BRR : 8924293
Tender Brief : Annual Maintenance Of 132Kv S / S Lalitpur And 132 Kv S / S Mahrauni Other Associated Work, Under Etd Jhansi , To Provide Manpower Assistance During Preventive And Breakdown Maintenance Of Bays And Lines Equipments , Transformers , Lt Supply , Hydrant System , Dg Set , Battery Bank Etc As Per Instruction Of Substation Incharge At 132Kv S / S Lalitpur And 132Kv S / S Mahrauni . Note:- 1 . Availability Of Manpower Assistance From 09:30 Hrs To 17:30 Hrs / Duty Chart Provided By Substation Incharge With Applicable Rests As Per Norms On Each S / S As Given Below . 2 . Work Involves Regularl... Read More
Tender Value
₹
Ref. Document
Submission Date
05-04-2021
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics |
Work Detail
annual maintenance of 132kv s / s lalitpur and 132 kv s / s mahrauni other associated work, under etd jhansi , to provide manpower assistance during preventive and breakdown maintenance of bays and lines equipments , transformers , lt supply , hydrant system , dg set , battery bank etc as per instruction of substation incharge at 132kv s / s lalitpur and 132kv s / s mahrauni . note:- 1 . availability of manpower assistance from 09:30 hrs to 17:30 hrs / duty chart provided by substation incharge with applicable rests as per norms on each s / s as given below . 2 . work involves regularly checking and tightening of 33kv and 132kv jumper . checking & rectification of the fault of closing and tripping ckts of different cb and isolators . replacement of damaged triping / closing coils , jaws , blades , jumper , cts , pts , poles of cb etc . and when required cleaning of battery set , leveling of fluid level , maintain of gravity , recording battery parameters as per norms of department , identification and rectification of faults of light in control room and switchyard to keep them in order , adjustment mechanism of cbs if required cleaning of insulators of equipments etc . when required . the parts which are required to replace will be given by upptcl at free of cost . the man power provided by contractor must have working experience required competence to carryout the work safely . 3 . manpower assistance to be used at any time of the day in emergency for petrolling of lines under jurisdiction of ee etd jhansi . 4 . any damaged property / equipments or any loss due to in competency or slow work or non availability of staff shall attract penalty / recovery as decided by site engineers . 5 . manpower assistance to be used at other s / s of upptcl within jurisdiction of ee etd jhansi . 6 . as per list enclosed ( annexure-b ) , t&p shall be provided by the contractor on 132kv s / s lalitpur and 132kv s / s mahrauni seperately . , 132kv s / s lalitpur , tg-ii / line man ( skilled labour ) , helper / coolies . ( unskilled lanour ) , 132 kv s / s mehrauni , tg-ii / line man ( skilled labour ) , helper / coolies . ( unskilled lanour ) , regular maintenance of flower pots , lawn , trees , shrubs hedges , ground cover , flower beds in lown approximate area 600 sqr . mtr . by deputing required no . of well experienced gardeners including weeding out of all undesired growths , watering , trimming , forking , making loose soil around plant , lawn etc . including replacement of dried plants , grass with fresh plant of same variety including cowdung manure and its spreding , with all men and material and t&p to complete the job as per direction by site engineers on the sub-stations mentioned below . , 132kv s / s lalitpur . , daily cleaning of complete control room building including battery room , toilets , bathroom , committee room with harpic / phenyl , cleaning of roads of switchyard etc . involving brooming a day , mopping daily with harpic / phenyl , dusting of walls , panels regularly with men & material . . cleaning material ie . harpic / phenyl , scrub / wastage cotton cloths , broom and t&p provided by the contractor on the sub-stations mentioned below , 132kv s / s lalitpur , 132kv s / s mehrauni
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results