BRR : 8937935
Tender Brief : Execution Of Various Work For Increasing Capacity Of Various Dtr Under Edd Jalalabad And Tilhar Under Edc Shahjahanpur-2 Safe Carriage Of Lt Abc 1*16+1*25 Sq Mm ) ( 450 Mtr ) , Lt Xlpe ( 3.5*70 ) ( 720 Mtr ) And Other Material From Store Byebagh To Site Under Including Loading And Unloading Both Sides 3 Safe Carriage Of 11 / 0.4 63 Kva Dtr From Store Byebagh To Site Under Edd Jalalabad Including Loading And Unloading Both Sides 4 Safe Carriage Of 11 / 0.4 10 Kva Dtr From Store Byebagh To Site Under Edd Jalalabad Including Loading And Unloading Both Sides 5 Stringing And Sagging Of Lt ... Read More
Tender Value
₹
Ref. Document
Submission Date
10-05-2021
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
execution of various work for increasing capacity of various dtr under edd jalalabad and tilhar under edc shahjahanpur-2 safe carriage of lt abc 1*16+1*25 sq mm ) ( 450 mtr ) , lt xlpe ( 3.5*70 ) ( 720 mtr ) and other material from store byebagh to site under including loading and unloading both sides 3 safe carriage of 11 / 0.4 63 kva dtr from store byebagh to site under edd jalalabad including loading and unloading both sides 4 safe carriage of 11 / 0.4 10 kva dtr from store byebagh to site under edd jalalabad including loading and unloading both sides 5 stringing and sagging of lt abc conductor on poles including jumpering, nozzling and winding etc complete in all respect as per respo norms 6 removing all old connections, unmounting of old transformer and mounting of 11 / 0.4 kv 63 kva new transformer at previous place including fixing all required accessories, making connection, energisation, complete in all respect. 7 erection and mounting of 11 / 0.4 kv 10 kva new transformer on dp including fixing all required accessories, making connection, energisation, complete in all respect. 8 installation of distribution box including making connections etc complete in all respect 9 erection of stay set 10 received back of old 11 / 0.4kv 25 kva transformers from various work sites to central store center, baibagh, shajahanpur including safe loading and unloading both side 11 fabrication work of stay set and others as per requirement for work completion 12 part-b 13 safe carriage of 11 / 0.4kv 63 kva dtr from store byebagh to site under edd tilhar including loading and unloading both sides 14 safe carriage of 11 / 0.4kv 25 kva dtr from store byebagh to site under edd tilhar including loading and unloading both sides 15 safe carriage of 11 / 0.4kv 100 kva dtr from store byebagh to site under edd tilhar including loading and unloading both sides 16 safe carriage of pcc poles ( 8.5 mtr ) from store byebagh, shahjahanpur to vill jallapur under edd tilhar including loading and unloading safely 17 safe carriage of acsr weasel conductor ( 150 mtr ) , lt pvc cable ( 3.5*70 sqmm ) ( 15 mtr ) and other line material from store byebagh, shahjahanpur to vill jallapur under edd tilhar including loading and unloading safely 18 erection of double pole pcc by digging pits and fixing all necessary equipments complete in all respect 19 grouting of double pole pcc by digging pits and fixing all necessary equipments complete in all respect 20 stringing and sagging of acsr weasel conductor on poles including jumpering, nozzling and winding etc complete in all respect as per respo norms 21 erection and mounting of 11 / 0.4 kv 25 kva new transformer on dp including fixing all required accessories, making connection, energisation, complete in all respect. 22 removing all old connections, unmounting of old transformer and mounting of 11 / 0.4 kv 63 kva new transformer at previous place including fixing all required accessories, making connection, energisation, complete in all respect. 23 removing all old connections, unmounting of old transformer and mounting of 11 / 0.4 kv 100 kva new transformer at previous place including fixing all required accessories, making connection, energisation, complete in all respect. 24 received back of old 11 / 0.4kv 25 kva transformers from various work sites to central store center, baibagh, shajahanpur including safe loading and unloading both side 25 received back of old 11 / 0.4kv 63 kva transformers from various work sites to central store center, baibagh, shajahanpur including safe loading and unloading both side
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | WORK_DETAIL04 | Tender Documents - WORK DETAIL |
| Download | BA7D20D2-E6BD-4913-97A2-3948E201B9A8 | Tender Documents - Tender Notice |
| Download | Tender_form04_2122 | Tender Documents - TENER DOCS |
| Download | Tendernotice_1 | Tender Documents - NIT |
| Download | BOQ_898370 | Tender Documents - BOQ |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results