BRR : 9157643
Click Here To View Tendering Authority. Technical Bid City/State :  hamirpur, Uttar Pradesh
Tender Brief : Electrification Of Line Under Edd Hamirpur-2 Cartage of Poles from Store center Hamirpurfrom any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labor, T & P carrier etc. required for proper completion of work. 3 11 M STP Poles 4 8.5 M PCC Pole 5 Cartage ofline material viz. Weasel conductor, Gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from Store centerany other place to the respective s... Read More
Tender Value
6,04,000
Submission Date
12-09-2022
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
Work Detail
electrification of line under edd hamirpur-2 cartage of poles from store center hamirpurfrom any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labor, t & p carrier etc. required for proper completion of work. 3 11 m stp poles 4 8.5 m pcc pole 5 cartage ofline material viz. weasel conductor, gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centerany other place to the respective site of work through the kachha pacca road includingthe work of its loading & unloading at the respective ends, including the work ofdragging etc. and also including the cost oflabor, t & p and carrier etc. required for proper completion of work. 6 erection of single support poles including complete h.t./l.t. fittings as per resspo manual and as per direction of engineer inchargeincluding the cost oflabor, t&p and carrier etc. required for proper completion of work. 7 11 m stp poles 8 8.5 m pcc pole 9 erection of double pole on poles including the work of complete h.t. fittings as per resspo manual and as per direction ofengineer incharge including the cost oflabor, t&p and carrier etc. required for proper completion of work. 10 11 m stp poles 11 8.5 m pcc pole 12 groutingof poleas per resspo manual and as per direction of engineer incharge includingthe cost oflabor, t&p and carrier etc. required for proper completion of work. 13 11 m stp poles 14 8.5 m pcc pole 15 erection of stay set including the work of nuzzling etc as per resspo manual. 16 fixing of t-off with fitting of all accessories as per direction of supervising engineer. it includes the cost of labour t&p carrier etc required for proper completion of work. 17 laying, sagging, stringing, binding and jumpring etc. of acsr weasel conductor new/oldon the newly erected pole as per resspo manual and as per direction of supervising engineer. 18 laying, sagging, strining, bimding and jumpring etc of acsr weasel conductor new/old on the newly erected pole any other place as per rsspo manula and as per direction of supervisiing engineer. 19 erection of earthing complete as per direction of supervising enginer. it includes the cost of labour t&p carrier etc required for proper completion of work. 20 safely loading, unloading & cartage of following transformer from esc/ask store hamirpur or any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging etc and also inlucding the cost of labour t&p and carrier etc required for proper completion of work. 21 25 kva transformer 22 63 kva transformer 23 safely installation & erection of following transformer installation of new douple pole as per direction of supervising engineer. it includes the cost of labour t&p carrier etc required for proper completion of work. 24 25 kva transformer 25 63 kva transformer 26 gaurding of road crossing as per resspo manual & direction of supervising engineer. it includes the cost of labour t&p carrier etc required for proper completion of work. 27 tree chooping of 11 kv line near by 11 kv ht line & lt line any other place.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download technical_1169180 aoc document
Download techsummary_1169180 aoc document
Download 9a777a7b-0ff0-4172-b19c-eea06be4e5da technicalevaluation notice
Download File Name File Description
Download 2671dda1-173d-4895-92ac-e51c7f7eb884 Tender Documents
Download 51SEEDCH2022-23 Tender Documents
Download BOQ_1169180 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.