BRR : 8934620
Tender Brief : Design, Engineering, Supply, Construction, Erection, Testing, Commissioning And O And M Of Decentralised Solar Power Generating System ( Spgs ) Ranging From 2 Mw To 10 Mw ( Ac ) For A Cumulative Capacity Of 25 Mw ( In 2 Lots ) At Various Locations In Mh Design, Engineering, Supply, Construction, Erection, Testing, Commissioning And O And M Of Decentralised Solar Power Generating System ( Spgs ) Ranging From 2 Mw To 10 Mw ( Ac ) For A Cumulative Capacity Of 25 Mw ( In 2 Lots ) At Various Locations In Mh , Design, Engineering, Su... Read More
Tender Value
₹
Ref. Document
Submission Date
19-01-2022
Participated Bidder List
6 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics | |||||
| 6 | cnet-technologies | Bid Analytics |
Work Detail
design, engineering, supply, construction, erection, testing, commissioning and o and m of decentralised solar power generating system ( spgs ) ranging from 2 mw to 10 mw ( ac ) for a cumulative capacity of 25 mw ( in 2 lots ) at various locations in mh design, engineering, supply, construction, erection, testing, commissioning and o and m of decentralised solar power generating system ( spgs ) ranging from 2 mw to 10 mw ( ac ) for a cumulative capacity of 25 mw ( in 2 lots ) at various locations in mh , design, engineering, supply of solar pv modules, balance of system ( bos ) including grid tie inverter, mms, transformers, ajb, cables, connectors etc. required for successful commissioning including land development & power evacuation, transportation, loading, unloading and transfer to site, insurance and other costs incidental to delivery as per tender. , erection, installation, testing & commissioning of the spgs project as per tender terms , operation & maintenance of the spgs project for 12 years as per tender terms & conditions. ( should not be less than 12% of total amount i.e. sl. no. 1+2+3 )
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results