BRR : 9494648
Tender Brief : Tender For Construction Of Toilet For Farmers - Excavation in Foundation in ordinary sail including lead 30m & left up to 1.50 3 Providing and laying in position cement concrete of specified grade- 1:5:10 (1 cement : 5 Coarsened (Zone-3) derived from naturalsources : 10 graded stone aggregate 40mm nominal Size derived from natural sources). 4 1st class brick work with common burnt clay F.P.S. (Non modular) bricks in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse-sand) including supply of all material labour T&P etc. 5 1st class brick work with common burnt clay F.P.S. (No... Read More
Tender Value
₹
Ref. Document
Submission Date
02-09-2025
Participated Bidder List
5 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics |
Work Detail
tender for construction of toilet for farmers - excavation in foundation in ordinary sail including lead 30m & left up to 1.50 3 providing and laying in position cement concrete of specified grade- 1:5:10 (1 cement : 5 coarsened (zone-3) derived from naturalsources : 10 graded stone aggregate 40mm nominal size derived from natural sources). 4 1st class brick work with common burnt clay f.p.s. (non modular) bricks in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse-sand) including supply of all material labour t&p etc. 5 1st class brick work with common burnt clay f.p.s. (non modular) bricks in in super structure in cement mortar 1:6 (1 cement : 6 coarse-sand) including supply of all material labour t&p etc 6 reinforced cement concrete work in beams suspended floors roofs having slope up to 15” landing, balconies chajjaslintels, bands, plain window sills, staircases and spiral stair cases above plinthleave up to floor five leavel excluding the cost of centering. shuttering finishing and reinforcement with 1:1:5:3 (1 cement : 1.5 coar-sened jone-3) derived from naturalsources :3 graded stone aggregate 20mm nominal sigd derived from natural sources). 7 steel reinforcement foe rcc work including straightening cutting, banding, placing in position and binding all complete upto plinth leave (thermo mechanically treated bars of grade fe-500d or more. 8 12 mm thick c plaster 1:4 ratio with cement and coarse-sand mortar on wallincluding supply of all material labour, t&p etc. 9 two coat finishing wall with acrylic smooth exterior paint of required shade on old work. 10 supply and fixing of ms door etc. including supply of all material labour and t & p etc. complete 11 fitting of pipe line sentry (wc pan etc.) labour rate for three latrine and two bathroom with connection of safety tank etc.complete.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results