BRR : 9452873
Tender Brief : tender for Competitive E-Bidding For Bagasse Bailing, Shifting And Feeding Work For Season 2024-25 Bagasse Bailing, Shifting And Feeding Work For Season 2024-25, 1. Bundle the remaining bagasse from the boiler using 12x12x24 bagasse billeting machine using 16 gauge wire/plastic rope (contractor to bring it himself) and stack 15 knots high at a distance of 50 m.2. Bundle the bagasse as above and stack 15 knots high at a distance of 50 to 100 m.3. Bagasse sifting and feeding work (When the crushing season starts, new/old bagasse/wood should be fed to maintain pressure as per the requirement in ... Read More
Tender Value
₹
Ref. Document
Submission Date
14-09-2024
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics |
Work Detail
tender for competitive e-bidding for bagasse bailing, shifting and feeding work for season 2024-25 bagasse bailing, shifting and feeding work for season 2024-25, 1. bundle the remaining bagasse from the boiler using 12x12x24 bagasse billeting machine using 16 gauge wire/plastic rope (contractor to bring it himself) and stack 15 knots high at a distance of 50 m.2. bundle the bagasse as above and stack 15 knots high at a distance of 50 to 100 m.3. bagasse sifting and feeding work (when the crushing season starts, new/old bagasse/wood should be fed to maintain pressure as per the requirement in such a way that the boiler pressure is always maintained at 21 kg. if loose bagasse is saved, then shift it to the bagasse yard carrier and keep it in such a way that there is no jam on the bagasse carrier and the bagasse does not return and can be fed easily when required. contractor for bagasse shifting and feeding sufficient labour and tractors will have to be employed per shift.4 before the start of the crushing session, steam trial mill grinding and mill closure cleaning for starting the crushing session and after the end of the crushing session, to start the process, wood, bundles and loose bagasse kept in the bagasse yard should be lifted by the means (tractor and labourers) and thrown into the boiler and pressure should be maintained till the work is completed. loose bagasse should be back fed through the rbc chain. a few days before lifting the pressure, it is necessary to collect the bundles kept in the bagasse yard near the boiler, for which no additional charge will be payable.5 dry the wet bagasse spread in the bagasse yard by digging and turning it with your own resources and keep the dry bagasse separately in the return bagasse carrier. loose bagasse from the rock should not be mixed in it. this work will be done under the supervision of the boiler engineer.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results