BRR : 9489123
Tender Brief : Tender For Construction Of Roof And Other Repair At Kisan Bhawan. - Construction of Roof and Other Repair at Kisan Bhawan 2 Cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including s/o all materials labour T &P etc. required for proper completion of the work. 3 R.C.C.work with cement approved coarse sand and 2 cm gauge approved stone grit.in proportion of 1:2:4 in R.C.C. Raft Foundation and footingexcluding supply of reinforcement and its bending but including its fixing and bindings the same with 24BWG.C.I. binding wire and including... Read More
Tender Value
₹
6,09,285
Submission Date
07-08-2025
Participated Bidder List
6 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics |
Work Detail
tender for construction of roof and other repair at kisan bhawan. - construction of roof and other repair at kisan bhawan 2 cement concrete with 4cm gauge approved stone ballast coarse sand and cement in the proportion of 8:4:1 including s/o all materials labour t &p etc. required for proper completion of the work. 3 r.c.c.work with cement approved coarse sand and 2 cm gauge approved stone grit.in proportion of 1:2:4 in r.c.c. raft foundation and footingexcluding supply of reinforcement and its bending but including its fixing and bindings the same with 24bwg.c.i. binding wire and including necessary centering and shuttering etc. and supply of all materials labour t & p etc. requiredfor proper completion of work including cost of winding wire. 4 m-150 brick work in 1:6 (one cement and six find sand of 1.25 fm) mortar in superstructure including necessary cutting and molding of bricks as required thickness of wall not to be less than 1.5 bricks includingsupply of all material labour t&p etc. required for proper completion of the work. 5 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 6 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 7 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 8 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 9 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 10 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 11 m.s.(tor steel or plain)in plain work such as r.c.c. or r.b. work including bending for proper shape and excluding supply of steel and also including authorised overlapping shall be measured and including cost of binding wire.(lavour rate only) 12 dismantling brick work or stone work in mud mortar including stacking of materials as directed be the engineer-in-charge with in a distance of 60 meter (200 feet) (dismantling of old soiling)
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results