BRR : 9108511
Tender Brief : Construction Of Dug Well Sainik Basti Churu - Excavating the soil up to 1.5 depth in the foundation, ditch, drain, compacting the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the empty spaces with soil again after filling the foundation and filling the remaining soil up to 50 meters. to dispose of to a distance of 0 To 1.5m 2 1.5 To 3m 3 3 To 4.50m 4 4.50 To 6m 5 6 To 7.50m 6 7.50 To 9m 7 9 To 10.50m 8 10.50 To 12m 9 12 To 13.50m 10 13.5 To 15m 11 15 To 16.50m 12 16.5 To 18m 13 18 To 19.50m 14 19.5 To 21m 15 21 To 23.5m 16 23.5 To 25m 17 25... Read More
Tender Value
₹
6,59,000
Submission Date
19-02-2025
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics |
Work Detail
construction of dug well sainik basti churu - excavating the soil up to 1.5 depth in the foundation, ditch, drain, compacting the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the empty spaces with soil again after filling the foundation and filling the remaining soil up to 50 meters. to dispose of to a distance of 0 to 1.5m 2 1.5 to 3m 3 3 to 4.50m 4 4.50 to 6m 5 6 to 7.50m 6 7.50 to 9m 7 9 to 10.50m 8 10.50 to 12m 9 12 to 13.50m 10 13.5 to 15m 11 15 to 16.50m 12 16.5 to 18m 13 18 to 19.50m 14 19.5 to 21m 15 21 to 23.5m 16 23.5 to 25m 17 25 to 26.5m 18 26.5 to 28m 19 28 to 29.5m 20 first class brick masonry in foundation and plinth cement-sand 1:6 mortar, including closing of side holes and leveling. 21 centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : 22 providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). 23 reinforcement for r.c.c. work at all levels including straightening, cutting, bending, placing in position and binding all complete. 24 providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications and as per clause 2504 of mort&h specification. 25 cement plastering including t&p, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including providing /mixing of synthetic fibers compulsorily complying with is 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of cement i.e. 125 gms per 50 kg cement up to 900 gms per cum of concrete/ mortar 26 cement plastering including t&p, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including providing /mixing of synthetic fibers compulsorily complying with is 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of cement i.e. 125 gms per 50 kg cement up to 900 gms per cum of concrete/ mortar 27 add extra for gate 28 pipe 29 add 3 % contygency
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results