BRR : 9494350
Tender Brief : Modification Of Existing Copper Conductor Arrangement- 1 MODIFICATION OF EXISTING COPPER CONDUCTOR ARRANGEMENT OR CANE UNLOADER TO MS ANGLE TYPE BUSBAR ARRANGEMENT IN SPAN OF 40 MTR ON BOTH SIDE (WITH COMMPLETE MATERIAL) SCOPE OF WORK: 1- Dismentling of existing complete copper conductor arrangement having 08 copper conductor of 40 Mtr each (total length 320 Mtr) in a span of 40 Mtr, 2- Fabrication of MS angle type busbar arrangement 320 Mtr in a span of 40 Mtr, 3- All the consumable items such as welding electrode, gas etc will be in partys scope, 4- All the required parts such as MS angle, ... Read More
Tender Value
₹
Ref. Document
Submission Date
05-09-2025
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
modification of existing copper conductor arrangement- 1 modification of existing copper conductor arrangement or cane unloader to ms angle type busbar arrangement in span of 40 mtr on both side (with commplete material) scope of work: 1- dismentling of existing complete copper conductor arrangement having 08 copper conductor of 40 mtr each (total length 320 mtr) in a span of 40 mtr, 2- fabrication of ms angle type busbar arrangement 320 mtr in a span of 40 mtr, 3- all the consumable items such as welding electrode, gas etc will be in partys scope, 4- all the required parts such as ms angle, insulators, nut-bolts etc will be in partys scope, 5-all the necessary equipments as required will be in partys scoppe except armoured cable which will be company scope, 6-all the necessary too and tackels, welding machine etc will be in partys scope. 2 terms and conditions:payment 20% after completion of dismantling work, 40% after delivery of material, 30% after completion of installation work and remaining 10% after satisfactory completion and satisfactory load trial on recommendation of chief engineer, 2- free of cost repairing/replacement in case of any fault/problem during one crushing season.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results