BRR : 9033244
Click Here To View Tendering Authority. Technical Bid City/State :  jhalawar, Rajasthan
Tender Brief : Excavation Of Trenches, Laying Plp & Blowing Of Cable With Associated Works: 4G Saturation Project For Patti Bts In Jhalawar Ssa - Excavation Trenches Upto A Depth Of 1.65 M And Back Filling The Excavated Trenches After Laying The Hdpe / Plb Pipe With Or Without Protection For All Kind Of Soils At Below Gp Locations As Per Tender Specification ( Oft ) 3 Patti Bts 4 Laying Of Plb Hdpe Pipe By Hdd Method At A Depth Of 1.65Cm Or More ( For Single Plb Pipe ) ( Ofh ) 5 The Bsnl Will Supply Only Plb Hdpe Pipes / Coil Pp Rope 6 Laying Of Single Plb Hdpe Pipes / Coil, Coupled With C... Read More
Tender Value
9,35,259
Submission Date
31-12-2022
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
Work Detail
excavation of trenches, laying plp & blowing of cable with associated works: 4g saturation project for patti bts in jhalawar ssa - excavation trenches upto a depth of 1.65 m and back filling the excavated trenches after laying the hdpe / plb pipe with or without protection for all kind of soils at below gp locations as per tender specification ( oft ) 3 patti bts 4 laying of plb hdpe pipe by hdd method at a depth of 1.65cm or more ( for single plb pipe ) ( ofh ) 5 the bsnl will supply only plb hdpe pipes / coil pp rope 6 laying of single plb hdpe pipes / coil, coupled with coupler ( lph ) 7 each additional pipe 8 the bsnl will supply plb pipe plbsockets / coupler, end caps 9 laying and fixing of dwc pipes ( as per existing tec gr no. with latest amendment ) isi specification in trenches on bridges, culverts and lead in at g.p.s with plb hdpe pipes / coils in side ) . ( dwctb ) 10 the bsnl will supply g.i. troughs pipes in length of approx. 6 m clamps and plb hdpe pipes / coils 11 laying of full round rcc ( isi mark ) / dwc pipe ( as per existing tec gr no. gr / dwc-34 / 01sept2007 with latest amendment ) in trenches over plb hdpe pipes / coils, on culverts / bridges / nullah and for cases where cable is laid less depth ( wherever required ) 12 bsnl will supply only rcc / dwc pipes and plb hdpe pipe. all other material shall be arranged by contractor. 13 providing cement concrete 1:2:4 over the plb hdpe pipe / dwc pipe / gi pipe in roads, bridges, crossing and culverts and for low depth protection or wheel guards of bridges as specified in the construction practices of of cable construction including material ( ccw ) 14 plb hdpe ducts, g.i. pipes.will be supplied by the bsnl. all other meterials required for the work shall be arranged by contractor rates include cost of material and standard curring shultering etc . 15 cable laying by pulling / blowing 16 laying of cable upto 48f by pulling / blowing method including openning of mamhole.sealing of plb hdpe pipes ( ofpb ) 17 laying of cable of 96fby pulling / blowing method including openning of mamhole.sealing of plb hdpe pipes ( ofpb ) 18 bsnl will provide only of cable. all other meterials required for the work shall be arranged by the contractor 19 splicing of of cable 20 splicing of fibers of 24f of cable in existing / new joint chambers or atftb for making straight / branch joints on new routes or at fpoi and end to end testing of all fibers after splicing.the rates specified are inclusive of installation of and splicing of splitters also whereever applicable. ( ssbj ) 21 splicing of fibers of 48f of cable in existing / new joint chambers for making straight / branch joints on new routes or at fpoi and end to end testing of all fibers after splicing.the rates specified are inclusive of installation of and splicing of splitters also whereever applicable. ( ssbj ) 22 splicing of all the fibers ofof cable in the fiber termination box at the gram panchyats and testing all the fibers for continuity.this will also include installation / mounting of the ftb and spare cable chamber as specified ( sftb ) 23 note:- all tools splicing machine and instruments required for above work shell be arranged by the contractor 24 jointing chamber 25 construction of pre fabricated rcc joints chamber as per specification as specified in the tender document / construction practices ( jcrc ) 26 all materials required for the work shall be arranged by the contractor 27 route indicator 28 supply and fixing of rcc / stone route / joint indicator , painting , sign writing as per tender document. ( risr ) 29 restoration of road surface 30 boring / cutting ( morrum / pucca road ) / black top or concrete road ( depth 165cm ) at road crossing and any other anavoidable hindrance ( mbr ) 31 road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm including supply of material to evenly matching the road. ( rrsc ) 32 all materials required for the shall be arranged by contractor 33 route index diagram 34 supply of route index diagram in 4 hardcopiesas well as 1 soft copy on cd containing diagrams and all details including lat / long of each joint / route indicator on good quality paper for complete block ( drid ) 35 the contractor shall arrange all materials required for the work 36 laying of of cable in building ( leading in work ) 37 laying of of cable in corridor / riser / exchange premises ( leading in work ) ( loib ) 38 pvc / tuflex pipe shall be provided by the bsnl. all other materials required for the