Click Here To View Tendering Authority. Technical Bid City/State :  Mayapur , Nadia, West Bengal
Tender Brief : Construction Of Cable Trench , 01 No . Ct , 01 No . Vcb , 01 No . Pt Foundation And Allied Civil Work At Mayapur 33 By 11 Kv Sub-Stn Under Krishnanagar ( D ) Division In The District Of Nadia . , Earthwork In Excavation Of Foundation Trenches Or Drains All The Sorts Of Soil ( Including Mixed Soil But Excluding Literate Or Sand Stone ) Including Removing . Spreading Or Stacking The Spoil With In A Lead Of 75 M . As Directed . The Items Include Necessary Trimming The Sides Of Trenches Leveling And Ramming The Bottom Bailing Out Water As Required Complete . Dep... Read More
Tender Value
8,04,916
Submission Date
23-02-2021
Participated Bidder List
5 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics
4 cnet-technologies Bid Analytics
5 cnet-technologies Bid Analytics
Work Detail
construction of cable trench , 01 no . ct , 01 no . vcb , 01 no . pt foundation and allied civil work at mayapur 33 by 11 kv sub-stn under krishnanagar ( d ) division in the district of nadia . , earthwork in excavation of foundation trenches or drains all the sorts of soil ( including mixed soil but excluding literate or sand stone ) including removing . spreading or stacking the spoil with in a lead of 75 m . as directed . the items include necessary trimming the sides of trenches leveling and ramming the bottom bailing out water as required complete . depth of excavation not exceeding 1500 mm . , earth work in filling in foundation trenches or plinth with good earth , in layers not exceeding 150 mm . including watering and ramming etc . layer by layer complete . ( payment to be made on the basis of measurement of finished quantity of work ) ( a ) with earth obtained from excavation of foundation . , cement concrete with graded stone ballast ( 40 mm size excluding shuttering ) in ground floor ( a ) [pakur variety] ( a ) 1:3:6 proportion , ordinary cement concrete ( mix 1:1 . 5:3 ) with graded stone chips ( 20 mm nominal size ) excluding shuttering and reinforcement if any , in ground floor as per relevant is codes . ( i ) pakur variety , reinforcement for reinforced concrete work in all sorts of structure including all distribution bars , stirrups , binders etc including supply of rods initial straightening and removal of loose rust ( if necessary ) cutting to requisite length , hooking and binding to correct shape , placing in proper position and binding with 16 gauge black annealed wire at every intersection complete as per drawing and direction . ( a ) for works in foundation , basement and upto roof of ground floor/upto 4 m ( i ) tor steel/mild steel , 125 mm . thick brick work with 1st class bricks in cement mortar ( 1:4 ) in ground floor . i ) in super structure ground floor . , plaster ( to wall , floor , ceiling etc . ) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating , nosing and drip course , scaffolding/staging where necessary ( ground floor ) . [excluding cost of chipping over concrete surface] ( i ) with 1:6 cement mortar ( b ) 15 mm thick plaster , neat cement punning about 1 . 5mm . thick in wall , dado , window sills , floor , drain etc . , m . s . structural works in columns , beams etc . with simple rolledstructural members ( e . g . joists , angle , channel sections conformingto is: 226 , is: 808 & sp ( 6 ) - 1964 connected to one another withbracket , gussets , cleats as per design , direction of engineer-incharge complete including cutting to requisite shape and length , fabrication with necessary bolting , metal arc welding conforming tois: 816- 1969 & is: 1995 using electrodes of approved make andbrand conforming to is:814- 2004 , haulage , hoisting and erectionall complete . the rate includes the cost of rolled steel section , consumables such as electrodes , gas and hire charge of all tools andplants and labour required for the work including all incidentalchages such as electricity charges , labour insurance charges etc . payment to be made on the basis of calculated weight of structuralmembers only in finished work as per is specified weight . paymentfor gusset , bracket , cleat , rivets , bolts and nuts may be make byadding the actual weight of such items with the weight of finishedstructural members or 7% of weight for finished structural membersweighing not less than 22 . 5 kg . / m . or 15 % of weight for finishedstructal members weighing less than 22 . 5 kg . / m . may be increasedallow for bracket , cleat , rivet , bolts and nuts etc . and no seperatepayment being made for these items , as per direction of engineer incharge . the rates are considered for a height of erection 8m . / 2ndfloor level from the ground . add 1 . 5% extra over the rate for eachadditional floor or 4m . beyond initiial 8m . or part thereof . i ) for structural members of specified sections weighing less thanwasher or screws etc . ( length of straight not less than 230mm ) . , priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc . , ( a ) painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc . including using of approved putty etc . on the surface , if necessary : ( b ) on steel or other metal surface :with super gloss ( hi-gloss ) - ( iv ) two coats ( with any shade except white ) , hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs , beams and columns , lintels curved or straight including fitting , fixing and striking out after completion of works ( upto roof of ground floor ) . ( a ) 25 mm to 30 mm thick wooden shuttering as per decision & direction of engineer-in-charge . , ( f ) 25 mm to 30 mm shuttering without staging in foundation , dismantling all types of masonry excepting cementconcrete plain or reinforced , stacking serviceablematerials at site and removing rubbish as directedwithin a lead of 75 m . in gr floor including roof , dismantling all types of plain cement concrete works , stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m . in gr floor including roof upto 150mm thk , dismantling r . c . floor , roof , beams etc . includingcutting rods and removing rubbish as directedwithin a lead of 75 m . including stacking of steelbars .
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download technical_616846 aoc document
Download techsummary_616846 aoc document
Download 64054ba1-9790-4acc-ba2c-c1634bf0577b technicalevaluation notice
Download File Name File Description
Download BOQ_616846 Tender Documents - BOQ
Download Tendernotice_1 Tender Documents - NIT
Download EF8934F9-F62F-4636-B191-9FBC265538DE Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Technical Evaluation In Progress

Technical bid evaluation is currently in progress. Awarded bidder details will be available after completion of technical scrutiny.

TechnicalBid
Similar Tenders Results
TenderDetail
Loading tenders