steel structuralincluding all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 5 supply of paints and painting one coat with epoxy coal tar paint over a coat of epoxy zinc-chromate/zinc-phosphate primer over the existing painted surface of steel structuralincluding all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 6 supply of paints and painting one coat with epoxy coal tar paint over the existing painted surface of steel structuralincluding all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 7 supply of paints and painting one coat with chlorinated rubber paint over a coat of chlorinated zinc-phosphate primer over the existing painted surface of steel structuralsincluding all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge. 8 supply of paints and painting one coat with chlorinated rubber paint over the existing painted surface of steel structural, like platforms, ladders etc, and equipments like conveyors, elevators, bins, tanks, pipes, separators etc including all steel scaffolding, staging and all safety arrangements in running plant and other building and thorough scrapping and cleaning the surface in all heights upto 15m from floor level without affecting the plant operations, etc. complete as per specifications and as directed by the engineer-in-charge.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results