BRR : 9457722
Tender Brief : Tender For Works Of Assistance In The Operation Also Breakdown Maintenance Of Re-Claimer ( Old And New) And Fog Cannon Of Chp,Obra Tps, Obra, 1 PART-I 2 Assistance in the operation of Stacker/Re-claimer of Coal Handling Plant ‘B’TPS, Obra.(One shift of 8 hrs. considered as 01 job.) 3 Routine Checking, Operation & Break down Maint. of Fog Cannon machines of Coal Handling Plant ‘B’TPS, Obra. (One shift of 8 hrs01 job per day.) 4 PART-II ( Annual Maintenance work of Old/New Stacker Re-Claimer of CHP, BTPS. ) 5 Replacement of damaged side rubber packing of boom/intermediate conveyor of old/... Read More
Tender Value
₹
26,84,123
Submission Date
01-10-2024
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
tender for works of assistance in the operation also breakdown maintenance of re-claimer ( old and new) and fog cannon of chp,obra tps, obra, 1 part-i 2 assistance in the operation of stacker/re-claimer of coal handling plant ‘b’tps, obra.(one shift of 8 hrs. considered as 01 job.) 3 routine checking, operation & break down maint. of fog cannon machines of coal handling plant ‘b’tps, obra. (one shift of 8 hrs01 job per day.) 4 part-ii ( annual maintenance work of old/new stacker re-claimer of chp, btps. ) 5 replacement of damaged side rubber packing of boom/intermediate conveyor of old/new stacker/re-claimer. 6 replacement of box duct packing of reclaiming/stacking chute of conveyor no. 16, k-10 related to old/new stacker/re-claimer. 7 replacement of bolt of damaged teeth/damaged teeth by repaired/ new one bucket wheel of old/new stacker/ re-claimer. 8 replacement of tensioning screw by old & usable/new, after adjustment of belt and to provided proper tension of belt boom/intermediate conveyor of old/new s/r. 9 proper winding of unwounded cable on control cable reeling drum after complete cleaning and greasing of moving structure of old/new s/r, each job per 50 mtr. 10 proper winding of unwounded cable on power cable reeling drum after complete cleaning and greasing of moving structure of old/new s/r, each job per 50 mtr. 11 proper cleaning & greasing of spur gear of slewing system old /new stacker/re-claimer. 12 draining out the contaminated oil of the tank of hydraulic unit after complete cleaning & refilling with new/ old along with shifting from store to site and vice versa. 13 replacement of damaged coupling bolts along with bush of flexible coupling travel system/boom conveyor / slewing system. 14 replacement of contaminated oil/refilling in reduction gear boxes of travel / slewing / boom/intermediate conveyor/bucket wheel. 15 cleaning & greasing of driving bogies and non driving bogies of old/new stacker/re-claimer. 16 proper cleaning and greasing of chain along with chain sprocket/reeling/guide wheel bogies of control/power cable reeling drum of old/new stacker/re-claimer. 17 replacement/readjustment of brake shoe of brake system of old/new stacker/re-claimer. 18 re-placement of damaged oil seals of reduction gear boxes of boom/intermediate conveyor, bucket wheel of old/new stacker/re-claimer: 19 replacement of damaged oil seal ‘o’ ring of fluid coupling fcu 16.25 of old/new stacker/re-claimer: 20 replacement of damaged resilient plate, multi disc of fluid coupling of new/old stacker/ re-claimer: 21 replacement of rubber pad of vibrating feeder tray of new/old stacker re-claimer: 22 replacement of rubber packing of vibrating feeder tray of old/new stacker/re-claimer: 23 complete cleaning of chocking oil/grease circulating hoses, ‘t’ joints nrv/grease pump and replacement of same if required of old /new stacker/re-claimer: 24 repairing of damaged shaft of pulley after dismantling and removal from foundation including dismantling and re-fixing of tray at boom/intermediate conveyor at side of old/new stacker/re-claimer: 25 re-adjustment of rail clamps after re-railment in its poison on travel rail of old/new stacker/re-claimer: 26 alignment of complete system of motor to reduction gear boxes of slewing system/travel system/boom intermediate conveyor/bucket wheel of old/new stacker/re-claimer: 27 cleaning/ replacement/repairing of pressure relief valve/directional valve, nrv of discharge line/elbow of discharge line/oil filters of new stacker/re-claimer: 28 replacement/repairing of axial piston pump of hydraulic unit along with the alignment with motor for hoisting system of new/stacker/re-claimer: 29 servo coating/greasing of wire rope and moving wheel of travel trolley conveyor 16/k-10 hoisting system of old /new stacker /re-claimer: 30 repairing/replacement of thruster assembly of travel /slewing /hoisting system of new /old stacker re-claimer: 31 cleaning & greasing ofslewing spur gear and boom conveyor hydraulic cylinder hings of new stacker re-claimer: 32 cleaning & oiling of slewing pivot bearing of old stacker/ re-claimer. 33 overhauling of angular gear box of power/control cable reeling drum system of new/old stacker /re-claimer: 34 overhauling of oil lubricating pump for bucket drive gears nrv of slewing gears. 35 fabrication & installation of duct plate assembly for intermediate conveyor at site of new stacker/re-claimer. 36 removal of top cover of the reduction gear boxes of travel system of old/new s/r to check the gear teeth and bearings. 37 adjustment of belt while going out on drive non-drive pulley along with roller structures of boom/intermediate conveyor of old/new stacker/re-claimer: 38 replacement of side plate of re- claiming /stacking box duct of old/new s/r, conveyor 16k-10 after fabrication at side: upto 2 mtrs. 39 above 2 mtrs. 40 replacement of damaged fluid coupling by new/repaired: 41 replacement of damaged bearing /oil seals of raping gear box of motor assembly of power and control cable reeling drum along with its alignment for new/old stacker re-claimer: 42 replacement of damaged oil seals/bearings of gear boxes of travel system of old/new stacker /reclaimer: 43 replacement of different type of rollers at the box duct of conveyor of old/new stacker/reclaimer 44 replacement of pollard/covered bearing of different pulleys of conveyor system except gravity take up pulley, drive pulley: 45 repair of damaged guide channel of gravity take up including all cutting welding and transportation of material from store to site and back: 46 different works to be carried out in the gear box of old/new stacker-reclaimer system 47 removal of the top cover of the gear box and to install the same after checking/completion of the work. 48 replacement of the input pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 49 replacement of the intermediate pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 50 replacement of the output shaft fitted with wheel/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results