BRR : 9126340
Tender Brief : Replacement Of Wornout Components Of Hc Pump Set Of Capacity 10000 Gph X 250 Mtrs Head Installed At P / S Chargal. R-Replacement of wornout components of 10000 GPH X 250 mtrs head HC Pump set installed at P/S Chargal by disconnecting power cables and dismantling of the suction and delivery bends and removing the pump set from base plate after decoupling. Shifting the pump set outside pump room with the help of chain pulley block and manual labour and then loading in mechanical transport for carriage to workshop and unloading there. Segregating the damaged parts i.e. pump shaft, impellers,... Read More
Tender Value
₹
25,300
Submission Date
19-04-2022
Participated Bidder List
6 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics |
Work Detail
replacement of wornout components of hc pump set of capacity 10000 gph x 250 mtrs head installed at p / s chargal. r-replacement of wornout components of 10000 gph x 250 mtrs head hc pump set installed at p/s chargal by disconnecting power cables and dismantling of the suction and delivery bends and removing the pump set from base plate after decoupling. shifting the pump set outside pump room with the help of chain pulley block and manual labour and then loading in mechanical transport for carriage to workshop and unloading there. segregating the damaged parts i.e. pump shaft, impellers, stage casing c.i bodies, gland set and bearings, etc. remetalling and machining of pump shaft. p/f of new impellers- 06 no. and repair to 03 no. impellers, neck rings – 09 nos., gland bush -04 no., repairs to bearing housing, bracket sleeve-01 no, diffuser bush – 09 nos., fitting of pulley set with coupling bolts and rubber bushes. p/f of new bearing 7308-02 nos. and 308-1 no. assembling the pump motor set, shifting back to site using manual labour and then fitting on base plate, suction and delivery flanges both by p/f of nuts, bolts and rubber flanges after proper leveling/alignment etc. complete job including cost of material, labour, installation and testing at site.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results