BRR : 9107754
Tender Brief : Tender For Rate contract for various types of forestry development works with the help of machines in situ with advance soil work in all the ranges- 1 Digging of Ditch/ Trencby mechanical means of desired shape and size including dressing and laying of excavatgted soil in contunuous mound and dressing of mound 2 Hard soil Between 10 to 30% Boulders 3 Hard soil Between 30 to 50% Boulders 4 Hard soil With Above 50 % Boulders 5 in Hard Muram/canker/compact clayey soil 6 Digging of pits (Size 0.60x0.60x0.60 cubic meter ) by JCb Machine 7 Hard soil Between 10 to 30% Boulders 8 Hard soil Bet... Read More
Tender Value
₹
45,00,000
Submission Date
27-02-2025
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics |
Work Detail
tender for rate contract for various types of forestry development works with the help of machines in situ with advance soil work in all the ranges- 1 digging of ditch/ trencby mechanical means of desired shape and size including dressing and laying of excavatgted soil in contunuous mound and dressing of mound 2 hard soil between 10 to 30% boulders 3 hard soil between 30 to 50% boulders 4 hard soil with above 50 % boulders 5 in hard muram/canker/compact clayey soil 6 digging of pits (size 0.60x0.60x0.60 cubic meter ) by jcb machine 7 hard soil between 10 to 30% boulders 8 hard soil between 30 to 50% boulders 9 in hard muram / kanker/compact clay soil 10 hard soil havind more then 50 % boulders 11 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 12 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m in sandy loam soil 13 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m in clay load soil 14 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m inhard soil upto 10% boulders 15 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m in hard soil between 10 tp 30 % boulders 16 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m in hard soil between 30 to 50 % boulders 17 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45 cubic m in hard muram/kankar/compact clay soil 18 digging of new pits size 0.45x0.45x0.45 m or 0+0.40) /2x(0.50+0.40)/2x0.45cubic m in hard soil having more than50 boulders 19 juliflora eradication by jcb machine includingcleaning of site 20 30 cm tree collar girth 21 30-60 cm tree collar girth 22 earth work of bund embakment in dry or moist soild with the help of tractor attched with sracpper including laying in the layer of 15 cm breaking of cloods sorting of grass pebbles etc. and drtessing in required profileehn compacted manually within intial lead of 30 m and lift ohfl.50 rate of tractor (30-40hp) with pol and scrapper ( excluding charges of water ing and compaactions) in hardy soil
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results