BRR : 9607730
Tender Brief : Tender for Dismantling B.M In Cement Mortar Under 3Mtr Height Including Stacking The Usefull Materials For Reuse And Removing The Debries Away From Work , Earth Excavation In Hard Soil Within Initial Lead Of 50M And Initial Lift Of 1.5M And Initial Lift Of 1.5 M Including Rough Dressing And Leveling The Bed As Per The Specification Approved By The Dept. And Direction Eng-In-Charg Guard Wall , Filling In Foundation With Sand Well Watered And Rammed Including Cost,Conveyance,Royalty And Taxes , P.C.C(1:4:8)With 4Cm Size Hg Crusher Broken Metal Including All Cost,Conveyance,Royality And Taxes Et... Read More
Tender Value
₹
5,88,960
Contract Value
₹ 5,90,796
Saving / Difference
₹ -1,836
▼
Submission Date
13-11-2025
Contract Date
18-02-2026
Completion Date
60 days
Participated Bidder List
12 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 4 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 5 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 6 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 7 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 8 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 9 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 10 | cnet-technologies | Bid Analytics | 5,90,796 | L1 | |||
| 11 | cnet-technologies | Bid Analytics | 5,90,796 | L2 | |||
| 12 | cnet-technologies | Bid Analytics | 5,90,796 | L2 |
Work Detail
tender for dismantling b.m in cement mortar under 3mtr height including stacking the usefull materials for reuse and removing the debries away from work , earth excavation in hard soil within initial lead of 50m and initial lift of 1.5m and initial lift of 1.5 m including rough dressing and leveling the bed as per the specification approved by the dept. and direction eng-in-charg guard wall , filling in foundation with sand well watered and rammed including cost,conveyance,royalty and taxes , p.c.c(1:4:8)with 4cm size hg crusher broken metal including all cost,conveyance,royality and taxes etc. complete of all materials to work site as per specification approved by the deptt. and direction of engg-in-charge. , reinforced cement concrete work of m20 grade with 20mm down grade chips(cb) including hoisting and laying , supplying fitting and placing uncoated hysd bar reiforcement complete as per drawing and technical specification . , rigid and smooth centring and shuttering for reinforced cement concrete work including false works and dismantling , add for sign board and photograph (pre during and post)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results