BRR : 9248713
Tender Brief : Under Electricity Distribution Division, Jhansi On The Basis Of Business Plan On Semi-Turnkey Basis, On The Previously Established Line To Separate The Line Of 11 Kv Laxmanpura Feeder Coming Out Of 33 / 11 Kv Gallamandi, Jhansi From The Urban Feeder. Construction Of New Single Circuit Line ( From Ice Factory To Aastha Petrol Pump ) Work.-2 Carriage Of Line Material From Store Centre Hansari To Work Site Errection And Commissioning Of 33 Kv Line On Single Pole Work Includes Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect... Read More
Tender Value
₹
12,43,000
Submission Date
31-01-2023
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
under electricity distribution division, jhansi on the basis of business plan on semi-turnkey basis, on the previously established line to separate the line of 11 kv laxmanpura feeder coming out of 33 / 11 kv gallamandi, jhansi from the urban feeder. construction of new single circuit line ( from ice factory to aastha petrol pump ) work.-2 carriage of line material from store centre hansari to work site errection and commissioning of 33 kv line on single pole work includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the line as per respo manual and rates. 3 stp pole 13 mtr. long 4 complete stay set ( material will be provided by department ) . 5 complete earthing rod ( material will be provided by department ) . 6 acsr weasalconductor ( material will be provided by department ) . 7 errection and commissioning ofdouble / tri suport s.t.p pole 13 meter longwork includes earthing, grouting, laying, sagging, strengthing, binding of conductor andall work required to errect the lineand work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 8 double pole structure for 13 mtr. stp 9 errection and commissioning of11 / 0.4 kva sub-station and material required for ht / lt metering system on pcc pole / meter room incuding all work required for energising the line and work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 10 laying 11 kv xlpe 3x300 sqmm cable 11 11 kv 3x300 sqmmi / d and o / d cable boxes 12 gi pipe dia 6 inch ( providing & laying by the contractor ) 13 digging of tunnel for 11 kv xlpe 3x300 sqmm cable ( hard & rocky soil ) 14 cutting of tree branches 15 straight throgh jointing kit xlpe 11 kv cable ( provided & fixing by the contractor )
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results