BRR : 9099968
Tender Brief : Tender For 06 -public place strip stone ceiling pouring - 1 As Per RUIDP SOR 2023 2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 3 Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) 4 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanic... Read More
Tender Value
₹
5,00,000
Submission Date
19-02-2025
Participated Bidder List
1 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics |
Work Detail
tender for 06 -public place strip stone ceiling pouring - 1 as per ruidp sor 2023 2 providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work upto plinth level : 3 brick work with fps bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :cement mortar 1:6 (1 cement : 6 coarse sand) 4 reinforcement for r.c.c. work at all levels including straightening, cutting, bending, placing in position and binding all complete.thermo-mechanically treated bars. 5 cement plastering including t&p, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) 6 providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete 7 wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:two or more coats on new work 8 providing sand stone slab for roofing and laying them in cement mortar 1 : 4 (1 cement : 4 coarse sand) over wooden karries or r.c.c. battens (karries and battens to be paid separately) including pointing the ceiling joints with cement mortar 1:3 (1 cement : 3 fine sand ) complete :red sand stone slab 9 structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 10 total s.no 02 to 09 amount 13041.30say 5.00lacs
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results