Tender Brief : Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India Supply Of Centrifugal Pumps For Guwahati Refinery Revamp Of Cdu, Nsf And Nsu Of Ms Indian Oil Corporation Limited, India , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Vendor To Arrange Tpia Including All Tpia Charges ) , Supervision During Errection, Pre-Com, Commissioning, Packing, Supply Of The Equipmen... Read More
Tender Value
₹
Ref. Document
Submission Date
16-03-2022
Participated Bidder List
5 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | |||||
| 4 | cnet-technologies | Bid Analytics | |||||
| 5 | cnet-technologies | Bid Analytics |
Work Detail
supply of centrifugal pumps for guwahati refinery revamp of cdu, nsf and nsu of ms indian oil corporation limited, india supply of centrifugal pumps for guwahati refinery revamp of cdu, nsf and nsu of ms indian oil corporation limited, india , design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, testing at manufacturers works, inspection by tpia ( vendor to arrange tpia including all tpia charges ) , supervision during errection, pre-com, commissioning, packing, supply of the equipment as specified in the document, including supply of commissioning spares ( note-1 ) & special tools and tackles, all auxiliaries & documentation as per the enclosed standard specifications, job specification, data sheets etc. and other codes and standards attached and as specified in material requisition. , sr-kero-i pumps ( 01-p-31 a / b ) centrifugal pumps with mechanical seal, seal flushing system, bearing lubrication & cooling system if applicable, coupling and no sparking coupling guard, motor with terminal box, motor canopy, motor protecting auxiliaries like space heater, rtds, btds and their respective terminal boxes, common base frame ( with drip pan, drain nozzle pipe, flange and blind flange ) , vent valve, casing drain connection ( with pipe, drain valve, flange and blind flange ) , companion flanges if applicable. , suction strainer as per technical specifications for strainers doc no.ioclgr- cdu-upc-tss-001 , mandatory spares supply of mandatory spares for each tag as per the attached job specification , special tools and tackles as per vendor recommendation , 2 years operational spares priced list of 2 years normal operational & maintenance spares as per vendor recommendation , supervision at site vendor supervision during erection, pre-commissioning, and commissioning ( note 4 as per mr ) , splitter-i recirculation pump ( 10-p-32 a / b ) centrifugal pumps with mechanical seal, seal flushing system, bearing lubrication & cooling system if applicable, coupling and no sparking coupling guard, motor with terminal box, motor canopy, motor protecting auxiliaries like space heater, rtds, btds and their respective terminal boxes, common base frame ( with drip pan, drain nozzle pipe, flange and blind flange ) , vent valve, casing drain connection ( with pipe, drain valve, flange and blind flange ) , companion flanges if applicable. , suction strainer as per technical specifications for strainers doc no.ioclgr- cdu-upc-tss-001 , mandatory spares supply of mandatory spares for each tag as per the attached job specification , special tools and tackles as per vendor recommendation , 2 years operational spares priced list of 2 years normal operational & maintenance spares as per vendor recommendation , supervision at site vendor supervision during erection, pre-commissioning, and commissioning ( note 4 as per mr ) , splitter-i reflux pump ( 10-p-33 a / b ) centrifugal pumps with mechanical seal, seal flushing system, bearing lubrication & cooling system if applicable, coupling and no sparking coupling guard, motor with terminal box, motor canopy, motor protecting auxiliaries like space heater, rtds, btds and their respective terminal boxes, common base frame ( with drip pan, drain nozzle pipe, flange and blind flange ) , vent valve, casing drain connection ( with pipe, drain valve, flange and blind flange ) , companion flanges if applicable. , suction strainer as per technical specifications for strainers doc no.ioclgr- cdu-upc-tss-001 , mandatory spares supply of mandatory spares for each tag as per the attached job specification , special tools and tackles as per vendor recommendation , 2 years operational spares priced list of 2 years normal operational & maintenance spares as per vendor recommendation , supervision at site vendor supervision during erection, pre-commissioning, and commissioning ( note 4 as per mr ) , topped crude pump ( 01-p-34 a / b ) centrifugal pumps with mechanical seal, seal flushing system, bearing lubrication & cooling system if applicable, coupling and no sparking coupling guard, motor with terminal box, motor canopy, motor protecting auxiliaries like space heater, rtds, btds and their respective terminal boxes, common base frame ( with drip pan, drain nozzle pipe, flange and blind flange ) , vent valve, casing drain connection ( with pipe, drain valve, flange and blind flange ) , companion flanges if applicable. , suction strainer as per technical specifications for strainers doc no.ioclgr- cdu-upc-tss-001 , mandatory spares supply of mandatory spares for each tag as per the attached job specification , special tools and tackles as per vendor recommendation , 2 years operational spares priced list of 2 years normal operational & maintenance spares as per vendor recommendation , supervision at site vendor supervision during erection, pre-commissioning, and commissioning ( note 4 as per mr ) , naphtha splitter feed pump ( 056-p-51 ( n ) a / b ) centrifugal pumps with mechanical seal, seal flushing system, bearing lubrication & cooling system if applicable, coupling and no sparking coupling guard, motor with terminal box, motor canopy, motor protecting auxiliaries like space heater, rtds, btds and their respective terminal boxes, common base frame ( with drip pan, drain nozzle pipe, flange and blind flange ) , vent valve, casing drain connection ( with pipe, drain valve, flange and blind flange ) , companion flanges if applicable. , suction strainer as per technical specifications for strainers doc no.ioclgr- cdu-upc-tss-001 , mandatory spares supply of mandatory spares for each tag as per the attached job specification , special tools and tackles as per vendor recommendation , 2 years operational spares priced list of 2 years normal operational & maintenance spares as per vendor recommendation , supervision at site vendor supervision during erection, pre-commissioning, and commissioning ( note 4 as per mr ) => limited
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 4cd19097-b1c8-4ed2-bcaa-5298b1e61008 | Tender Documents |
| Download | BOQ_157360 | Tender Documents |
| Download | FAQs-IOCL-Online-EMD | Tender Documents |
| Download | Special_Instructions_to_t | Tender Documents |
| Download | Tender-Acceptance-Format | Tender Documents |
| Download | Tendernotice_1 | Tender Documents |
| Download | Work_TR_02 | Tender Documents |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Technical Evaluation In Progress
Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.
TechnicalBid
Similar Tenders Results