BRR : 8905156
Tender Brief : Deposit Work Ms Shiv Vardan Colony Under Edd Jhansi-1 Erection And Commissioning Of The Following Work. 2 Carriage Of Line Material From Store Centre Hansari To Work Site Errection And Commissioning Of 33 Kv Line On Single Pole Work Includes Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor And All Work Required To Errect The Line As Per Respo Manual And Rates. 3 Stp Pole 09 Mtr Long 4 Complete Stay Set ( Material Will Be Provided By Department ) . 5 Complete Earthing Rod ( Material Will Be Provided By Department ) . 6 Weasel / Rabbit Conductor... Read More
Tender Value
₹
Ref. Document
Submission Date
27-01-2021
Participated Bidder List
4 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics |
Work Detail
deposit work ms shiv vardan colony under edd jhansi-1 erection and commissioning of the following work. 2 carriage of line material from store centre hansari to work site errection and commissioning of 33 kv line on single pole work includes earthing, grouting, laying, sagging, strengthing, binding of conductor and all work required to errect the line as per respo manual and rates. 3 stp pole 09 mtr long 4 complete stay set ( material will be provided by department ) . 5 complete earthing rod ( material will be provided by department ) . 6 weasel / rabbit conductor ( material will be provided by department ) . 7 errection and commissioning of double / tri suport pcc pole 8.5 / stp 11 meter long work includes earthing, grouting, laying, sagging, strengthing, binding of conductor and all work required to errect the line and work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 8 double pole structure. 9 errection and commissioning of 11 / 0.4 kva sub-station and material required for ht / lt metering system on pcc pole / meter room incuding all work required for energising the line and work includes carriage of all centralized required material and material will be provided by the department ( grouting material will be provided by the contractor ) as per respo manual and rates. 10 100 kva t / f 11 ab cable 3x95 sqmm 12 distribution box
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | EDCD9598-92BA-4A51-9C5C-79A4C27769BF | Tender Documents - Tender Notice |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid