BRR : 9318023
Click Here To View Tendering Authority. Technical Bid City/State :  orai, Uttar Pradesh
Tender Brief : Work Of Construction And Strengthening Of 11 Kv New Line Under Power Distribution Division I, Orai, Capacity Increase Of 33 / 11 Kb Power Sub-Station And Other Work Related To The Sub-Station In Which All Types Of Clamps, Nuts-Bolts, Stone Pads Will Be Provided As Required By The Executing Agency. This Will Include Providing Number Plates, Lugs And Danger Boards Etc.- 1 Commissioning Ofthe Whole Following Work Including Carriage, Commissioning With All Required Material As Per Resspo Norms. Please Read The Boq Carefully Then Quote The Rates. 2 11 Kv Pin With Nut 3 33 Kv Pin ... Read More
Tender Value
35,00,000
Submission Date
25-09-2023
Participated Bidder List
4 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics
Work Detail
work of construction and strengthening of 11 kv new line under power distribution division i, orai, capacity increase of 33 / 11 kb power sub-station and other work related to the sub-station in which all types of clamps, nuts-bolts, stone pads will be provided as required by the executing agency. this will include providing number plates, lugs and danger boards etc.- 1 commissioning ofthe whole following work including carriage, commissioning with all required material as per resspo norms. please read the boq carefully then quote the rates. 2 11 kv pin with nut 3 33 kv pin with nut 4 11 kv disc & fitting 5 earthing complete with all fitting as per resspo norms. 6 pcc 8.5 mtr with earthing, grouting & concreting of support & stay as per respo norms 7 11 kv f clamp with all fitting 8 11 kv cross arm with clamp 9 lighting arrestor with all fitting as per resspo norms 10 installation / replacement of 33 kv line isolator with all fitting as per resspo norms 11 installation / replacement of 33 kv bus isolator with all fitting as per resspo norms 12 installation / replacement of 33 kv post insulator with all fitting as per resspo norms 13 weasel conductor with all fitting as per resspo norms. 14 rabbit conductor with all fitting as per resspo norms. 15 installation / replacement of 33 kv control panel single t / f with all fitting as per resspo norms 16 2x2.5 sqmm control cable with all fitting as per respo norms 17 4x2.5 sqmm control cable with all fitting as per respo norms 18 installation / replacement of 33 kv ct with all fitting as per respo norms 19 installation / replacement of 33 kv vcb with all all fitting as per respo norms 20 installation / replacement of 11 kv vcbi / c with all all fitting as per respo norms 21 installation / replacement of 11 kv vcbo / g with all all fitting as per respo norms 22 energization of 5 mva t / f with all fitting as per respo norms inculding earthing etc 23 energization of 10 mva t / f with all fitting as per respo norms inculding earthing etc 24 11 kv 3x120 xlpe cable with laying chargesas per respo norms 25 11 kv 3x300 xlpe cable with laying chargesas per respo norms 26 jointing of 3x120 mm outdoor for 11 kv cable by heat shrinkable jointing kit with all fitting as per respo norms 27 jointing of 3x300 mm indoor for 11 kv cable by heat shrinkable jointing kit with all fitting as per respo norms 28 jointing of 3x300 mm outdoor for 11 kv cable by heat shrinkable jointing kit with all fitting as per respo norms 29 90 lbs rail pieces for t / f ( 44.64 kg / m ) with all fitting as per resspo norms. 30 in the works related to 33 / 11 kv power substation, all the old materials ( power t / f, 11 / 0.4 kv t / f, 33 and 11 kv cables, steel scrap, conductors, ct / pt, vcb, control panel etc. ) will be dismantled by the contractor and the old dismantled material will be taken from the pit site and deposited in the store. 31 clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation of site incharge
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download technical_1406919 aoc document
Download techsummary_1406919 aoc document
Download a596b4ec-4717-4c00-b9c8-b9778cfddffa technicalevaluation notice
Download File Name File Description
Download 5c6a5c78-9db2-405a-a335-23e148981397 Tender Documents
Download BOQ_1406919 Tender Documents
Download Tendernotice_1 Tender Documents
Download TF28 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.