BRR : 8899827
Tender Brief : supply of Glass Bead Cluster , batch house batch house capacity -suitable for 2mt glass production , with feeding & storage loading systems ( mechanical or pneumatic ) customised for the specific raw material , for making reliable filling of the silos . , materials are weighed by fully electronic scales . the scales are specifically dimensioned with regard to the individual components and optimal precision is maintained a homogeneous batch is essential to achieve good melting efficiency . high-performance mixer . ultra-modern automated equipment ( programmable logic controller ) , weighing an... Read More
Tender Value
₹
54,50,000
Submission Date
20-03-2020
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics |
Work Detail
supply of glass bead cluster , batch house batch house capacity -suitable for 2mt glass production , with feeding & storage loading systems ( mechanical or pneumatic ) customised for the specific raw material , for making reliable filling of the silos . , materials are weighed by fully electronic scales . the scales are specifically dimensioned with regard to the individual components and optimal precision is maintained a homogeneous batch is essential to achieve good melting efficiency . high-performance mixer . ultra-modern automated equipment ( programmable logic controller ) , weighing and dosing computers as well as a scada system for visualising the processes control and monitor batch production . fully automatic and completely independent of human intervention . scada stations control the dialogue between man ( the operator ) and the machine ( the plant ) . these can be integrated both into the batch plant control room and centrally in the furnace control room with proper conveying methodology note: we need equipment on turnkey basis , raw material storage cell all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , silo mixed batch all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , magnetic separator 500 kg / h all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , cullet processing plant all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , incline conveyer all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , vibrating sieve all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , weighting balance digital capacity 2mt all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , electronic balance capacity 500 grm all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , bucket elevator for cullet & sand all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , bucket elevator for feeding batch all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , conveyer for feeding batch all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , conveyer all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , hopper all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis , batch charges all these equipments are requiered to meet the production capecity of 2 mt ton glass production . note: we need equipment on turnkey basis
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid