BRR : 9503677
Tender Brief : Tender For Link Road Allahabad Laucknow Road Par Rafeua To Samhai Tak Road Repair Work 05 Year Defect Lability Work - Earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by EC 2 W.B.M. Grading-3Providing, laying, spreading and compacting stone aggre... Read More
Tender Value
₹
28,10,000
Submission Date
07-11-2025
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
tender for link road allahabad laucknow road par rafeua to samhai tak road repair work 05 year defect lability work - earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by ec 2 w.b.m. grading-3providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per technical specification clauses 405. 3 providing and applying tack coat with bitumen vg-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (mord 503) as per analysis 4 providing laying and rolling of open graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen of cut back or emulsion to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tone capacity finished to required level and qrades 5 providing and laying seal coat sealing the voids in a bituminous surface 6 supply and fixing of 350 mm dia hume pipe 7 s/f of signboard as per direction of engineer in charge 8 earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes a 9 w.b.m. grading-3providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper gra 10 m150 class brick work in 1:4 in cement and coarse sand in foundation and plinth including all supply 11 cement concrete with 20/10mm gauge approved stone grit coarse sand 2.5 fm and cement proportion of m20(1:1.5:3) 12 supply and laying 125 micron pollytnene sheet 13 supply and laying of 6 mm thick plain a.c sheet 14 the routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 1st year maintenance [email protected]% 15 the routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 2nd year maintenance [email protected] % 16 the routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 3rd year maintenance [email protected]% 17 the routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 4th year maintenance [email protected]% 18 the routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 5th year maintenance [email protected]% 19 the routine maintenance of above road work including earthen shoulder and interlocking roadetc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 1st year maintenance [email protected]% 20 the routine maintenance of above road work including earthen shoulder and c.c worketc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 2nd year maintenance [email protected]% 21 the routine maintenance of above road work including earthen shoulder and ic.c worketc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 3rd year maintenance [email protected]% 22 the routine maintenance of above road work including earthen shoulder and c.c worketc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 4th year maintenance [email protected]% 23 the routine maintenance of above road work including earthen shoulder andc.c worketc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material t&p labour but excluding gst) for 5th year maintenance [email protected]%
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results