work shall be arranged by the contractor 39 mouting of fdms at bts / exchange / olt locations 40 all materials required for the work shall be arrange by the contractor 41 recovery of store 42 cost of recovery cable drum ( recd ) excavation trenches upto a depth of 1.65 m and back filling the excavated trenches after laying the hdpe / plb pipe with or without protection for all kind of soils at below gp locations as per tender specification ( oft ) 3 patti bts 4 laying of plb hdpe pipe by hdd method at a depth of 1.65cm or more ( for single plb pipe ) ( ofh ) 5 the bsnl will supply only plb hdpe pipes / coil pp rope 6 laying of single plb hdpe pipes / coil, coupled with coupler ( lph ) 7 each additional pipe 8 the bsnl will supply plb pipe plbsockets / coupler, end caps 9 laying and fixing of dwc pipes ( as per existing tec gr no. with latest amendment ) isi specification in trenches on bridges, culverts and lead in at g.p.s with plb hdpe pipes / coils in side ) . ( dwctb ) 10 the bsnl will supply g.i. troughs pipes in length of approx. 6 m clamps and plb hdpe pipes / coils 11 laying of full round rcc ( isi mark ) / dwc pipe ( as per existing tec gr no. gr / dwc-34 / 01sept2007 with latest amendment ) in trenches over plb hdpe pipes / coils, on culverts / bridges / nullah and for cases where cable is laid less depth ( wherever required ) 12 bsnl will supply only rcc / dwc pipes and plb hdpe pipe. all other material shall be arranged by contractor. 13 providing cement concrete 1:2:4 over the plb hdpe pipe / dwc pipe / gi pipe in roads, bridges, crossing and culverts and for low depth protection or wheel guards of bridges as specified in the construction practices of of cable construction including material ( ccw ) 14 plb hdpe ducts, g.i. pipes.will be supplied by the bsnl. all other meterials required for the work shall be arranged by contractor rates include cost of material and standard curring shultering etc . 15 cable laying by pulling / blowing 16 laying of cable upto 48f by pulling / blowing method including openning of mamhole.sealing of plb hdpe pipes ( ofpb ) 17 laying of cable of 96fby pulling / blowing method including openning of mamhole.sealing of plb hdpe pipes ( ofpb ) 18 bsnl will provide only of cable. all other meterials required for the work shall be arranged by the contractor 19 splicing of of cable 20 splicing of fibers of 24f of cable in existing / new joint chambers or atftb for making straight / branch joints on new routes or at fpoi and end to end testing of all fibers after splicing.the rates specified are inclusive of installation of and splicing of splitters also whereever applicable. ( ssbj ) 21 splicing of fibers of 48f of cable in existing / new joint chambers for making straight / branch joints on new routes or at fpoi and end to end testing of all fibers after splicing.the rates specified are inclusive of installation of and splicing of splitters also whereever applicable. ( ssbj ) 22 splicing of all the fibers ofof cable in the fiber termination box at the gram panchyats and testing all the fibers for continuity.this will also include installation / mounting of the ftb and spare cable chamber as specified ( sftb ) 23 note:- all tools splicing machine and instruments required for above work shell be arranged by the contractor 24 jointing chamber 25 construction of pre fabricated rcc joints chamber as per specification as specified in the tender document / construction practices ( jcrc ) 26 all materials required for the work shall be arranged by the contractor 27 route indicator 28 supply and fixing of rcc / stone route / joint indicator , painting , sign writing as per tender document. ( risr ) 29 restoration of road surface 30 boring / cutting ( morrum / pucca road ) / black top or concrete road ( depth 165cm ) at road crossing and any other anavoidable hindrance ( mbr ) 31 road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm including supply of material to evenly matching the road. ( rrsc ) 32 all materials required for the shall be arranged by contractor 33 route index diagram 34 supply of route index diagram in 4 hardcopiesas well as 1 soft copy on cd containing diagrams and all details including lat / long of each joint / route indicator on good quality paper for complete block ( drid ) 35 the contractor shall arrange all materials required for the work 36 laying of of cable in building ( leading in work ) 37 laying of of cable in corridor / riser / exchange premises ( leading in work ) ( loib ) 38 pvc / tuflex pipe shall be provided by the bsnl. all other materials required for the work shall be arranged by the contractor 39 mouting of fdms at bts / exchange / olt locations 40 all materials required for the work shall be arrange by the contractor 41 recovery of store 42 cost of recovery cable drum ( recd )
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download technical_151394 aoc document
Download techsummary_151394 aoc document
Download 2c5a1db8-1b2f-45f7-810a-a9105727bb97 technicalevaluation notice
Download File Name File Description
Download edf081db-207c-42bb-a3de-9fec7e77722e Tender Documents
Download BOQ_151394 Tender Documents
Download Tender351PattiBTSJhalawar Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.

TechnicalBid
Similar Tenders Results
TenderDetail
Loading tenders