BRR : 9220921
Tender Brief : Repair Of Damaged Poles, Dilapidated Lines And Other Maintenance Work In Areas Coming Under Sub-Division Bharthana Under Electricity Distribution Division Ii, Etawah.- 1 Safe Carriage Ofstp / Pcc Pole From Store Center Etawah To Site Of Work. Including Loading & Unloading At Both Ends. 2 Safe Carriage Ofline Materialfrom Store Center Etawah To Site Of Work. Including Loading & Unloading At Both Ends. 3 Erection And Grouting Ofstp / Pcc Pole Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht / Lt Fittings As Per Respo Norms. The Support Shall Be Grouted In ... Read More
Tender Value
₹
Ref. Document
Submission Date
26-12-2022
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
repair of damaged poles, dilapidated lines and other maintenance work in areas coming under sub-division bharthana under electricity distribution division ii, etawah.- 1 safe carriage ofstp / pcc pole from store center etawah to site of work. including loading & unloading at both ends. 2 safe carriage ofline materialfrom store center etawah to site of work. including loading & unloading at both ends. 3 erection and grouting ofstp / pcc pole duly grouted including necessories clamps, accessories required fixing of ht / lt fittings as per respo norms. the support shall be grouted in cement, sand and brick ballast. it including the cost of all labour, t&p etc. required for proper completion of work. 4 erection and grouting of double pole structure of 9 / 8.5 mtrs longpcc pole duly grouted including necessories clamps, accessories required fixing of ht / lt fittings as per respo norms. the support shall be grouted in cement, sand and brick ballast. it including the cost of all labour, t&p etc. required for proper completion of work. 5 installation of stay set with grouting and nuzzling etc. as per respo drawing / norms along with all routine material to be used for such works. 6 earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour t&p and required material for such work. 7 dismantling & re-installation of consumer’s cable service connection from existing line feeding consumer supply. 8 laying, sagging and stringing and jumpering / binding etc. ofarial bunch conductor 3x50 sq mm. in lt lines as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work 9 laying, sagging and stringing and jumpering / binding etc. ofacsr weasel / raccon conductor in 11 kv / lt lines as per respo manual and as per direction of executive engineer including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work 10 dismantlingof existing old conductor, from the various areain the respective j.e.’s ( store ) as per direction of supervising engineer. it includes the work of cartage the cost of labour t & p carrier etc. required for proper completion of work. 11 re-sagging of loose 11 kv. / l.t. line as per direction of executive engineer. it includes the cost of labour, t&p etc required for proper completion of work. 12 re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of h.t / l.t line properly as per direction of supervising engineer. 13 straightening of 8.5 / 9 mtr. long pcc / st / rail pole tilted poleat various places by straighteningof pole including the cost of labour , t&p charges required for proper completion of work. 14 chopping of tree branches to clear the line route to give horizontal and vertical clearance to the line including cost of labour t&p etc. 15 repairing / resagging / new guardingof ht / lt line with gi wire as per respo norms. 16 replacement of following broken / damaged / missing accessories by new accessories including opening of the same and refixing. ( i ) 11 kv line jumper 17 ( ii ) lt line jumper 18 ( iii ) 11 kv pin insulator 19 ( iv ) 33 kv disc insulator 20 ( v ) cross arms holding clamps 21 ( vii ) stays clamp 22 carriage of scrap material ( 11 / 13 mtrs. long damaged st pole from pit site to j.e store kunera etawah including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results